112 Mix Design for construction of ATC tower, Biju patnaik International Airport, Bhubaneswar Airport Authority of India Dr. Dinakar Pasla
SIF
                         
1.88
 
2 Months 
10.07.2017
CP112
Completed
111 Mix Design for M25 and M30 Grade concretes M/s Rathee, NBCC Dr. Dinakar Pasla
SIF
                         
2.39
 
2 Months 
10.07.2017
CP111
Completed
110 Geotechnical investigations on soil/rock samples Vedanta Limited Dr. B Hanumantha Rao
SIF
                              
-  
                              
-  
-
CP110
Approved
109 Evaluation of Terrazyme (A bioenzyme) stabilized roads constructed under PMGSY Avijeet Agencies Dr. U C Sahoo
SIF
                       
25.00
 
2 Years 
12.06.2017
CP109
On-going
108 Examination of soundness of the intake well at Pankapal on the bank of river Bramhani, Dist: Jajpur IDCO Dr. Arindam Sarkar
SIF
                       
16.17
 
2 Months 
30.05.2017
CP108
On-going
107 Work on technical support of Cold-Mix technology SAPCO Bitumen Company Ltd Dr. U C Sahoo
SIF
                       
30.00
 
3 Years 
25.04.2017
CP107
On-going
106 Designing of video synopsys algorithms for visual surveillance Korea Institute of Science and Technology Dr. Debi Prosad Dogra
SES
                       
40.39
 
2 Years 
26.04.2017
CP106
On-going
105 Design and drawing of minor bridges of RVNL proof checking Rail Vikas Nigam Ltd Dr. S R Dash
SIF
                         
8.63
 
4 Months 
12.04.2017
CP105
On-going
104 Mix Design of cement treated base/ sub-base for PMGSY road  in Odisha Rural Works Department, Govt. of India Dr. U C Sahoo
SIF
                       
11.50
 
2 Months 
20.03.2017
CP104
On-going
103 Proof checking of launching scheme of composite girders for ROB no 439 A and 423A of RVNL Sambalpur Titlagarh Project M/s Rahee Infratech Ltd Dr. S R Dash
SIF
                         
1.15
 
2 weeks 
05.04.2017
CP103
Completed
102 Vetting/ Proof checking of refrigeration for 3000 MT and 5000 MT Engineering Projects (India) Ltd Prof. S K Mahapatra
SMS
                         
3.59
 
2 weeks 
06.04.2017
CP102
On-going
101 Strategies to counter energy imbalances in an aluminium reduction cell with an insert in the cathode collector bar Tata International Ltd Dr. Randhir Singh
SMMME
                         
1.27
 
6 months 
22.03.2017
CP101
On-going
100 Proof Checking of Structural Items of Rambili Project Suvadra Consultant Dr. S R Dash
SIF
                       
14.95
18.03.2017
CP100
On-going
99 Vetting of second floor structure of CESU building for additional load IDCO Dr. B Hanumantha Rao
SIF
                         
1.87
 
2 Months 
06.03.2017
CP099
Completed
98 Dyke hight raising of Fly-Ash pond Vedanta Ltd Dr. B Hanumantha Rao
SIF
                         
6.74
 
2 Months 
CP098
 
Approved
97 Characterisation of soils treated with Zydex products for its use in PMGSY Roads Zydex Industries (P) Ltd Dr. U C Sahoo
SIF
                         
2.30
 
2 Months 
01.03.2017
CP097
On-going
96 Mix Design for WMM & GSB with optimum utilisation of granulated slag Tata Steel Ltd Dr. U C sahoo
SIF
                         
1.15
 
1 Week 
09.02.2017
CP096
On-going
95 Accretion control to increase the sponge iron production to the target annual capacity of 390000 Mt Tata Sponge Iron Ltd Dr. Brahma Deo
SMMME
                       
13.11
 
1 Year 
15.03.2017
CP095
On-going
94 Proof checking of major bridge @ Ch 1+445 of NH-149 pallahara to Pitiri Section, Odisha RKD Construction (P) Ltd Dr. S R Dash
SIF
                         
1.73
 
1 month 
26.01.2017
CP094
Completed
93 Review of science hopper lab in the class program - Physics Science Hopper Education (P) Ltd., Bangalore Dr. S Chatterjee
SBS
                         
0.67
 
3 month 
20.01.2017
CP093
Completed
92 Vetting of design and drawings of aranya bhavan 6th floor conference room  IDCO Dr. B Hanumatha Rao
SIF
                         
1.50
 
2 week 
02.01.2017
CP092
Completed
91 Structural stability for the building with revised loading conditions of 2nd floor level with its retrofitting actions NBCC (I) Ltd. Dr. Sumanta Halder
SIF
                         
8.00
 
3 month 
09.01.2017
CP091
Completed
90 Vetting of the AFS Hanger at Bagdogra, super structure drawing (Steel Structure) M/s MES Engineering, Kolkata Dr. Goutam Mondal
SIF
                         
1.75
 
1 month 
30.01.2017
CP090
Completed
89 Third party sudit on the fly ash generation & utilization by TPPs in Odisha for the year 2015-16 M/s State Pollution control Board Dr. B hanumatha Rao
SIF
                         
2.59
 
2 week 
CP089
On-going
88 Proof Checking of Design Splice & its adequacy by M/s S M Consultancy for 30m FOB girder Rail Vihar Nigam Ltd. Waltair Dr. S R Dash
SIF
                         
0.41
 
2 week 
09.01.2017
CP088
Completed
87 Monitoring and quality assurance of construction of international standard sport climbing wall at kalinga stadium, BBSR Outdoor School Dr. Sumanta Halder
SIF
                         
7.10
 
3 months 
09.01.2017
CP087
On-going
86 Proof checking of design and drawing of substructure for 16 nos of major bridges of RVNL Rail Vihar Nigam Ltd. BBSR Dr. S R Dash
SIF
                       
11.00
 
6 months 
09.01.2017
CP086
On-going
85 Testing pf CC cores of RE Facia Panel NHAI, PIU-BBSR Dr. U C Sahoo
SIF
                         
1.73
 
1 week 
02.01.2017
CP085
On-going
84 Safety consultancy for construction of new road at the missing link portion of NH81 along the approved alignment between Harischandrapur and eastern approach of kalindri - bridge from Km 46.550 to km59.697 in the district of Malda, West Bengal on EPC mode Dynamic Projects (P) Ltd Dr. P P Dey
SIF
                         
2.30
 
1 year 
21.12.2016
CP084
On-going
83 Proof checking of design and drawings of substructure for 6 nos of major bridges of RVNL Rail Vikas Nigam Ltd Dr. S R Dash
SIF
                         
2.16
 
1.5 month 
15.11.2016
CP083
Completed
82 Quality test of Railway track stone (Gudiakateni & Chandikhol) Jyoti Construction Dr. U C sahoo
SIF
                         
0.30
 
1 week 
22.11.2016
CP082
Completed
81 Development of structural grade concretes utilizing Iron slag as sand replacements (Tata Steel, Jaipur, Odisah) Tata Steel, Kalinga Nagar Dr. Dinaka Pasla
SIF
                         
5.74
 
3 month 
21.10.2016
CP081
Completed
80 Proof checking of design and drawing of substructure and foundation abutment-2 of bridge no -76 Rail Vikas Nigam Ltd Dr. S R Dash
SIF
                         
0.86
 
2 weeks 
17.10.2016
CP080
Completed
79 Vetting of Structural design and drawing of the Dinjan Hanger foundation LLOYD Insulations Ltd Dr. Goutam Mondal
SIF
                         
0.30
 
1 month 
21.06.2016
CP079
Completed
78 Analysis and Implementation of non chronological video synopsis and indexing Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra
SES
                       
15.00
 
1 year 
04.10.2016
CP078
On-going
77 Technical support on pile design in L iquefiable soils for the building at the Sewage Treatment Plant (Tunasan STP) Vatech Wabag Ltd Dr. S R Dash
SIF
                         
2.88
 
2 weeks 
26.09.2016
CP077
Completed
76 Proof checking of structural calculation/ drawing for proposed construction of JNV/ Nayagarh (Phase-B) works at Odisha Buildsol, Architectural & Engineering Consultants Dr. S R Dash
SIF
                         
0.65
 
2 weeks 
17.09.2016
CP076
Completed
75 Widening and strengthening of Khunti-Torpa-Kolebira Road (from 0.00 km to 82.055 km) to 2-lane with paved shoulder to work as safety consultancy Gawar-S.C.C. (JV), Rahtak, Haryana Dr. P P Dey
SIF
                         
3.52
 
1.6 year 
09.09.2016
CP075
Completed
74 Mix design for glass fibre reinforced concrete for IMDC Mancheswar, Bhubaneswar NBCC, Bhubaneswar Dr. Dinakar Pasla
SIF
                         
1.64
 
3 month 
17.08.2016
CP074
On-going
73 Vetting of feasibility study of pre-treatment of coke oven and by-product plant effluent in coal gasification process units for recovery of Phenol and Ammonia Jindal Steel and Power Limited Dr. P Bhunia
SIF
                         
5.75
 
1.5 month 
11.08.2016
CP073
Completed
72 Proof checking of design and drawing of road under bridge (RUB) No-68 of RVNL Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash
SIF
                         
0.36
 
1 month 
09.08.2016
CP072
Completed
71 Widening and strengthening from km 94.000 to 131.000 of NH-133 in the state of Jharkhand through EPC Basis contract – as safety consultant Gawar-S.C.C. (JV), Rahtak, Haryana Dr. P  P Dey
SIF
                         
1.59
 
1 year 
01.05.2016
CP071
Completed
70 Mix Design for M25 for Mahanadi Institute of medical sciences and research at Talcher , Angul, Odisha NBCC, Talcher Dr. Dinakar Pasla
SIF
                         
3.11
 
3 month 
27.07.2016
CP070
On-going
69 Study of Probabilities and changes in frequencies and intensities of tropical cyclones and associated wind and rainfall over Puri district of Odisha in climate change projection [Period: 1891-2015] Institute for Social and Environmental Transition-International (ISET-I) Prof. U C Mohanty
SEOCS
                         
4.02
 
3 month 
28.07.2016
CP069
On-going
68 Mix Design of M30 Grade Concrete for ITC Hotel Prime Techno Engineers (P) Ltd. Dr. Dinakar Pasla
SIF
                         
0.45
 
1 month 
02.07.2016
CP068
On-going
67 Endorsement of the estimation of production quantities of sponge iron and steel billets of Maa Mahamaya Industries Ltd, R.G. Peta in the years 2006-07, 2007-08 and 2008-09 from the charge mix used Maa Mahamaya Industries Ltd Dr. V Panduranga
SMS
                         
1.20
 
1 Week 
07.07.2016
CP067
Completed
66 Proof checking of design and drawing for 2 nos of S&T Cabin building for M/S NTPC at Kaniha RITES Ltd Dr. S R Dash
SIF
                         
0.72
 
2 week 
17.06.2016
CP066
Completed
65 Proof checking of design and drawing of substructure for major bridges no 115 and 131 Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash
SIF
                         
1.15
 
1 month 
21.06.2016
CP065
Completed
64 Technical and function test of Gagan enabled GPS PDAs Conservator for Forest, GIS, Aranya Bhawan Dr. P R Sahu
SES
                         
1.95
 
1.5 month 
10.05.2015
CP064
Completed
63 Video analysis algorithms to detect unusual behaviour in crowd and traffic outdu Media Tech Pvt. Ltd. Dr. Debi Prosad Dogra
SES
                         
6.52
 
3 months 
15.06.2016
CP063
On-going
62 Design and developing a portable wireless noise level and vibration monitors Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan
SES
                         
1.04
 
3 months 
15.05.2016
CP062
On-going
61 Design and developing a portable wireless air quality monitor Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan
SES
                         
2.44
 
3 month 
15.05.2016
CP061
On-going
60 Testing of Panels for energy absoption test ILFS SIF Dr. Dinakar Pasla
SIF
                         
2.86
 
1 month 
23.05.2016
CP060
Completed
59 Inspection of quality control laboratory  Maa Mahamaya Industries Ltd Dr. V Panduranga
SMS
                         
1.19
 
1 week 
06.05.2016
CP059
Completed
58 Implementation of water quality monitoring and management system  Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan
SES
                         
1.49
 
2 months 
15.04.2016
CP058
Completed
57 Testing of light weight aggregates (LWAs) in various concrete grades and the physical and chemical testing of the aggregates and also the structural load behaviour of the LWA concretes Jindal Steel and Power Limited Dr. Dinakar Pasla
SIF
                         
5.64
 
3 months 
12.05.2016
CP057
On-going
56 Proof Checkin of Design and Drawing of Substructure of Railway Bridge of RVNL Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash
SIF
                         
0.86
 
1  week 
08.04.2016
CP056
Completed
55 Vetting of structure and superstructure of sports climbing facility at Kalinga Stadium confirming to IFSC standard Outdoor School Dr. Sumanta Halder
SIF
                         
4.09
 
3 months 
10.03.2016
CP055
Completed
54 Stability study of the ash filled area Vedanta Limited Dr. B hanumatha Rao
SIF
                         
3.14
 
1 year 
CP054
Completed
53 C/C++ implementation with adequate GUI for sparsity based abnormal event detection Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra
SES
                         
7.00
 
6 months 
10.02.2016
CP053
On-going
52 C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet process Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra
SES
                         
8.00
 
6 months 
10.02.2016
CP052
On-going
51 Design and Drawing for Katekela Lagoon-2 ash pond  Vedanta Limited Dr. B hanumatha Rao
SIF
                         
8.19
1 Year
CP051
Completed
50 Strenghthening and Widening/ Reconstruction of Dumka Masalia-Nala upto West Bengal Border Road lane with paved shoulder under EPC Mode (55 km) Barbrik_RCPL(JV) Dr. P P Dey
SIF
                         
2.36
 
1year 
CP050
On-going
49 Design of experimental road using fly ash Sesa Sterlite Limited Dr. B hanumatha Rao
SIF
                         
3.08
 
2 months 
CP049
Completed
48 Technical Evaluation of cement concrete roads in Odisha Planning & Coordination Dept., Govt. of Odisha Dr. U C sahoo
SIF
                       
28.16
 
8 months 
30.10.2015
CP048
On-going
47 Technical Scrutiny of irrigation road proposal under IRC & IS Water Reseources Dept., Govt. of Odisha Dr. U C sahoo
SIF
                         
4.26
 
3 month 
13.11.2015
CP047
Completed
46 Vetting of schematic drawing along with transmission loss calculation for 6.6KV/ 415V OHDC line Megha Engineering & SIF Ltd. Dr. S B Karanki
SES
                         
0.33
 
2 weeks 
30.09.2015
CP046
Completed
45 Modelling of the Cathode assembly in Aluminium reduction cell Tata International Ltd Dr. Randhir Singh
SMMME
                         
0.74
 
3 month 
16.09.2015
CP045
Completed
44 Preparation of DPR for the proposed National Institute for New Energy & Innovation at Bhubaneswar Ministry of New Renewable Energy, Govt. of India Dr. N C Sahoo
SES
                         
5.00
14.10.2015
CP044
On-going
43 Improvement and upgradation of two lane with paved shoulder configurationof Koderma-Domchanch-Khorimahua-Jamua Road (SH-13) under EPC mode in Jharkhand NIT Durgapur Dr. P P Dey
SIF
                         
2.00
 
2 year 
27.07.2015
CP043
On-going
42 Conducting Mix Design for M50 for NBCC Bhubaneswar NBCC Ltd Dr. Dinakar Pasla
SIF
                         
1.33
 
3 month 
11.07.2015
CP042
Completed
41 Geotechnical investigations on soil/rock samples NBCC Ltd Dr. B hanumatha Rao
SIF
                         
1.20
 
1 week 
24.06.2015
CP041
Completed
40 Process optimization studies on leaching of high ash coal to produce low ash coal Tata Steel Ltd Prof. N P H Padmanabhan
SMMME
                         
6.75
 
7 month 
15.05.2015
CP040
Completed
39 Survey on process study of CPC and EPC of Amritesh Industries Pvt. Ltd, Angul Amritesh Industries Pvt. Ltd. Dr. Akhilesh Barve
SMS
                         
0.40
 
1 Week 
24.06.2015
CP039
Completed
38 Testing of Ballast from Baghua Querry Maa Chandi Stone Crushing Dr. S R Dash
SIF
                         
0.17
 
1 week 
05.06.2015
CP038
Completed
37 Surge analysis for 1000mm Dia water rising main at Jajpur IDCO Dr. Arindam Sarkar
SIF
                         
1.90
 
1 month 
27.05.2015
CP037
Completed
36 Proof checking of srtructural design nad drawing Hindustan steel works construction Ltd. Dr. S R Dash
SIF
                         
0.43
 
2 weeks 
12.05.2015
CP036
Completed
35 Survey of capacity assessment of Amritesh Industries Pvt. Ltd. Amritesh Industries Pvt. Ltd. Dr. V Panduranga
SMS
                         
0.27
 
1 week 
06.05.2015
CP035
Completed
34 Design and analysis for making rural road about 1 km by using JK Paper Mills fly ash JK Papers Mills Limited Dr. B Hanumatha Rao
SIF
                         
2.85
 
1.5 month 
20.04.2015
CP034
Completed
33 Assessment of structural safety of construction of balance six floor of the IDCOL corporate office building, BBSR IDCO Dr. Sumanta Halder
SIF
                       
12.64
 
3 month 
09.04.2015
CP033
Completed
32 Testing of materials and conducting design mix M-25,M-30 & M-40 in connection with construction of commercial cum residential complex  National Building construction corporation Ltd. Dr. P Bhunia
SIF
                         
4.38
09.04.2015
CP032
Completed
31 Report on Dolomite and its usage in sponge Iron production Ganesh Sponge (P) Ltd. Dr. Soobhankar Pati
SMMME
                         
0.30
 
1 day 
17.03.2015
CP031
Completed
30 Opinion regarding the dri reduction furnace at JSPL plant Angul Kazstroy Services SIF Pvt. Ltd Dr. Dinakar Pasla
SIF
                         
2.81
 
3 month 
18.03.2015
CP030
Completed
29 Assessing the soil for earth work construction IVRCL Limited Dr. B hanumatha Rao
SIF
                         
0.53
 
1 Week 
12.03.2015
CP029
Completed
28 Testing of AAC Blocks Overtop marketing (P) Ltd. Dr. Dinakar Pasla
SIF
                         
3.07
 
2 month 
12.03.2015
CP028
Completed
27 Testing of AAC Blocks Fast Build Blocks Pvt. Ltd Dr. Dinakar Pasla
SIF
                         
0.77
 
2 month 
13.03.2015
CP027
Completed
26 Vetting/checking of the project report prepared by CEMCPL for Ordnance Factory, Ambajhari, Nagpur Centre for Envotech and Management Consultancy (P) Ltd Dr. R R Dash
SIF
                         
1.40
 
1 month 
30.01.2015
CP026
Completed
25 Robotic application in boiler NDT assessment OMS Power Training and research Institute Dr. V Pandu Ranga
SMS
                         
3.29
 
2 months 
07.01.2015
CP025
Completed
24 Testing of Fibre shorcrete panels for energy absorption test Leighton India Contractors (P) Ltd Dr. Dinakar Pasla
SIF
                         
4.68
 
3 months 
04.12.2014
CP024
Completed
23 Design and stability analysis of an embankment for new BG rail line from Haridaspur to Paradeep in the Khurda district Odisha Tracks & Tower Infratech (P) Ltd  Dr. Hanumatha Rao
SIF
                         
3.65
 
1 month 
02.12.2014
CP023
Completed
22 Testing of Fibre shorcrete panels for energy absorption test Leighton India Contractors (P) Ltd Dr. Dinakar Pasla
SIF
                         
5.26
 
3 months 
06.11.2014
CP022
Completed
21 Issue of Check Proof Certificate and Procedure for the rectification of FOB along with necessary drawing regarding McML-ECI(JV) Dr. S R Dash
SIF
                         
1.26
 
2 Weeks 
16.09.2014
CP021
Completed
20 Assessment of High Compressibility of cut spoil Tracks & Tower Infratech (P) Ltd  Dr. B hanumatha Rao
SIF
                         
1.26
 
1 month 
16.09.2014
CP020
Completed
19 Widening & Strengthening of Bhawanipatna-Gunupur-Kasipur Road (SH-44) to 2 Lane without paved shoulder from Km 0/000 to 13/000 & Km 42/940 to Km 48/840 on EPC mode in the district of Kalahandi Office of the Executive Engineer Koraput (R&B) Division Dr. B hanumatha Rao
SIF
                         
0.50
 
1 month 
12.09.2014
CP019
Completed
18 Vetting of structural Design and Drawing for the Construction of L.I.G and L.M.I.G housing Complex along with Commercial Complex at Kalinga Nagar Zone- K4 BDA Dr. S R Dash
SIF
 
 
CP018
Cancelled
17 Impact Assessment study of city bus services operational under JnNURM Housing and Urban Development Department, Govt of Odisha Dr. Debasis Basu
SIF
                         
6.98
 
4 month 
13.08.2014
CP017
Completed
16 Proof Checking of POT cum PTFE Bearing Bhubaneswar Expressways Pvt. Ltd Dr. Dinakar Pasla
SIF
                         
1.01
 
1 month 
30.07.2014
CP016
Completed
15 Co-operation and expert advice for improvement of short and extended range (monthly scale) prediction of rainfall in the tropics RIMES Prof. U C Mohanty
SEOCS
                       
10.00
 
1 Year 
18.06.2014
CP015
Completed
14 Design and testing aerated autoclaved fly concrete blocks (AAC) Fast Build Blocks Pvt. Ltd Dr. Dinakar Pasla
SIF
                         
1.18
 
1 month 
10.05.2014
CP014
Completed
13 Consultancy for investigation in ARC, Charbatia Airports Authority of India, Biju Pattanaik Airport Dr. Dinakar Pasla
SIF
                       
13.49
 
3 month 
16.05.2013
CP013
Completed
12 Proof checking of design and drawing of three no. box bridges under Railway loading in connection with construction of railway siding to serve Koderma Thermal Power Plant (2x500MW) of DVC RITES Ltd Dr S C Dutta
SIF
                         
3.79
3 month
14.11.2012
CP012
Completed
11 Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and odisha NRRDA Dr U C Sahoo
SIF
                       
42.72
30.08.2012
CP011
On-going
10 Design of weighbridge & moveable floor crane DS Systems Dr. S N Panigrahi
SMS
                         
1.16
 
10 months 
14.06.2012
CP010
Completed
9 Design of two number of 220KV transmission line tower foundations between Kantapalli to Hindalco in the mahanadi river Hindalco
Industries Ltd.
Dr. Arindam Sarkar
SIF
                         
7.18
 
8 months 
11.04.2012
CP009
Completed
8 House hold energy consumption survey-2012 WMG Dr. S R Samantaray
SES
                         
1.20
 
1 Year 
24.03.2012
CP008
Completed
7 Proof Checking of design of pile foundations for location no. 16A and 24 of 220 KV transmission line tower from Bidanasi ( Cuttack) near the bank of Kathajodi to Nuapada (Cuttack) in the spill zone Orissa Power
Transmission
Corporation Limited
Dr. Sumanta Halder
SIF
                         
2.27
 
1 month 
19.10.2011
CP007
Completed
6 Vetting of structural analysis of design and drawing for the new residential complex at HAL Koraput HAL Prof. S C Dutta  
SIF 
                         
5.00
 
1 month 
18.10.2011
CP006
Completed
5 Proof Checking of design of river bed pile foundation for location no. 10,12 & 15 of 220KV transmission line from Bidanasi to Cuttack grid substation Orissa Power
Transmission
Corporation Limited
Dr. Sumanta Halder
SIF
                         
3.31
 
1 month 
31.05.2011
CP005
Completed
4 Preparation of special Foundation for 220KV Tower for Two locations(158-c & 159)  Hindalco
Industries Ltd.
Dr. Arindam Sarkar
SIF
                         
4.84
 
1 month 
06.05.2011
CP004
Completed
3 Proof Checking od 3 Nos panel cabin building and 1 no. gate lodge/IBS Building for M/s. Nalco Angul RITES Ltd Dr. Dinakar Pasla
SIF
                         
0.60
 
3 months 
11.10.2010
CP003
Completed
2 Remedial Measures for Horizontal and vertical
Cracks Developed in the walls, floors, roof etc of ESI Hospital, Jaykaypur
ESI Corporation Dr. Dinakar Pasla
SIF
                         
3.95
 
3 months 
06.09.2010
CP002
Completed
1 Vetting of the design of lighting masts and their foundations in connections with commissioning of lighting systems of wankahade stadium Bajaj Electricals Ltd. Prof. S.C. Dutta
SIF
                         
1.10
 
1 month 
17.09.2009
CP001
Completed