Consultancy Project

Sl.No Title Consulting Agencies PI of Project School  Value of Project
Rs. in Lakhs 
 Duration of the project  Start Date Code Status
119 Vetting of bearing capacity calculations of mission shakti bhawan at pokhariput IDCO Dr. B Hanumantha Rao SIF                           1.84  3 weeks  04.10.2017 CP119 Completed
118 Design proff checking of six-buildings of RVNL work at Haridaspur-Paradeep New BG line D K Construction Dr Goutam Mondal SIF                           1.64  1 month    CP118 Approved
117 Service as proof consultant for structural design components of proposed HL bridge over river biluakhai Eastrn India Construction (P) Ltd Dr. S R Dash SIF                           7.38  2 months  20.09.2017 CP117 Approved
116 Proof Checking of 19m RCC T Beam ROB for railway siding  Project of M/s Emami Cement Ltd. M/s Emami Cement Ltd Dr. S R Dash SIF                           1.11  2 weeks    CP116 Approved
115 Proof Checking of launching scheme of composite girders for  ROB No. 438 of RVNL Sambalpur – Titlagarh Project Rahee Infratech Ltd., West Bengal Dr. S R Dash SIF                           1.84  1 month    CP115 Approved
114 Residual stress measurement in unrestrained and restrained double "V" joints NMRL, DRDO Dr. M M Mahapatra SMS                           1.80  3 month  31.08.2017 CP114 On-going
113 Proof Checking of Design and Drawing of 14.2m steel semi through rail bridge girder Sparsh Engineering Company (P) ltd Dr. S R Dash SIF                           0.59  2 weeks  23.08.2017 CP113 On-going
112 Mix Design for construction of ATC tower, Biju patnaik International Airport, Bhubaneswar Airport Authority of India Dr. Dinakar Pasla SIF                           1.88  2 Months  10.07.2017 CP112 Completed
111 Mix Design for M25 and M30 Grade concretes M/s Rathee, NBCC Dr. Dinakar Pasla SIF                           2.39  2 Months  10.07.2017 CP111 Completed
110 Geotechnical investigations on soil/rock samples Vedanta Limited Dr. B Hanumantha Rao SIF                                -                                  -   - CP110 Approved
109 Evaluation of Terrazyme (A bioenzyme) stabilized roads constructed under PMGSY Avijeet Agencies Dr. U C Sahoo SIF                         25.00  2 Years  12.06.2017 CP109 On-going
108 Examination of soundness of the intake well at Pankapal on the bank of river Bramhani, Dist: Jajpur IDCO Dr. Arindam Sarkar SIF                         16.17  2 Months  30.05.2017 CP108 On-going
107 Work on technical support of Cold-Mix technology SAPCO Bitumen Company Ltd Dr. U C Sahoo SIF                         30.00  3 Years  25.04.2017 CP107 On-going
106 Designing of video synopsys algorithms for visual surveillance Korea Institute of Science and Technology Dr. Debi Prosad Dogra SES                         40.39  2 Years  26.04.2017 CP106 On-going
105 Design and drawing of minor bridges of RVNL proof checking Rail Vikas Nigam Ltd Dr. S R Dash SIF                           8.63  4 Months  12.04.2017 CP105 On-going
104 Mix Design of cement treated base/ sub-base for PMGSY road  in Odisha Rural Works Department, Govt. of India Dr. U C Sahoo SIF                         11.50  2 Months  20.03.2017 CP104 On-going
103 Proof checking of launching scheme of composite girders for ROB no 439 A and 423A of RVNL Sambalpur Titlagarh Project M/s Rahee Infratech Ltd Dr. S R Dash SIF                           1.15  2 weeks  05.04.2017 CP103 Completed
102 Vetting/ Proof checking of refrigeration for 3000 MT and 5000 MT Engineering Projects (India) Ltd Prof. S K Mahapatra SMS                           3.59  2 weeks  06.04.2017 CP102 On-going
101 Strategies to counter energy imbalances in an aluminium reduction cell with an insert in the cathode collector bar Tata International Ltd Dr. Randhir Singh SMMME                           1.27  6 months  22.03.2017 CP101 On-going
100 Proof Checking of Structural Items of Rambili Project Suvadra Consultant Dr. S R Dash SIF                         14.95   18.03.2017 CP100 On-going
99 Vetting of second floor structure of CESU building for additional load IDCO Dr. B Hanumantha Rao SIF                           1.87  2 Months  06.03.2017 CP099 Completed
98 Dyke hight raising of Fly-Ash pond Vedanta Ltd Dr. B Hanumantha Rao SIF                           6.74  2 Months    CP098  Approved
97 Characterisation of soils treated with Zydex products for its use in PMGSY Roads Zydex Industries (P) Ltd Dr. U C Sahoo SIF                           2.30  2 Months  01.03.2017 CP097 On-going
96 Mix Design for WMM & GSB with optimum utilisation of granulated slag Tata Steel Ltd Dr. U C sahoo SIF                           1.15  1 Week  09.02.2017 CP096 On-going
95 Accretion control to increase the sponge iron production to the target annual capacity of 390000 Mt Tata Sponge Iron Ltd Dr. Brahma Deo SMMME                         13.11  1 Year  15.03.2017 CP095 On-going
94 Proof checking of major bridge @ Ch 1+445 of NH-149 pallahara to Pitiri Section, Odisha RKD Construction (P) Ltd Dr. S R Dash SIF                           1.73  1 month  26.01.2017 CP094 On-going
93 Review of science hopper lab in the class program - Physics Science Hopper Education (P) Ltd., Bangalore Dr. S Chatterjee SBS                           0.67  3 month  20.01.2017 CP093 Completed
92 Vetting of design and drawings of aranya bhavan 6th floor conference room  IDCO Dr. B Hanumatha Rao SIF                           1.50  2 week  02.01.2017 CP092 Completed
91 Structural stability for the building with revised loading conditions of 2nd floor level with its retrofitting actions NBCC (I) Ltd. Dr. Sumanta Halder SIF                           8.00  3 month  09.01.2017 CP091 Completed
90 Vetting of the AFS Hanger at Bagdogra, super structure drawing (Steel Structure) M/s MES Engineering, Kolkata Dr. Goutam Mondal SIF                           1.75  1 month  30.01.2017 CP090 Completed
89 Third party sudit on the fly ash generation & utilization by TPPs in Odisha for the year 2015-16 M/s State Pollution control Board Dr. B hanumatha Rao SIF                           2.59  2 week    CP089 On-going
88 Proof Checking of Design Splice & its adequacy by M/s S M Consultancy for 30m FOB girder Rail Vihar Nigam Ltd. Waltair Dr. S R Dash SIF                           0.41  2 week  09.01.2017 CP088 Completed
87 Monitoring and quality assurance of construction of international standard sport climbing wall at kalinga stadium, BBSR Outdoor School Dr. Sumanta Halder SIF                           7.10  3 months  09.01.2017 CP087 On-going
86 Proof checking of design and drawing of substructure for 16 nos of major bridges of RVNL Rail Vihar Nigam Ltd. BBSR Dr. S R Dash SIF                         11.00  6 months  09.01.2017 CP086 On-going
85 Testing pf CC cores of RE Facia Panel NHAI, PIU-BBSR Dr. U C Sahoo SIF                           1.73  1 week  02.01.2017 CP085 On-going
84 Safety consultancy for construction of new road at the missing link portion of NH81 along the approved alignment between Harischandrapur and eastern approach of kalindri - bridge from Km 46.550 to km59.697 in the district of Malda, West Bengal on EPC mode Dynamic Projects (P) Ltd Dr. P P Dey SIF                           2.30  1 year  21.12.2016 CP084 On-going
83 Proof checking of design and drawings of substructure for 6 nos of major bridges of RVNL Rail Vikas Nigam Ltd Dr. S R Dash SIF                           2.16  1.5 month  15.11.2016 CP083 Completed
82 Quality test of Railway track stone (Gudiakateni & Chandikhol) Jyoti Construction Dr. U C sahoo SIF                           0.30  1 week  22.11.2016 CP082 Completed
81 Development of structural grade concretes utilizing Iron slag as sand replacements (Tata Steel, Jaipur, Odisah) Tata Steel, Kalinga Nagar Dr. Dinaka Pasla SIF                           5.74  3 month  21.10.2016 CP081 Completed
80 Proof checking of design and drawing of substructure and foundation abutment-2 of bridge no -76 Rail Vikas Nigam Ltd Dr. S R Dash SIF                           0.86  2 weeks  17.10.2016 CP080 Completed
79 Vetting of Structural design and drawing of the Dinjan Hanger foundation LLOYD Insulations Ltd Dr. Goutam Mondal SIF                           0.30  1 month  21.06.2016 CP079 Completed
78 Analysis and Implementation of non chronological video synopsis and indexing Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES                         15.00  1 year  04.10.2016 CP078 On-going
77 Technical support on pile design in L iquefiable soils for the building at the Sewage Treatment Plant (Tunasan STP) Vatech Wabag Ltd Dr. S R Dash SIF                           2.88  2 weeks  26.09.2016 CP077 Completed
76 Proof checking of structural calculation/ drawing for proposed construction of JNV/ Nayagarh (Phase-B) works at Odisha Buildsol, Architectural & Engineering Consultants Dr. S R Dash SIF                           0.65  2 weeks  17.09.2016 CP076 Completed
75 Widening and strengthening of Khunti-Torpa-Kolebira Road (from 0.00 km to 82.055 km) to 2-lane with paved shoulder to work as safety consultancy Gawar-S.C.C. (JV), Rahtak, Haryana Dr. P P Dey SIF                           3.52  1.6 year  09.09.2016 CP075 Completed
74 Mix design for glass fibre reinforced concrete for IMDC Mancheswar, Bhubaneswar NBCC, Bhubaneswar Dr. Dinakar Pasla SIF                           1.64  3 month  17.08.2016 CP074 On-going
73 Vetting of feasibility study of pre-treatment of coke oven and by-product plant effluent in coal gasification process units for recovery of Phenol and Ammonia Jindal Steel and Power Limited Dr. P Bhunia SIF                           5.75  1.5 month  11.08.2016 CP073 Completed
72 Proof checking of design and drawing of road under bridge (RUB) No-68 of RVNL Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash SIF                           0.36  1 month  09.08.2016 CP072 Completed
71 Widening and strengthening from km 94.000 to 131.000 of NH-133 in the state of Jharkhand through EPC Basis contract – as safety consultant Gawar-S.C.C. (JV), Rahtak, Haryana Dr. P  P Dey SIF                           1.59  1 year  01.05.2016 CP071 Completed
70 Mix Design for M25 for Mahanadi Institute of medical sciences and research at Talcher , Angul, Odisha NBCC, Talcher Dr. Dinakar Pasla SIF                           3.11  3 month  27.07.2016 CP070 On-going
69 Study of Probabilities and changes in frequencies and intensities of tropical cyclones and associated wind and rainfall over Puri district of Odisha in climate change projection [Period: 1891-2015] Institute for Social and Environmental Transition-International (ISET-I) Prof. U C Mohanty SEOCS                           4.02  3 month  28.07.2016 CP069 On-going
68 Mix Design of M30 Grade Concrete for ITC Hotel Prime Techno Engineers (P) Ltd. Dr. Dinakar Pasla SIF                           0.45  1 month  02.07.2016 CP068 On-going
67 Endorsement of the estimation of production quantities of sponge iron and steel billets of Maa Mahamaya Industries Ltd, R.G. Peta in the years 2006-07, 2007-08 and 2008-09 from the charge mix used Maa Mahamaya Industries Ltd Dr. V Panduranga SMS                           1.20  1 Week  07.07.2016 CP067 Completed
66 Proof checking of design and drawing for 2 nos of S&T Cabin building for M/S NTPC at Kaniha RITES Ltd Dr. S R Dash SIF                           0.72  2 week  17.06.2016 CP066 Completed
65 Proof checking of design and drawing of substructure for major bridges no 115 and 131 Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash SIF                           1.15  1 month  21.06.2016 CP065 Completed
64 Technical and function test of Gagan enabled GPS PDAs Conservator for Forest, GIS, Aranya Bhawan Dr. P R Sahu SES                           1.95  1.5 month  10.05.2015 CP064 Completed
63 Video analysis algorithms to detect unusual behaviour in crowd and traffic outdu Media Tech Pvt. Ltd. Dr. Debi Prosad Dogra SES                           6.52  3 months  15.06.2016 CP063 On-going
62 Design and developing a portable wireless noise level and vibration monitors Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan SES                           1.04  3 months  15.05.2016 CP062 On-going
61 Design and developing a portable wireless air quality monitor Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan SES                           2.44  3 month  15.05.2016 CP061 On-going
60 Testing of Panels for energy absoption test ILFS SIF Dr. Dinakar Pasla SIF                           2.86  1 month  23.05.2016 CP060 Completed
59 Inspection of quality control laboratory  Maa Mahamaya Industries Ltd Dr. V Panduranga SMS                           1.19  1 week  06.05.2016 CP059 Completed
58 Implementation of water quality monitoring and management system  Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan SES                           1.49  2 months  15.04.2016 CP058 Completed
57 Testing of light weight aggregates (LWAs) in various concrete grades and the physical and chemical testing of the aggregates and also the structural load behaviour of the LWA concretes Jindal Steel and Power Limited Dr. Dinakar Pasla SIF                           5.64  3 months  12.05.2016 CP057 On-going
56 Proof Checkin of Design and Drawing of Substructure of Railway Bridge of RVNL Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash SIF                           0.86  1  week  08.04.2016 CP056 Completed
55 Vetting of structure and superstructure of sports climbing facility at Kalinga Stadium confirming to IFSC standard Outdoor School Dr. Sumanta Halder SIF                           4.09  3 months  10.03.2016 CP055 Completed
54 Stability study of the ash filled area Vedanta Limited Dr. B hanumatha Rao SIF                           3.14  1 year    CP054 Completed
53 C/C++ implementation with adequate GUI for sparsity based abnormal event detection Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES                           7.00  6 months  10.02.2016 CP053 On-going
52 C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet process Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES                           8.00  6 months  10.02.2016 CP052 On-going
51 Design and Drawing for Katekela Lagoon-2 ash pond  Vedanta Limited Dr. B hanumatha Rao SIF                           8.19 1 Year   CP051 Completed
50 Strenghthening and Widening/ Reconstruction of Dumka Masalia-Nala upto West Bengal Border Road lane with paved shoulder under EPC Mode (55 km) Barbrik_RCPL(JV) Dr. P P Dey SIF                           2.36  1year    CP050 On-going
49 Design of experimental road using fly ash Sesa Sterlite Limited Dr. B hanumatha Rao SIF                           3.08  2 months    CP049 Completed
48 Technical Evaluation of cement concrete roads in Odisha Planning & Coordination Dept., Govt. of Odisha Dr. U C sahoo SIF                         28.16  8 months  30.10.2015 CP048 On-going
47 Technical Scrutiny of irrigation road proposal under IRC & IS Water Reseources Dept., Govt. of Odisha Dr. U C sahoo SIF                           4.26  3 month  13.11.2015 CP047 Completed
46 Vetting of schematic drawing along with transmission loss calculation for 6.6KV/ 415V OHDC line Megha Engineering & SIF Ltd. Dr. S B Karanki SES                           0.33  2 weeks  30.09.2015 CP046 Completed
45 Modelling of the Cathode assembly in Aluminium reduction cell Tata International Ltd Dr. Randhir Singh SMMME                           0.74  3 month  16.09.2015 CP045 Completed
44 Preparation of DPR for the proposed National Institute for New Energy & Innovation at Bhubaneswar Ministry of New Renewable Energy, Govt. of India Dr. N C Sahoo SES                           5.00   14.10.2015 CP044 On-going
43 Improvement and upgradation of two lane with paved shoulder configurationof Koderma-Domchanch-Khorimahua-Jamua Road (SH-13) under EPC mode in Jharkhand NIT Durgapur Dr. P P Dey SIF                           2.00  2 year  27.07.2015 CP043 On-going
42 Conducting Mix Design for M50 for NBCC Bhubaneswar NBCC Ltd Dr. Dinakar Pasla SIF                           1.33  3 month  11.07.2015 CP042 Completed
41 Geotechnical investigations on soil/rock samples NBCC Ltd Dr. B hanumatha Rao SIF                           1.20  1 week  24.06.2015 CP041 Completed
40 Process optimization studies on leaching of high ash coal to produce low ash coal Tata Steel Ltd Prof. N P H Padmanabhan SMMME                           6.75  7 month  15.05.2015 CP040 Completed
39 Survey on process study of CPC and EPC of Amritesh Industries Pvt. Ltd, Angul Amritesh Industries Pvt. Ltd. Dr. Akhilesh Barve SMS                           0.40  1 Week  24.06.2015 CP039 Completed
38 Testing of Ballast from Baghua Querry Maa Chandi Stone Crushing Dr. S R Dash SIF                           0.17  1 week  05.06.2015 CP038 Completed
37 Surge analysis for 1000mm Dia water rising main at Jajpur IDCO Dr. Arindam Sarkar SIF                           1.90  1 month  27.05.2015 CP037 Completed
36 Proof checking of srtructural design nad drawing Hindustan steel works construction Ltd. Dr. S R Dash SIF                           0.43  2 weeks  12.05.2015 CP036 Completed
35 Survey of capacity assessment of Amritesh Industries Pvt. Ltd. Amritesh Industries Pvt. Ltd. Dr. V Panduranga SMS                           0.27  1 week  06.05.2015 CP035 Completed
34 Design and analysis for making rural road about 1 km by using JK Paper Mills fly ash JK Papers Mills Limited Dr. B Hanumatha Rao SIF                           2.85  1.5 month  20.04.2015 CP034 Completed
33 Assessment of structural safety of construction of balance six floor of the IDCOL corporate office building, BBSR IDCO Dr. Sumanta Halder SIF                         12.64  3 month  09.04.2015 CP033 Completed
32 Testing of materials and conducting design mix M-25,M-30 & M-40 in connection with construction of commercial cum residential complex  National Building construction corporation Ltd. Dr. P Bhunia SIF                           4.38   09.04.2015 CP032 Completed
31 Report on Dolomite and its usage in sponge Iron production Ganesh Sponge (P) Ltd. Dr. Soobhankar Pati SMMME                           0.30  1 day  17.03.2015 CP031 Completed
30 Opinion regarding the dri reduction furnace at JSPL plant Angul Kazstroy Services SIF Pvt. Ltd Dr. Dinakar Pasla SIF                           2.81  3 month  18.03.2015 CP030 Completed
29 Assessing the soil for earth work construction IVRCL Limited Dr. B hanumatha Rao SIF                           0.53  1 Week  12.03.2015 CP029 Completed
28 Testing of AAC Blocks Overtop marketing (P) Ltd. Dr. Dinakar Pasla SIF                           3.07  2 month  12.03.2015 CP028 Completed
27 Testing of AAC Blocks Fast Build Blocks Pvt. Ltd Dr. Dinakar Pasla SIF                           0.77  2 month  13.03.2015 CP027 Completed
26 Vetting/checking of the project report prepared by CEMCPL for Ordnance Factory, Ambajhari, Nagpur Centre for Envotech and Management Consultancy (P) Ltd Dr. R R Dash SIF                           1.40  1 month  30.01.2015 CP026 Completed
25 Robotic application in boiler NDT assessment OMS Power Training and research Institute Dr. V Pandu Ranga SMS                           3.29  2 months  07.01.2015 CP025 Completed
24 Testing of Fibre shorcrete panels for energy absorption test Leighton India Contractors (P) Ltd Dr. Dinakar Pasla SIF                           4.68  3 months  04.12.2014 CP024 Completed
23 Design and stability analysis of an embankment for new BG rail line from Haridaspur to Paradeep in the Khurda district Odisha Tracks & Tower Infratech (P) Ltd  Dr. Hanumatha Rao SIF                           3.65  1 month  02.12.2014 CP023 Completed
22 Testing of Fibre shorcrete panels for energy absorption test Leighton India Contractors (P) Ltd Dr. Dinakar Pasla SIF                           5.26  3 months  06.11.2014 CP022 Completed
21 Issue of Check Proof Certificate and Procedure for the rectification of FOB along with necessary drawing regarding McML-ECI(JV) Dr. S R Dash SIF                           1.26  2 Weeks  16.09.2014 CP021 Completed
20 Assessment of High Compressibility of cut spoil Tracks & Tower Infratech (P) Ltd  Dr. B hanumatha Rao SIF                           1.26  1 month  16.09.2014 CP020 Completed
19 Widening & Strengthening of Bhawanipatna-Gunupur-Kasipur Road (SH-44) to 2 Lane without paved shoulder from Km 0/000 to 13/000 & Km 42/940 to Km 48/840 on EPC mode in the district of Kalahandi Office of the Executive Engineer Koraput (R&B) Division Dr. B hanumatha Rao SIF                           0.50  1 month  12.09.2014 CP019 Completed
18 Vetting of structural Design and Drawing for the Construction of L.I.G and L.M.I.G housing Complex along with Commercial Complex at Kalinga Nagar Zone- K4 BDA Dr. S R Dash SIF  -   -    CP018 Cancelled
17 Impact Assessment study of city bus services operational under JnNURM Housing and Urban Development Department, Govt of Odisha Dr. Debasis Basu SIF                           6.98  4 month  13.08.2014 CP017 Completed
16 Proof Checking of POT cum PTFE Bearing Bhubaneswar Expressways Pvt. Ltd Dr. Dinakar Pasla SIF                           1.01  1 month  30.07.2014 CP016 Completed
15 Co-operation and expert advice for improvement of short and extended range (monthly scale) prediction of rainfall in the tropics RIMES Prof. U C Mohanty SEOCS                         10.00  1 Year  18.06.2014 CP015 Completed
14 Design and testing aerated autoclaved fly concrete blocks (AAC) Fast Build Blocks Pvt. Ltd Dr. Dinakar Pasla SIF                           1.18  1 month  10.05.2014 CP014 Completed
13 Consultancy for investigation in ARC, Charbatia Airports Authority of India, Biju Pattanaik Airport Dr. Dinakar Pasla SIF                         13.49  3 month  16.05.2013 CP013 Completed
12 Proof checking of design and drawing of three no. box bridges under Railway loading in connection with construction of railway siding to serve Koderma Thermal Power Plant (2x500MW) of DVC RITES Ltd Dr S C Dutta SIF                           3.79 3 month 14.11.2012 CP012 Completed
11 Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and odisha NRRDA Dr U C Sahoo SIF                         42.72   30.08.2012 CP011 On-going
10 Design of weighbridge & moveable floor crane DS Systems Dr. S N Panigrahi SMS                           1.16  10 months  14.06.2012 CP010 Completed
9 Design of two number of 220KV transmission line tower foundations between Kantapalli to Hindalco in the mahanadi river Hindalco
Industries Ltd.
Dr. Arindam Sarkar SIF                           7.18  8 months  11.04.2012 CP009 Completed
8 House hold energy consumption survey-2012 WMG Dr. S R Samantaray SES                           1.20  1 Year  24.03.2012 CP008 Completed
7 Proof Checking of design of pile foundations for location no. 16A and 24 of 220 KV transmission line tower from Bidanasi ( Cuttack) near the bank of Kathajodi to Nuapada (Cuttack) in the spill zone Orissa Power
Transmission
Corporation Limited
Dr. Sumanta Halder SIF                           2.27  1 month  19.10.2011 CP007 Completed
6 Vetting of structural analysis of design and drawing for the new residential complex at HAL Koraput HAL Prof. S C Dutta  SIF                            5.00  1 month  18.10.2011 CP006 Completed
5 Proof Checking of design of river bed pile foundation for location no. 10,12 & 15 of 220KV transmission line from Bidanasi to Cuttack grid substation Orissa Power
Transmission
Corporation Limited
Dr. Sumanta Halder SIF                           3.31  1 month  31.05.2011 CP005 Completed
4 Preparation of special Foundation for 220KV Tower for Two locations(158-c & 159)  Hindalco
Industries Ltd.
Dr. Arindam Sarkar SIF                           4.84  1 month  06.05.2011 CP004 Completed
3 Proof Checking od 3 Nos panel cabin building and 1 no. gate lodge/IBS Building for M/s. Nalco Angul RITES Ltd Dr. Dinakar Pasla SIF                           0.60  3 months  11.10.2010 CP003 Completed
2 Remedial Measures for Horizontal and vertical
Cracks Developed in the walls, floors, roof etc of ESI Hospital, Jaykaypur
ESI Corporation Dr. Dinakar Pasla SIF                           3.95  3 months  06.09.2010 CP002 Completed
1 Vetting of the design of lighting masts and their foundations in connections with commissioning of lighting systems of wankahade stadium Bajaj Electricals Ltd. Prof. S.C. Dutta SIF                           1.10  1 month  17.09.2009 CP001 Completed