275

Mix designs for M30 grade of concrete using PPC, PSC and SRPC at Chandipur

M/s CMRGS INFRASTRUCTURE PROJECTS LTD.

Dr. Dinakar Pasla

SIF

1.53

Two Months

6/3/2021

8/2/2021

CP275

On-going

274

Proof checking of the design of Railway Foot Over Bridge (Steel Structure) at AMB station yard

M/s RAIL VIKAS NIGAM LIMITED

Dr. Dinakar Pasla

SIF

1.18

Two months

25.05.2021

24.07.2021

CP274

On-going

273

Development of Concrete Mix Designs for IIM Sambalpur

M/s DEE VEE PROJECTS LIMITED

Dr. Dinakar Pasla

SIF

3.68

Four Months

01.06.2021

30.09.2021

CP273

On-going

272

Vetting of new South-west red mud pond and PWL (Process Water Lake) designs

M/S VEDANTA LIMITED ALUMINIUM & POWER

Dr. B Hanumantha Rao

SIF

27.86

SIx Months

27.05.2021

26.11.2021

CP272

On-going

271

Mix design for Construction of Substructure and Superstructure at Chandipur

M/s LIRA CONSTRUCTIONS PRIVATE LIMITED

Dr. Dinakar Pasla

SIF

1.18

Two Months

03.05.2021

02.07.2021

CP271

On-going

270

Proof checking of foot over bridge and overhead piping crossing railway track for Tata Steel

M/s Tata Steel Limited

Dr. Dinakar Pasla

SIF

8.56

SIx Months

20.05.2021

19.11.2021

CP270

On-going

269

Testing of TMT Rebar

M/s Rungta Mines Limited C/o R&D & Q.P (R&B), Govt. of Odisha

Dr. Soobhankar Pati

SMMME

4.78

15 days

30.03.2021

14.04.2021

CP269

On-going

268

Soil core lab testing

M/s Ramky Enviro Engineers Limited

Dr. B Hanumantha Rao

SIF

1.41

One Month

05.03.2021

04.04.2021

CP268

On-going

267

Environmental Audit of CHWTSDF

M/s Ramky Enviro Engineers Limited

Dr. B Hanumantha Rao

SIF

5.06

Three Months

05.03.2021

04.06.2021

CP267

On-going

266

Development of Hydrophobic Concrete for Seabird Project

M/s Master Builders Solutions India Private Limited

Dr. Dinakar Pasla

SIF

5.37

Four Months

30.03.2021

29.07.2021

CP266

On-going

265

Vetting of GTI rock fall protection netting specifications "D-WR"

GABION TECHNOLOGIES INDIA PRIVATE LIMITED

Dr. B Hanumantha Rao

SIF

1.3

49 days

08.03.2021

25.04.2021

CP265

On-going

264

Measurement of factor of safety for tailings dams of RMP & ash pond at Vedanta Limited

VEDANTA LIMITED ALUMINIUM & POWER

Dr. B Hanumantha Rao

SIF

6.14

39 days

17.03.2021

24.04.2021

CP264

On-going

263

Vetting of box culvert design of Jeypore airport under RCS-UDAN (Long Term)

DIRECTORATE OF AVIATION BHUBANESWAR C/o M/s Nirman Soudha

Dr. Goutam Mondal

SIF

2.21

Three Months

26.03.2021

25.06.2021

CP263

On-going

262

Proof checking of the structural design & drawing of PEB Hangar at Biju Patnaik international Airport, Bhubaneswar

M/s Yazdani International Pvt.Ltd/ C/o Capt Zaheed Parvez

Dr. Goutam Mondal

SIF

5.61

Three Months

30.03.2021

29.06.2021

CP262

On-going

261

Structural Scrutiny of Railway Buildings

M/s PIR Projects and Consultancy Private Limited

Dr. Goutam Mondal

SIF

1.48

Two Months

17.03.2021

16.05.2021

CP261

Completed

260

Consultancy for corrective action for cracks developed during launching of pre-cast rcc box segment (span 2 x 6.0 x 6.0 m)

M/s RITES Limited

Dr. S R Dash

SIF

1.99

21 days

26.03.2021

15.04.2021

CP260

Completed

259

Environmental Audit of secured landfill in smelter plant NALCO at Angul

NALCO

Dr. R R Dash

SIF

3.45

Two Months

20.03.2021

19.05.2021

CP259

On-going

258

Dike & Stability study of red mud storage pond-A

M/S. UTKAL ALUMINA INTERNATIONAL LTD

Dr. B Hanumantha Rao

SIF

9.56

One Month

26.02.201

25.03.2021

CP258

On-going

257

Design of CGBM using Provence 907, a ready mix grout

M/s Avijeet Agencies Pvt.Ltd

Dr. U C Sahoo

SIF

2.36

Three Months

16.03.2021

15.06.2021

CP257

On-going

256

Vetting of soil investigation report for the work: Soil Investigation For Provision of Deficient Integrated Security Watch Towers Under GE (P) Ezhimala at INA Ezhimala.

M/s IDAX Consultanting and Research Pvt. Ltd

Dr. Sumanta Haldar, Associate Propessor

SIF

0.59

15 Days

3/5/2021

3/20/2021

CP256

Completed

255

Rehabilitation and Up-gradation of Road from Km 0.000 to Km 16.290 (Lenggth- 16.290 km) of Manu-Lalcherra section of NH 44A to two lane with Paved shoulder in the state of Triupra on EPC basis (pkg-1)- safety consultant service reg.

M/s SSK Infrastructures

Dr Partha Pratim Dey

SIF

2.66

Eighteen Months

3/9/2021

9/8/2022

CP255

On-going

254

Proof check of Major Bridge No. 8b of PEQCTPL siding at Paradeep

M/s Indian Port Rail & Ropeway Corporation Ltd. (IPRCL) Bhubaneswar

Dr Devesh Punera

SIF

2.43

One Month

2/23/2021

3/22/2021

CP254

Completed

253

Carrying out Mix-designs of concrete for the Widening & Strengthening of Sankara Bypass Road

M/s Altima Infrastructure Private Limited, C/O NBCC (India) Limited

Dr. Dinakar Pasla

SIF

1.84

Two Months

2/10/2021

4/9/2021

CP253

On-going

252

Proof check and scrutiny of designs and drawings of substructure for 3 nos of major bridges in connection with NTPC-LARA project

M/s RITES Limited

Dr. Suresh R Dash

SIF

11.34

Two Months

2/5/2021

4/4/2021

CP252

On-going

251

Carrying out vetting of projects developed by Utkal Developers Bhubaneswar for Patrapada

M/s Utkal Builders

Dr. Dinakar Pasla

SIF

2.78

Four Months

11/19/2020

3/18/2021

CP251

On-going

250

Testing of spray concrete panels with PP fibers

M/s Master Builders Solutions India Private Limited, C/0 M/s BASF India Ltd

Dr. Dinakar Pasla

SIF

3.59

Three Months

1/8/2021

4/7/2021

CP250

On-going

249

Stability test of ash dikes

M/s Jindal India Thermal Power Limited

Dr. B Hanumantha Rao

SIF

6.49

One Month

1/14/2021

2/13/2021

CP249

On-going

248

Proof checking of design and drawing of six Nos of minor bridges (Non-RDSO standard RCC Box) at Brajrajnagar, Jharsuguda

M/s RITES Limited

Dr. Suresh R Dash

SIF

7.18

Two Months

1/25/2021

3/24/2021

CP248

Completed

247

Surface Run-Off Management studies at Daitari Iron Ore Mine, South Kaliapani Chromite Mine and Sukrangi Chromite Mines, M/s OMC Ltd

The Odisha Mining Corporation Ltd

Prof. R K Panda

SIF

25.08

One Year

1/29/2021

1/28/2022

CP247

On-going

246

Suggesting measures for road failure at a hill section of NH-57

M/s SCIW-YFC Joint Venture

Dr. Umesh Chandra Sahoo

SIF

3.54

Two Months

1/30/2021

3/30/2021

CP246

Completed

245

Vetting of design note on slope stability

M/s Sai Gr Impex Pvt.Ltd

Dr. B Hanumantha Rao

SIF

1.01

One Month

12/17/2020

1/16/2021

CP245

On-going

244

Vetting of Design of Wastewater Treatment plant equipment units for STPs, ETPs, and SRTs

M/s SJ Environmental Solutions

Dr. Rajesh roshan Dash

SIF

1.24

One Month

1/18/2021

2/17/2021

CP244

Completed

243

Proof checking of Design and drawing of substructure for bridge in connection with Angul-Sukinda new BG Rail link Project

M/s Rail Vikas Nigam Limited

Dr. Suresh R Dash

SIF

9.88

Two Months

1/5/2021

04.03.2021

CP243

On-going

242

Regional and Sub-regional Analyses of Macroeconomic Policy Strategies for Growth and Equality in Southern Africa

United Nations University World Institute for Development Economics Research

Dr. Dukhabandu Sahoo

SHSSM

7.29

230 Days

4/15/2020

31.12.2020

CP242

Completed

241

Impact Assessment of WHO's framework convention on Tobacco control (FCTC) in India-A call to action report 2021

M/s AF Development Care (AFDC)

Dr. Dukhabandu Sahoo

SHSSM

12.64

4 Months

1/12/2021

11.05.2021

CP241

On-going

240

Design and formulation of coating using molecular modelling and simulation

M/s Tata Steel Ltd

Prof. S K Nayak

SBS

26.9

1 Year

1/8/2021

07.01.2022

CP240

On-going

239

Development of static model for Tata steel BOF

Tata Steel Ltd

Prof. Brahma Deo

SMMME

31.86

1 Year

18.12.2020

 

CP239

On-going

238

Product development and technical support for cold mix Asphalt Application in Eastern India

Bitchem Asphalt Technologies Ltd

Dr. U C sahoo

SIF

35.4

3 years

24.12.2020

 

CP238

On-going

237

Assessment study for issue of “no increase in pollution load” certificate to Paradip Refinery cum Petrochemical complex for processing crude oil above name plate capacity of 15 MMTPA = 10% max

Indian Oil Corporation Ltd

Dr. Rama Krushna Sabat

SMMME

4.22

3 months

20.11.2020

 

CP237

On-going

236

Vetting of traffic density study traffic density study for environmental clearance for TATA-Bhusan township at Angul

Centre for Envotech and management

Dr. R R Dash

SIF

1.77

3 months

19.11.2020

18.02.2021

CP236

Completed

235

Design and drawing of building of SSRM and HRO, RMS 'N' Division, Cuttack, Odisha

Postal Civil Division

Dr. Sumanta Halder

SIF

5

1 month

30.09.2020

30.10.2020

CP235

Completed

234

Carrying out vetting of projects developed by Utkal developers Bhubaneswar

Utkal Builders Pvt. Ltd

Dr. Dinakar Pasla

SIF

2.78

4 months

06.10.2020

 

CP234

On-going

233

Vetting of Traffic Density Study for Environmental Clearance for Housing project at Pahala, Bhubaneswar

Centre for Envotech and management

Dr. P P Dey

SIF

0.83

3 months

13.10.2020

 

CP233

Completed

232

Study the cause of defect on the wing walls of Br. 5 over Angul-Balaram Section of MCRL corridor and suggestion on remedial measures for the structure

IRCON International Ltd

Dr. S R Dash

SIF

4.13

3 months

29.09.2020

 

CP232

On-going

231

Evaluation of PPC, PSC and Composite cements of Dalmia Cements

Dalmia Cements Bharat

Dr. Dinakar Pasla

SIF

2.1

6 months

10.08.2020

 

CP231

On-going

230

Carrying out the third party quality assurance consultancy (TPQAC) for the construction and development of Kendriya Vidyalaya Schoolat Jagatsinghpur, Odisha

National Projects Construction Cooperation Ltd

Dr. Dinakar Pasla

SIF

7.57

18 months

16.09.2020

 

CP230

On-going

229

Proof checking of design and drawing of substructure and foundation of 5 major bridge at Brajrajnagar, Jharsuguda

RITES Ltd

Dr. S R Dash

SIF

21.54

1 year

07.09.2020

 

CP229

On-going

228

Residual Stress Measurement on Rotor Surface at various Locations (Base Metal & Weld) & Modelling of Rotor Weldment-For AUSC Projects

Bharat Heavy Electricals Limited

Dr. M M Mahapatra

SMS

9.2

3 months

24.08.2020

 

CP228

Completed

227

Testing of TMT Bars as per IS:1786:2008

Office of Chief Engineer, Research Development & quality Promotion, Odisha

Dr. Soobhankar Pati

SMMME

1.78

2 Weeks

11.08.2020

 

CP227

Completed

226

Carrying out concrete mix designs for new greenfield airport at Hirasaar, Rajkot (Gujarat)

Dillip Buildcon Ltd

Dr. Dinakar Pasla

SIF

12.04

6 months

12.08.2020

 

CP226

On-going

225

Proof check and scrutiny of design and drawings of bridge substructure and foundation (Br.3 and Br.79) in connection with NTPC-LARA project

RITES Ltd

Dr. S R Dash

SIF

6.93

4 months

05.08.2020

 

CP225

Completed

224

Carrying out concrete mix design for AIIMS Bhubaneswar second phase of construction

CPWD

Dr. Dinakar Pasla

SIF

1

2 months

28.07.2020

 

CP224

Completed

223

Proof checking of design and drawing of substructure for Bridge No. 180(ROB)

Rail Vikas Nigam Limited

Dr. S R Dash

SIF

2.14

1 month

24.07.2020

 

CP223

Completed

222

Proof checking of detailed design and drawing for construction of New Greenfield Airport at Rajkot, Gujarat

Dillip Buildcon Ltd

Dr. Anush K C

SIF

23.6

1 year

18.07.2020

 

CP222

On-going

221

Preparation of catchment area treatment plan for the Dubuna Sakradihi iron and manganese ore mines of OMC Ltd.

OMC

Prof. R K Panda

SIF

22.13

3 months

02.07.2020

 

CP221

On-going

220

Anomaly Detection in Videos

KIST

Dr. D P Dogra

SES

23.79

1 year

26.06.2020

24.02.2021

CP220

Completed

219

Soil core lab testing

Ramky

Dr. B hanumatha Rao

SIF

2.87

1 month

23.06.2020

 

CP219

On-going

218

Mathematical modelling for parameter estimation and vibration analysis

ITR, DRDO

Dr. S R Kannan

SMS

8.3

6 months

16.06.2020

 

CP218

Completed

217

ov

PIR Projects and Consultancy Private Limited

Dr. Goutam Mondal

SIF

3.54

2 months

24.06.2020

 

CP217

On-going

216

Design and development of gaseous Oxygen heat exchanger for semi-cryogenic stage

Liquid Propulsion Systems Centre

Dr. Prasenjit Rath

SMS

5

11 months

03.05.2020

 

CP216

On-going

215

Structural vetting of residential towers as per the BDA, Odisha

Mani Tirumala

Dr. Devesh Punera

SIF

5

1 month

05.06.2020

 

CP215

Completed

214

Technological interventions to reduce humananimal conflict

State wildlife

Prof. N C Sahoo
Dr. S N Panigrahi
Dr. Vijaykrishna kari
Dr. Mithipati sivabhaskar

IIT

50

1 year

03.06.2020

 

CP214

On-going

213

Proof checking of the design and drawing of ROBs for KMC-RKD

RKD Construction (P) Ltd.

Dr. S R Dash

SIF

10.84

2 months

19.05.2020

 

CP213

On-going

212

Proof checking of design and drawing of one of the revised substructure (Pier-P1) of Br. 172 in connection with Angul-Sukinda New B.G Rail link Project

Rail Vikas Nigam Limited

Dr. S R Dash

SIF

1.53

3 weeks

18.05.2020

 

CP212

On-going

211

Vetting of 3.0m height retaining wall sheet at VSS airport, Jharsuguda

Airport Authority of India
PR Construction

Dr. Dinakar Pasla

SIF

1

3 months

15.05.2020

 

CP211

Completed

210

Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and Odisha

NRRDA

Dr. U C Sahoo

SIF

57.49

 

 

 

CP210

On-going

209

Testing of samples for integrated Infrastructure Complex at Dhamnagar, Bhadrak

Bridge and Roof Co, (India) Ltd.

Dr. Dinakar Pasla

SIF

1.04

2 months

12.03.2020

 

CP209

Completed

208

Vetting of construction of civil works for installation of ILS at VSS airport Jharsuguda

Airport Authority of India
PR Construction

Dr. Dinakar Pasla

SIF

1

3 months

02.01.2020

 

CP208

Completed

207

Proof checking of design and drawing of road under bridge (RUB) at MCL, Talcher (span 2x6.0x6.0m RCC PRECAST SEGMENTAL BOX)

RITES Ltd

Dr. S R Dash

SIF

2.02

1 month

21.03.2020

 

CP207

Completed

206

Vetting of new South-west red mud pond and PWL (process Water Lake) designs

Vedanta Ltd

Dr. B hanumatha Rao

SIF

27.86

6 months

25.02.2020

 

CP206

Cancelled

205

Study of ground water table and surface water discharge at Tata Steel Kalinganagar

Tata Steel Ltd

Dr. Arindam Sarkar

SIF

14.75

3 months

05.02.2020

 

CP205

Completed

204

Proof check and scrutiny of design and drawings of 1 major bridge substructure and foundation in connection to NTPC-LARA project

RITES Ltd

Dr. S R Dash

SIF

5.75

6 weeks

27.01.2020

 

CP204

Completed

203

“Design of Cell filled concrete pavements for rural roads carrying heavy traffic

M/s Kohinoor Plastech, Kolkata

Dr. Anush K C

SIF

3.98

4 months

08.01.2020

 

CP203

On-going

202

Checking of the stability of foundation and superstructure of pipe conveyor for MCL

M/s L&T Ltd.

Dr. Sumanta Halder

SIF

3.98

2 months

04.01.2020

 

CP202

Completed

201

Site study at Barang for Construction of Cancer Hospital

Alamelu Charitable Foundation (Tata Trusts)

Dr. Dinakar Pasla

SIF

1.48

1 months

03.01.2020

 

CP201

Completed

200

Mix Design for NTPC-BHEL Project at BARH

RDC Concrete India Ltd

Dr. Dinakar Pasla

SIF

1.53

3 months

08.01.2020

 

CP200

Completed

199

Vetting of Traffic Density Study for Environmental Clearance for Multiplex Building at Bhubaneswar

M/s CEMC Pvt. Ltd

Dr. R R Dash

SIF

0.89

15 days

30.12.2019

 

CP199

Completed

198

Verification of Hydraulic & structural design and drawings of RWSS Mega Water Project of Puri District

M/s Voltas Limited

Dr. Puspendu Bhunia

SIF

29.5

6 months

27.12.2019

 

CP198

On-going

197

Technical support for rehabilitation of defunct NH-5, Balugaon from 0/0 km to 8/0 km

Chief Engineer (DPI & Roads) Odisha, Govt. of Odisha

Dr. U C Sahoo

SIF

3.98

3 months

06.12.2019

 

CP197

Completed

196

Structural vetting of bridges and retaining walls of 2x25MW Maithan Right Bank Thermal Power Project for M/s L&T Ltd

L&T Ltd

Dr. S R Dash

SIF

29.5

3 months

04.12.2019

 

CP196

Completed

195

Design verification of Boudh WSP

Larsen & Toubro (L&T) Construction

Dr. Dinakar Pasla

SIF

5.9

4 months

03.12.2019

 

CP195

Completed

194

Stability analysis and method of improving the bearing capacity from KM 56.00 to KM 57.10 - Package 2A (Construction of road bed, station buildings, passenger amenities, minor bridges, general electrical works in connection with new BG rail line from Kendrapara (Incl) KM 42.040 to Dumuku Km 57.000 on Khurdha road division of East Coast Railway in the State of Odisha, India

Rail Vikas Nigam Limited

Dr. B hanumatha Rao

SIF

4.06

2 month

01.12.2019

 

CP194

Completed

193

Technical Scrutiny of structural drawing and design calculations of 3x300 MSV and 1x600 MSV tank

Creative Studio

Dr. Devesh Punera

SIF

1.77

1 month

18.11.2019

 

CP193

Completed

192

Verification of basic and detailed engineering design of RWSS mega water project of Rairakhol

Voltas Limited

Dr. Arindam Sarkar

SIF

29.5

6 months

19.11.2019

 

CP192

Completed

191

Stability study in tailings dams and scrutiny of dry stacking procedure of red mud

Vedanta Limited

Dr. B Hanumatha Rao

SIF

16.92

6 months

24.10.2019

 

CP191

Completed

190

Mix Design for married Accommodation at Chandipur

Military Engineer Services through M/s Komal Buildcon Pvt. Ltd, Jaipur, Rajasthan

Dr. Dinakar Pasla

SIF

1.15

2 months

01.11.2019

 

CP190

Completed

189

Testing of Bituminous core samples of Paga-Gopinathpur-Kuanpal Road

Executive Engineer, QC(R&B) Div. Govt. of Odisha

Dr. U C Sahoo

SIF

1.19

15 days

30.10.2019

 

CP189

Completed

188

Structural vetting of 17 bridges for M/s Adani Infra (India) Ltd. At Hansdiha Godda Section under Eastern Railway

PIR Projects and Consultancy Private Limited

Dr. Goutam Mondal

SIF

23.6

6 months

01.10.2019

 

CP188

Completed

187

Proof checking of design/drawings of bearings with reference to the grade separator structure at Khandagiri Chowk (Km. 412) on NH-5 (New NH-16), Bhubaneswar

RKD Construction Pvt. Ltd

Dr. S R Dash

SIF

3.54

3 months

26.09.2019

 

CP187

Completed

186

Coriolis flowmeter study

Honeywell Technology Solutions Lab Pvt. Ltd

Dr. Venugopal Arumuru

SMS

13

1 Year

18.09.2019

 

CP186

Completed

185

Design and development of Flow measurement Solution

Honeywell Technology Solutions Lab Pvt. Ltd

Dr. Venugopal Arumuru

SMS

21.5

1 Year

18.09.2019

 

CP185

Completed

184

Checking Structural strength of pier of east coast railway constructed over luna river

Rail Vikas Nigam

Dr. Dinakar Pasla

SIF

1.06

1 month

20.09.2019

 

CP184

Completed

183

Design of M25 Grade RCC for Structural Elements

M/s Airports Authority of India, Jharsuguda

Dr. Dinakar Pasla

SIF

1.01

2 months

31.08.2019

 

CP183

Completed

182

2nd phase monitoring settlements and effectiveness of the PVD-Package 2B - Construction of road bed, station buildings, passenger amenities, minor bridges, general electrical works in connection with new BG rail line from Dumuku KM 57.000 to Nuagaon KM 68.300 on Khurdha roda division of East Coast Railway in the state of Odisha, India

M/s RVNL, Bhubaneswar

Dr. B hanumatha Rao

SIF

2

15 days

31.08.2019

 

CP182

Completed

181

Product quality improvement program at Deem Roll Tech. Ltd

M/s Deem Roll Tech. Ltd., Ahmedabad

Dr. P P Dey

SMMME

0.61

2 months

08.08.2019

 

CP181

Completed

180

Re-identification guided video synopsis

Korea Institute of Science and Technology (KIST)

Dr. Debi Prosad Dogra

SES

18.34

9 months

09.08.2019

 

CP180

Completed

179

Request to assess the structural integrity of sports climbing wall

Dept. of Sports & Youth Services

Dr. Dinakar Pasla

SIF

5.61

3 months

09.08.2019

 

CP179

Completed

178

Testing suitability of dredged sand for use in Road embankment & subgrade

Executive Engineer, R&D Division, Bhadrak

Dr. U C sahoo

SIF

2.39

2 months

17.07.2019

 

CP178

Completed

177

Structural vetting of proposed bridge for Private Railway siding near Barbil Station of Chakradharpur division in South Eastern Railway to serve M/s Rungta Mines Ltd

M/s PIR Projects and Consultancy Private Limited

Dr. Goutam Mondal

SIF

2.95

6 months

14.06.2019

 

CP177

Completed

176

Core sample analysis of composite clay lining of secured engineering landfill for disposal of hazardous waste

M/s RAMKY Enviro Engineers Ltd

Dr. B hanumatha Rao

SIF

1.26

15 days

21.05.2019

 

CP176

Completed

175

Engineering operation philosophy for long term mud management

Utkal Alumina International Limited

Dr. B hanumatha Rao

SIF

21.48

9 months

16.04.2019

 

CP175

Completed

174

Checking of bearing capacity of pile for LPG bottling plant IOCL

M/s Kosan SFPL projects (P) Ltd.

Dr. Dinakar Pasla

SIF

1.5

1 month

20.05.2019

 

CP174

Completed

173

Structural vetting of proposed bridge for Private Railway Siding at Mahalimarup Station to serve M/s Shree Cement Ltd, and at Lathikata of Chakradharpur division in South Eastern Railway to serve M/s Orissa Industries Ltd

M/s Picasona Rail Engineers & Project Private Limited

Dr. Goutam Mondal

SIF

5.16

2 months

10.05.2019

 

CP173

Completed

172

Technical scrutiny of Drawing and Design of Thrust Bed for Box Pushing Section Below Railway Track

M/s Tata Steel Limited

Dr. Devesh Punera

SIF

2.21

1 month

29.04.2019

 

CP172

Completed

171

Vetting of structure design/drawing for the project of KV for 6 locations at Jharkhand & Odisha State

M/s CP & DS Associates, Ghaziabad

Dr. Sumanta Halder

SIF

5.07

10 months

11.03.2019

 

CP171

Completed

170

Residual stress measurement by Deep-hole drilling technique

NMRL, DRDO

Dr. M M Mahapatra

SMS

39.8

1 year

20.03.2019

3/31/2021

CP170

On-going

169

Development of FEM model for Design Improvement of multi layered Baffle

NPOL, DRDO

Dr. S N Panigrahi

SMS

18.75

1 year

12.03.2019

 

CP169

Completed

168

Testing of ferroalloy slag granules

M/s Nava Bharat Ventures Limited

Dr. B hanumatha Rao

SIF

1.27

20 days

22.03.2019

 

CP168

Completed

167

Mix design for M30 and M35 grade of Concretes

M/s Ultratech Cement Ltd

Dr. Dinakar Pasla

SIF

1.03

45 days

19.03.2019

 

CP167

Completed

166

Construction of new road at the missing link portion of NH81 along the approved alighment between Harischandrapur & Eastern approach of Kalindri - Bridge from Km 46.550 to Km 59.697 in the district of Malda West Bengal on EPC m

M/s Dynamic Projects Pvt. Ltd.

Dr. P P Dey

SIF

1.18

1 year

04.02.2019

 

CP166

Completed

165

Analysis of side slope failure and base failure and suggestion of corrective measures in connection with Angul-Sukinda New Railway Line project

Rail Vikas Nigam Limited

Dr. S R Dash

SIF

11.8

3 months

14.03.2019

 

CP165

Completed

164

Proof checking of design and drawing of superstructure and substructure of a ROB at Tata Steel Plant, Kalinganagar (Span 2X36m Composite Girder)

RITES Ltd

Dr. S R Dash

SIF

6.64

2 months

15.03.2019

 

CP164

Completed

163

Safety Analysis of Steel Pipeline Crossing Railroad between Surat and Vadodara

M/s Dedicated Freight Corridor Corporation of India Ltd

Dr. S R Dash

SIF

4.13

1 month

06.03.2019

 

CP163

Completed

162

Technical vetting of foundations F1 type, F2 type and F3 type and pedestals of ETP shed at IOCL Guwahati

M/s Minakshi Sarkar Engineering and Valuers

Dr. Goutam Mondal

SIF

1.37

2 months

01.03.2019

 

CP162

Completed

161

Proof checking of detailed design / drawing and calculation of foot over bridge for TSK

M/s Tata Steel Limited, Kalinganagar

Dr. Dinakar Pasla

SIF

11.8

3 months

28.01.2019

 

CP161

Completed

160

Process related improvements at PPL

M/s Paradeep Phosphates Ltd

Prof. Brahma Deo

SMMME

35.71

15 months

21.01.2019

 

CP160

Completed

159

Upgradation of NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in State of West Bengal under Annual Plan 2017-18

M/s Millenium Road Construction Pvt. Ltd

Dr. P P Dey

SIF

1.18

1 year

15.01.2019

 

CP159

Completed

158

Concrete Mix Design for MMLP Paradip

M/s Ircon Infrastructure Services Ltd

Dr. Dinakar Pasla

SIF

4.3

2 months

20.12.2018

 

CP158

Completed

157

Construction of widening to 2-lane with paved shoulder including geometric improvement Ch.318.650 km to 339.940 km (Length 21.949 km) on Churaibari to Agartala section of NH8 (Old NH44) in the state of Tripura on EPC mode (Length 21.9 km)

M/s Ram Kripal Singh Construction Pvt. Ltd

Dr. P P Dey

SIF

1.77

1.5 year

24.12.2018

 

CP157

Completed

156

Implementation of Advanced Machine Learning Algorithms for Cluster Expansion

M/s Indo Korea Science and Technology Center, Bangalore

Dr. Debi Prosad Dogra

SES

28.83

3 years

24.12.2018

12/23/2021

CP156

On-going

155

Technical Scrutiny of Launching Scheme of 2 Nos. Steel girder of RUB No. 46 at NH-49 at NH-49 between Belpahar and Brajrajnagar for OPGC Limited

M/s Larsen & Tubro Ltd

Dr. Goutam Mondal

SIF

4.43

2 months

06.12.2018

 

CP155

Completed

154

Stability Analysis of Core formation with sand and local earth for new BG Rail line from Nuagaon to Paradeep

M/s Rail Vikas Nigam Limited, Bhubaneswar

Dr. Sumanta Halder

SIF

1.65

1 month

12.12.2018

 

CP154

Completed

153

A Model Based Decision Support & Control System for Accretion Control to increase the sponge iron production to the target annual capacity of 4,25,000 Mt through a R&D Project

M/s Tata Sponge Limited

Prof. Brahma Deo

SMMME

34.98

1 year

15.11.2018

14.11.2019

CP153

Completed

152

Proof Checking of the design and drawings of 4 Nos. of RCC box culvert and suggestion of suitable soil stabilization for culvert No.4, at Biju Patnaik International Airport, Bhubaneswar

M/s Airports Authority of India, Bhubaneswar

Dr. S R Dash

SIF

3.54

2 months

29.11.2018

 

CP152

Completed

151

Technicqal Scrutiny of 60m Box oushing section of underpass

Tata Steel Ltd

Dr. S R Dash

SIF

2.21

1 month

15.11.2018

 

CP151

Completed

150

Evaluation of composite cements of Konark and Dalmia

Dalmia Cement Ltd

Dr. Dinakar Pasla

SIF

1.38

1& 1/2 month

13.08.2018

 

CP150

Completed

149

Design and testing smart audio processing and communication systmes for voice processing and surveillance applications

Trijatta technologies (P) Ltd

Dr. M S Manikandan

SES

2.87

6 months

05.11.2018

 

CP149

Completed

148

Monitor Settlements and effectiveness of the PVD-Package 2B construction of roadbed, station building, passenger amenities, Minor bridge, general electrical works in connection with new BR rail line from dumuka Km 57.00 to nuagaon km 68.300 on khurda road division of East coast railway in the State of Odisha

Rail Vikas Nigam Limited

Dr. B hanumatha Rao

SIF

2

1 month

08.10.2018

 

CP148

Completed

147

Proof Checking of Designof Foundation and superstructure of video board at Kalinga Hockey Stadium at Bhubaneswar

SM Consultants

Dr. Sumanta Halder

SIF

1.5

1 month

28.09.2018

 

CP147

Completed

146

Third party audit on fly ash generation and utilization of TTPs in Odisha for the year 2016-17

SPCB

Dr. B Hanumatha Rao

SIF

3.13

3 months

20.09.2018

 

CP146

Completed

145

Technical scrutiny of structural designs for the grade separator structure at Khandagiri Chowk on NH-16, Bhubaneswar, Odisha

National Highways Authority of India

Dr. S R Dash

SIF

21.24

4 months

15.09.2018

 

CP145

Completed

144

Technical Scrutiny of launching scheme of six nos 30.50m open web girder of ROR bridge no. 37 of OPGC Ltd.

L&T Ltd

Dr. S R Dash

SIF

2.66

1 month

30.08.2018

 

CP144

Completed

143

Third party quality assurance consultancy services for Kendriya Vidyalaya No.2, Sambalpur

Braithwaite Burn and Jessop Construction Company Ltd

Dr. Dinakar Pasla

SIF

9.34

6 months

04.07.2018

 

CP143

Completed

142

Design Engineering service for the retrofitting works

ITC Ltd

Dr. Dinakar Pasla

SIF

4.06

1 month

25.07.2018

 

CP142

Completed

141

Process control and optimization at Jindal Stainless Ltd, Jajpur,Odisha

Jindal Stainless Ltd

Prof. Brahma Deo

SMMME

44.18

1 Year

23.07.2018

 

CP141

Completed

140

Design proof checking of five no of railway bridges of RITES Ltd in connection with construction of railway siding of NTPC Lara STTP

RITES Ltd

Dr. S R Dash

SIF

10.47

5 months

05.11.2018

 

CP140

Completed

139

Vetting / proof checking of modification of boiler registration No-OR-1537 and OR-1539

Directorate of factories and boilers, Odisha

Prof. S K Mahapatra

SMS

5.22

6 weeks

10.07.2018

 

CP139

Completed

138

Distributed SDN controller with end to end security

Central Research Laboratory, Bharat Electronics Ltd

Dr. P L Bera

SES

42.06

2 years 9 months

29.06.2018

 

CP138

Completed

137

Checking of design and drawing for the work construction of 7.5 MLD water treatment plant with ancillary structure at Ranibagicha, Sundargarh

Office of the Executive Engineer PH Dept., Rourkela

Dr. R R Dash

SIF

1.03

1 month

25.06.2018

 

CP137

Completed

136

Design of compact/ miniature ultrasonic transducer

GE Oil & Gas (P) Ltd

Dr. Venugopal Arumuru

SMS

2.95

2 months

13.06.2018

 

CP136

Completed

135

Person re-identification for video synopsis

Korea Institute of Science and Technology (KIST)

Dr. D P Dogra

SES

18.54

9 months

11.06.2018

 

CP135

Completed

134

Proof checking of the design and drawings of substructure of railway road over bridge of RITES ROB 1Y, 1x2x24m composite girder

RITES Ltd

Dr. S R Dash

SIF

2.07

2 months

22.05.2018

 

CP134

Completed

133

Proof checking of the design and drawings of substructure for 2 nos of major bridges (13 revised) and 113) in connection with Angul-Sukinda Railway New BG Link Project

Rail Vikas Nigam Ltd

Dr. S R Dash

SIF

2.21

2 months

23.05.2018

 

CP133

Completed

132

UPV Test for primary sludge digestion at STP VI Bhubaneswar

Vatech Wabag Ltd

Dr. Dinakar Pasla

SIF

1.84

3 months

05.05.2018

 

CP132

Completed

131

Electrical conductivity test in bricks

Jindal Steel and Power Limited

Dr. Dinakar Pasla

SIF

2.35

2 months

16.02.2018

 

CP131

Completed

130

Inspection of defective works and submission of compliance report for construction of school building, staff quarters etc. at Kendriya Vidyalaya No. 2, Sambalpur, Odisha

Braithwaite Burn and Jessop Construction Company Limited

Dr. Dinakar Pasla

SIF

3.22

1 day

19.02.2018

 

CP130

Completed

129

Vetting of Structural Design, drawing (Pre-Engineered Building), A/c The Samaja, Mancheswar, Bhubaneswar

LLOYD Insulations Ltd

Dr. Goutam Mondal

SIF

3.78

1 month

13.03.2018

 

CP129

Completed

128

Reconstruction with geometric improvement of existing single/intermediate lane to 2 -lane with paved shoulders configuration from existing KM 92.880 to KM 121.550 of NH-125 in the state of Uttarkakhand on EPC mode, through engineering, procurement and construction (EPC) basis contract.

Shivalaya construction

Dr. P P Dey

SIF

1.18

1 year

02.02.2018

 

CP128

Completed

127

Rehabilitation and upgradation to two-lane with paved shoulders from KM 531/250 to KM 597/946 (Kunkuri to CG/JH border section) of NH-78 in the state of Chhattisgarh under NHDP - IV through engineers, procurement & construction (EPC) basis.

Gawar-S.C.C. (JV), Rahtak, Haryana

Dr. P P Dey

SIF

2.95

1 year

02.02.2018

 

CP127

Completed

126

Slope stability analysis for new BG Line from Nuagaon to Paradeep

ARSS Infrastructure

Dr. Sumanta Halder

SIF

3.98

1 year

28.02.2018

 

CP126

Completed

125

Consultancy services for design of structural elements of MIG 29K and HAWK-AJT infrastructure at INS DEGA, Visakhapatnam

Subhadra Consultants

Dr. Goutam Mondal

SIF

21.59

5 months

 

 

CP125

Approved

124

Checking of safe bearing capacity of pile and suitable remedial measures for ROB at Ghantapada, Talcher

RITES Ltd

Dr. Sumanta Halder

SIF

1.99

3 months

03.01.2018

 

CP124

Completed

123

Concrete cube testing for "Cyclone alert Communication System” in EWDS-Odisha Project for the Village situated in 6 districts viz., Kendrapara, Balasore, Bhadrak, Jagatsinghpur, Puri & Ganjam along coastal line of Odisha state

RG2SK Business Solution

Dr. Goutam Mondal

SIF

0.73

5 months

06.04.2017

 

CP123

Completed

122

Improvement of Tara Tarini Temple Ring Road (Regarding with protection works- Hill top portion) in the district of Ganjam

Rural Works Dept., Govt. of Odisha

Dr. U C Sahoo

SIF

3.54

2 months

20.12.2017

 

CP122

Completed

121

Development of Structural Grade Concretes for TG Deck Foundations

JK Papers Mills Limited

Dr. Dinakar Pasla

SIF

1.77

3 weeks

21.11.2017

 

CP121

Completed

120

Proof checking of guided and fixed POT PTFE bearing

Rail Vikas Nigam Ltd, Rail Vihar

Dr. S R Dash

SIF

1.48

3 weeks

15.12.2017

 

CP120

Completed

119

Vetting of bearing capacity calculations of mission shakti bhawan at pokhariput

IDCO

Dr. B hanumatha Rao

SIF

1.84

3 weeks

04.10.2017

 

CP119

Completed

118

Design proff checking of six-buildings of RVNL work at Haridaspur-Paradeep New BG line

D K Construction

Dr. Goutam Mondal

SIF

1.64

1 month

 

 

CP118

Cancelled

117

Service as proof consultant for structural design components of proposed HL bridge over river biluakhai

Eastrn India Construction (P) Ltd

Dr. S R Dash

SIF

7.38

2 months

20.09.2017

 

CP117

Completed

116

Proof Checking of 19m RCC T Beam ROB for railway siding Project of M/s Emami Cement Ltd.

M/s Emami Cement Ltd

Dr. S R Dash

SIF

1.11

2 weeks

01.09.2017

 

CP116

Completed

115

Proof Checking of launching scheme of composite girders for ROB No. 438 of RVNL Sambalpur – Titlagarh Project

Rahee Infratech Ltd., West Bengal

Dr. S R Dash

SIF

1.84

1 month

 

 

CP115

Cancelled

114

Residual stress measurement in unrestrained and restrained double "V" joints

NMRL, DRDO

Dr. M M Mahapatra

SMS

1.8

3 month

31.08.2017

 

CP114

Completed

113

Proof Checking of Design and Drawing of 14.2m steel semi through rail bridge girder

Sparsh Engineering Company (P) ltd

Dr. S R Dash

SIF

0.59

2 weeks

23.08.2017

 

CP113

Completed

112

Mix Design for construction of ATC tower, Biju Patnaik International Airport, Bhubaneswar

Airport Authority of India

Dr. Dinakar Pasla

SIF

1.88

2 month

10.07.2017

 

CP112

Completed

111

Mix Design for M25 and M30 Grade concretes

M/s Rathee, NBCC, Bhubaneswar

Dr. Dinakar Pasla

SIF

2.39

2 month

10.07.2017

 

CP111

Completed

110

Geotechnical investigations on soil/rock samples

Vedanta Limited, Lanjigarh

Dr. B hanumatha Rao

SIF

14

 

 

 

CP110

Completed

109

Evaluation of Terrazyme (A bioenzyme) stabilized roads constructed under PMGSY

Avijeet Agencies

Dr. U C sahoo

SIF

25

2 years

12.06.2017

 

CP109

Completed

108

Examination of soundness of the intake well at Pankapal on the bank of river Bramhani, Dist: Jajpur

IDCO

Dr. Arindam Sarkar

SIF

16.17

2 month

30.05.2017

 

CP108

Completed

107

Technical Support for application of cold mix Bitumen in Rural Roads

SAPCO Bitumen Company Ltd

Dr. U C sahoo

SIF

30

3 years

25.04.2017

 

CP107

Completed

106

Designing of video synopsys algorithms for visual surveillance

Korea Institute of Science and Technology

Dr. Debi Prosad Dogra

SES

40.39

2 years

26.04.2017

 

CP106

Completed

105

Design and drawing of minor bridges of RVNL proof checking

Rail Vikas Nigam Ltd.

Dr. S R Dash

SIF

8.63

4 month

12.04.2017

 

CP105

Completed

104

Mix Design of cement treated base/ sub-base for PMGSY road in Odisha

Rural Works Dept., Govt of Odisha

Dr. U C sahoo

SIF

94.85

2 month

20.03.2017

 

CP104

Completed

103

Proof checking of launching scheme of composite girders for ROB no 439 A and 423A of RVNL Sambalpur Titlagarh Project

Rahee Infratech Ltd, West Bengal

Dr. S R Dash

SIF

1.15

2 week

05.04.2017

 

CP103

Completed

102

Vetting/ Proof checking of refrigeration for 3000 MT and 5000 MT

Engeering Projects (India) Ltd

Prof. S K Mahapatra

SMS

3.59

3 week

06.04.2017

 

CP102

Completed

101

Strategies to counter energy imbalances in an aluminium reduction cell with an insert in the cathode collector bar

Tata International Ltd

Dr. Randhir Singh

SMMME

1.27

6 month

22.03.2017

 

CP101

Completed

100

Proof checking of structural items of Rambili Project

M/s Suvadra Consultant

Dr. S R Dash

SIF

14.95

4 month

18.03.2017

 

CP100

Completed

99

Vetting of second floor structure of CESU building for additional load

IDCO, BBSR

Dr. B hanumatha Rao

SIF

1.87

2 month

06.03.2017

 

CP099

Completed

98

Dyke height raising of fly ash pond

Vedanta Limited, Lanjigarh

Dr. B hanumatha Rao

SIF

6.74

2 month

 

 

CP098

Completed

97

Characterization of soils treated with Zydex products for its use in PMGSY Roads

Zydex Industries (P) Ltd

Dr. U C sahoo

SIF

2.3

2 month

01.03.2017

 

CP097

Completed

96

Mix Design for WMM & GSB with optimum utilisation of granulated slag

Tata Steel Ltd., Kalinga nagar

Dr. U C Sahoo

SIF

1.15

1 week

09.02.2017

 

CP096

Completed

95

Accretion control to increase the sponge iron production to the target annual capacity of 390000Mt.

Tata Sponge Iron Ltd

Prof. Brahma Deo

SMMME

13.11

1.5year

15.03.2017

 

CP095

Completed

94

Proof checking of major bridge @Ch 1+445 of NH-149 pallahara to pitiri section, Odisha

RKD Construction Pvt. Ltd

Dr. S R Dash

SIF

2.88

1 month

26.01.2017

 

CP094

Completed

93

Review of science hopper lab in the class program - Physics

Science Hopper Education (P) Ltd., Bangalore

Dr. S Chatterjee

SBS

0.67

3 month

20.01.2017

 

CP093

Completed

92

Vetting of design and drawings of aranya bhavan 6th floor conference room

IDCO

Dr. B Hanumatha Rao

SIF

1.5

2 week

02.01.2017

 

CP092

Completed

91

Structural stability for the building with revised loading conditions of 2nd floor level with its retrofitting actions

NBCC (I) Ltd.

Dr. Sumanta Halder

SIF

8

3 month

09.01.2017

 

CP091

Completed

90

Vetting of the AFS Hanger at Bagdogra, super structure drawing (Steel Structure)

M/s MES Engineering, Kolkata

Dr. Goutam Mondal

SIF

1.75

1 month

30.01.2016

 

CP090

Completed

89

Third party audit on the fly ash generation & utilization by TPPs in Odisha for the year 2015-16

M/s State Pollution control Board, Odisha

Dr. B hanumatha Rao

SIF

2.59

2 week

17.02.0217

 

CP089

Completed

88

Proof Checking of Design Splice & its adequacy by M/s S M Consultancy for 30m FOB girder

Rail Vihar Nigam Ltd. Waltair

Dr. S R Dash

SIF

0.41

2 week

09.01.2017

 

CP088

Completed

87

Monitoring and quality assurance of construction of international standard sport climbing wall at kalinga stadium, BBSR

Outdoor School

Dr. Sumanta Halder

SIF

7.1

3 months

09.01.2017

 

CP087

Completed

86

Proof checking of design and drawing of substructure in connection with Angul-Sukinda for 16 nos of major bridges of RVNL

Rail Vihar Nigam Ltd. BBSR

Dr. S R Dash

SIF

11

6 months

09.01.2017

 

CP086

Completed

85

Testing pf CC cores of RE Facia Panel

NHAI, PIU-BBSR

Dr. U C Sahoo

SIF

1.73

1 week

02.01.2017

 

CP085

Completed

84

Construction of new road at the missing link portion of NH81 along the approved alignment between Harischandrapur and eastern approach of kalindri - bridge from Km 46.550 to km59.697 in the district of Malda, West Bengal on EPC mode

Dynamic Projects (P) Ltd

Dr. P P Dey

SIF

2.3

1 year

21.12.2016

 

CP084

Completed

83

Proof checking of design and drawings of substructure for 6 nos of major bridges of RVNL

Rail Vikas Nigam Ltd

Dr. S R Dash

SIF

2.16

1.5 month

15.11.2016

 

CP083

Completed

82

Quality test of Railway track stone (Gudiakateni & Chandikhol)

Jyoti Construction

Dr. U C sahoo

SIF

0.3

1 week

22.11.2016

 

CP082

Completed

81

Development of structural grade concretes utilizing Iron slag as sand replacements (Tata Steel, Jaipur, Odisah)

Tata Steel, Kalinga Nagar

Dr. Dinakar Pasla

SIF

5.74

3 month

21.10.2016

 

CP081

Completed

80

Proof checking of design and drawing of substructure and foundation abutment-2 of bridge no -76

Rail Vikas Nigam Ltd

Dr. S R Dash

SIF

0.86

2 weeks

17.10.2016

 

CP080

Completed

79

Vetting of Structural design and drawing of the Dinjan Hanger foundation

LLOYD Insulations Ltd

Dr. Goutam Mondal

SIF

0.3

1 month

21.06.2016

 

CP079

Completed

78

Analysis and Implementation of non chronological video synopsis and indexing

Indo Korea Science and Technology Center, Bangalore

Dr. Debi Prosad Dogra

SES

15

1 year

04.10.2016

 

CP078

Completed

77

Technical support on pile design in L iquefiable soils for the building at the Sewage Treatment Plant (Tunasan STP)

Vatech Wabag Ltd

Dr. S R Dash

SIF

2.88

2 weeks

26.09.2016

 

CP077

Completed

76

Proof checking of structural calculation/ drawing for proposed construction of JNV/ Nayagarh (Phase-B) works at Odisha

Buildsol, Architectural & Engineering Consultants

Dr. S R Dash

SIF

0.65

2 weeks

17.09.2016

 

CP076

Completed

75

Widening and strengthening of Khunti-Torpa-Kolebira Road (from 0.00 km to 82.055 km) to 2-lane with paved shoulder

Gawar-S.C.C. (JV), Rahtak, Haryana

Dr. P P Dey

SIF

3.52

1.6 year

09.09.2016

 

CP075

Completed

74

Mix design for glass fibre reinforced concrete for IMDC Mancheswar, Bhubaneswar

NBCC, Bhubaneswar

Dr. Dinakar Pasla

SIF

1.64

3 month

17.08.2016

 

CP074

Completed

73

Vetting of feasibility study of pre-treatment of coke oven and by-product plant effluent in coal gasification process units for recovery of Phenol and Ammonia

Jindal Steel and Power Limited

Dr. P Bhunia

SIF

5.75

1.5 month

11.08.2016

 

CP073

Completed

72

Proof checking of design and drawing of road under bridge (RUB) No-68 of RVNL

Rail Vikas Nigam Ltd, Rail Vihar

Dr. S R Dash

SIF

0.36

1 month

09.08.2016

 

CP072

Completed

71

Widening and strengthening from km 94.000 to 131.000 of NH-133 in the state of Jharkhand through EPC Basis contract

Gawar-S.C.C. (JV), Rahtak, Haryana

Dr. P P Dey

SIF

1.59

1 year

01.05.2016

 

CP071

Completed

70

Mix Design for M25 for Mahanadi Institute of medical sciences and research at Talcher , Angul, Odisha

NBCC, Talcher

Dr. Dinakar Pasla

SIF

3.11

3 month

27.07.2016

 

CP070

Completed

69

Study of Probabilities and changes in frequencies and intensities of tropical cyclones and associated wind and rainfall over Puri district of Odisha in climate change projection [Period: 1891-2015]

Institute for Social and Environmental Transition-International (ISET-I)

Prof. U C Mohanty

SEOCS

4.02

3 month

28.07.2016

 

CP069

Completed

68

Mix Design of M30 Grade Concrete for ITC Hotel

Prime Techno Engineers (P) Ltd.

Dr. Dinakar Pasla

SIF

0.45

1 month

02.07.2016

 

CP068

Completed

67

Endorsement of the estimation of production quantities of sponge iron and steel billets of Maa Mahamaya Industries Ltd, R.G. Peta in the years 2006-07, 2007-08 and 2008-09 from the charge mix used

Maa Mahamaya Industries Ltd

Dr. V Pandu Ranga

SMS

1.2

1 Week

07.07.2016

 

CP067

Completed

66

Proof checking of design and drawing for 2 nos of S&T Cabin building for M/S NTPC at Kaniha

RITES Ltd

Dr. S R Dash

SIF

0.72

2 week

17.06.2016

 

CP066

Completed

65

Proof checking of design and drawing of substructure for major bridges no 115 and 131

Rail Vikas Nigam Ltd, Rail Vihar

Dr. S R Dash

SIF

1.15

1 month

21.06.2016

 

CP065

Completed

64

Technical and function test of Gagan enabled GPS PDAs

Conservator for Forest, GIS, Aranya Bhawan

Dr. P R Sahu

SES

1.95

1.5 month

10.05.2015

 

CP064

Completed

63

Video analysis algorithms to detect unusual behaviour in crowd and traffic

outdu Media Tech Pvt. Ltd.

Dr. Debi Prosad Dogra

SES

6.52

3 months

15.06.2016

 

CP063

Completed

62

Design and developing a portable wireless noise level and vibration monitors

Pentagon Rugged Systems India (P) Ltd

Dr. M S Manikandan

SES

1.04

3 months

15.05.2016

 

CP062

Completed

61

Design and developing a portable wireless air quality monitor

Pentagon Rugged Systems India (P) Ltd

Dr. M S Manikandan

SES

2.44

3 month

15.05.2016

 

CP061

Completed

60

Testing of Panels for energy absoption test

ILFS SIF

Dr. Dinakar Pasla

SIF

2.86

1 month

23.05.2016

 

CP060

Completed

59

Inspection of quality control laboratory

Maa Mahamaya Industries Ltd

Dr. V Pandu Ranga

SMS

1.19

1 week

06.05.2016

 

CP059

Completed

58

Implementation of water quality monitoring and management system

Pentagon Rugged Systems India (P) Ltd

Dr. M S Manikandan

SES

1.49

2 months

15.04.2016

 

CP058

Completed

57

Testing of light weight aggregates (LWAs) in various concrete grades and the physical and chemical testing of the aggregates and also the structural load behaviour of the LWA concretes

Jindal Steel and Power Limited

Dr. Dinakar Pasla

SIF

5.64

3 months

12.05.2016

 

CP057

Completed

56

Proof Checking of Design and Drawing of Substructure of Railway Bridge of RVNL

Rail Vikas Nigam Ltd, Rail Vihar

Dr. S R Dash

SIF

0.86

1 week

08.04.2016

 

CP056

Completed

55

Vetting of structure and superstructure of sports climbing facility at Kalinga Stadium confirming to IFSC standard

Outdoor School

Dr. Sumanta Halder

SIF

4.09

3 months

10.03.2016

 

CP055

Completed

54

Stability study of the ash filled area

Vedanta Limited

Dr. B hanumatha Rao

SIF

3.14

1 year

 

 

CP054

Completed

53

C/C++ implementation with adequate GUI for sparsity based abnormal event detection

Indo Korea Science and Technology Center, Bangalore

Dr. Debi Prosad Dogra

SES

7

6 months

10.02.2016

 

CP053

Completed

52

C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet process

Indo Korea Science and Technology Center, Bangalore

Dr. Debi Prosad Dogra

SES

8

6 months

10.02.2016

 

CP052

Completed

51

Design and Drawing for Katekela Lagoon-2 ash pond

Vedanta Limited

Dr. B hanumatha Rao

SIF

8.19

1 Year

 

 

CP051

Completed

50

Strenghthening and Widening/ Reconstruction of Dumka Masalia-Nala upto West Bengal Border Road lane with paved shoulder under EPC Mode (55 km)

Barbrik_RCPL(JV)

Dr. P P Dey

SIF

2.36

1year

 

 

CP050

On-going

49

Design of experimental road using fly ash

Sesa Sterlite Limited

Dr. B hanumatha Rao

SIF

3.078

2 months

 

 

CP049

Completed

48

Technical Evaluation of cement concrete roads in Odisha

Planning & Coordination Dept., Govt. of Odisha

Dr. U C sahoo

SIF

28.16

8 months

30.10.2015

 

CP048

Completed

47

Technical Scrutiny of irrigation road proposal under IRC & IS

Water Reseources Dept., Govt. of Odisha

Dr. U C sahoo

SIF

4.26

3 month

13.11.2015

 

CP047

Completed

46

Vetting of schematic drawing along with transmission loss calculation for 6.6KV/ 415V OHDC line

Megha Engineering & SIF Ltd.

Dr. S B Karanki

SES

0.33

2 weeks

30.09.2015

 

CP046

Completed

45

Modelling of the Cathode assembly in Aluminium reduction cell

Tata International Ltd

Dr. Randhir Singh

SMMME

0.74

3 month

16.09.2015

 

CP045

Completed

44

Preparation of DPR for the proposed National Institute for New Energy & Innovation at Bhubaneswar

Ministry of New Renewable Energy, Govt. of India

Prof. N C Sahoo

SES

5

 

14.10.2015

 

CP044

Completed

43

Improvement and upgradation of two lane with paved shoulder configurationof Koderma-Domchanch-Khorimahua-Jamua Road (SH-13) under EPC mode in Jharkhand

On behalf of NIT Durgapur as external expert
RKS Constuction (P) Ltd. Ranchi

Dr. P P Dey

SIF

4

2 year

27.07.2015

 

CP043

Completed

42

Conducting Mix Design for M50 for NBCC Bhubaneswar

NBCC Ltd

Dr. Dinakar Pasla

SIF

1.33

3 month

11.07.2015

 

CP042

Completed

41

Geotechnical investigations on soil/rock samples

NBCC Ltd

Dr. B hanumatha Rao

SIF

1.2

1 week

24.06.2015

 

CP041

Completed

40

Process optimization studies on leaching of high ash coal to produce low ash coal

Tata Steel Ltd

Prof. N P H Padmanabhan

SMMME

6.75

7 month

15.05.2015

 

CP040

Completed

39

Survey on process study of CPC and EPC of Amritesh Industries Pvt. Ltd, Angul

Amritesh Industries Pvt. Ltd.

Dr. Akhilesh Barve

SMS

0.4

1 Week

24.06.2015

 

CP039

Completed

38

Testing of Ballast from Baghua Querry

Maa Chandi Stone Crushing

Dr. S R Dash

SIF

0.17

1 week

05.06.2015

 

CP038

Completed

37

Surge analysis for 1000mm Dia water rising main at Jajpur

IDCO

Dr. Arindam Sarkar

SIF

1.9

1 month

27.05.2015

 

CP037

Completed

36

Proof checking of srtructural design nad drawing

Hindustan steel works construction Ltd.

Dr. S R Dash

SIF

0.43

2 weeks

12.05.2015

 

CP036

Completed

35

Survey of capacity assessment of Amritesh Industries Pvt. Ltd.

Amritesh Industries Pvt. Ltd.

Dr. V Pandu Ranga

SMS

0.27

1 week

06.05.2015

 

CP035

Completed

34

Design and analysis for making rural road about 1 km by using JK Paper Mills fly ash

JK Papers Mills Limited

Dr. B Hanumatha Rao

SIF

2.85

1.5 month

20.04.2015

 

CP034

Completed

33

Assessment of structural safety of construction of balance six floor of the IDCOL corporate office building, BBSR

IDCO

Dr. Sumanta Halder

SIF

12.64

3 month

09.04.2015

 

CP033

Completed

32

Testing of materials and conducting design mix M-25,M-30 & M-40 in connection with construction of commercial cum residential complex

National Building construction corporation Ltd.

Dr. P Bhunia

SIF

4.38

 

09.04.2015

 

CP032

Completed

31

Report on Dolomite and its usage in sponge Iron production

Ganesh Sponge (P) Ltd.

Dr. Soobhankar Pati

SMMME

0.3

1 day

17.03.2015

 

CP031

Completed

30

Opinion regarding the dri reduction furnace at JSPL plant Angul

Kazstroy Services SIF Pvt. Ltd

Dr. Dinakar Pasla

SIF

2.81

3 month

18.03.2015

 

CP030

Completed

29

Assessing the soil for earth work construction

IVRCL Limited

Dr. B hanumatha Rao

SIF

0.53

1 Week

12.03.2015

 

CP029

Completed

28

Testing of AAC Blocks

Overtop marketing (P) Ltd.

Dr. Dinakar Pasla

SIF

3.07

2 month

12.03.2015

 

CP028

Completed

27

Testing of AAC Blocks

Fast Build Blocks Pvt. Ltd

Dr. Dinakar Pasla

SIF

0.77

2 month

13.03.2015

 

CP027

Completed

26

Vetting/checking of the project report prepared by CEMCPL for Ordnance Factory, Ambajhari, Nagpur

Centre for Envotech and Management Consultancy (P) Ltd

Dr. R R Dash

SIF

1.4

1 month

30.01.2015

 

CP026

Completed

25

Robotic application in boiler NDT assessment

OMS Power Training and research Institute

Dr. V Pandu Ranga

SMS

3.29

2 months

07.01.2015

 

CP025

Completed

24

Testing of Fibre shorcrete panels for energy absorption test

Leighton India Contractors (P) Ltd

Dr. Dinakar Pasla

SIF

4.68

3 months

04.12.2014

 

CP024

Completed

23

Design and stability analysis of an embankment for new BG rail line from Haridaspur to Paradeep in the Khurda district Odisha

Tracks & Tower Infratech (P) Ltd

Dr. B Hanumatha Rao

SIF

3.65

1 month

02.12.2014

 

CP023

Completed

22

Testing of Fibre shorcrete panels for energy absorption test

Leighton India Contractors (P) Ltd

Dr. Dinakar Pasla

SIF

5.26

3 months

06.11.2014

 

CP022

Completed

21

Issue of Check Proof Certificate and Procedure for the rectification of FOB along with necessary drawing regarding

McML-ECI(JV)

Dr. S R Dash

SIF

1.26

2 Weeks

16.09.2014

 

CP021

Completed

20

Assessment of High Compressibility of cut spoil

Tracks & Tower Infratech (P) Ltd

Dr. B hanumatha Rao

SIF

1.26

1 month

16.09.2014

 

CP020

Completed

19

Widening & Strengthening of Bhawanipatna-Gunupur-Kasipur Road (SH-44) to 2 Lane without paved shoulder from Km 0/000 to 13/000 & Km 42/940 to Km 48/840 on EPC mode in the district of Kalahandi

Office of the Executive Engineer Koraput (R&B) Division

Dr. B hanumatha Rao

SIF

0.5

1 month

12.09.2014

 

CP019

Completed

18

Vetting of structural Design and Drawing for the Construction of L.I.G and L.M.I.G housing Complex along with Commercial Complex at Kalinga Nagar Zone- K4

BDA

Dr. S R Dash

SIF

-

-

 

 

CP018

Cancelled

17

Impact Assessment study of city bus services operational under JnNURM

Housing and Urban Development Department, Govt of Odisha

Dr. Debasis Basu

SIF

6.98

4 month

13.08.2014

 

CP017

Completed

16

Proof Checking of POT cum PTFE Bearing

Bhubaneswar Expressways Pvt. Ltd

Dr. Dinakar Pasla

SIF

1.01

1 month

30.07.2014

 

CP016

Completed

15

Co-operation and expert advice for improvement of short and extended range (monthly scale) prediction of rainfall in the tropics

RIMES

Prof. U C Mohanty

SEOCS

10

1 Year

18.06.2014

 

CP015

Completed

14

Design and testing aerated autoclaved fly concrete blocks (AAC)

Fast Build Blocks Pvt. Ltd

Dr. Dinakar Pasla

SIF

1.18

1 month

10.05.2014

 

CP014

Completed

13

Consultancy for investigation in ARC, Charbatia

Airports Authority of India, Biju Pattanaik Airport

Dr. Dinakar Pasla

SIF

13.49

3 month

16.05.2013

 

CP013

Completed

12

Proof checking of design and drawing of three no. box bridges under Railway loading in connection with construction of railway siding to serve Koderma Thermal Power Plant (2x500MW) of DVC

RITES Ltd

Prof. S.C. Dutta

SIF

3.79

3 month

14.11.2012

 

CP012

Completed

11

Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and Odisha

NRIDA

Dr U C Sahoo

SIF

42.72

 

30.08.2012

 

CP011

Completed

10

Design of weighbridge & moveable floor crane

DS Systems

Dr. S N Panigrahi

SMS

1.16

10 months

14.06.2012

 

CP010

Completed

9

Design of two number of 220KV transmission line tower foundations between Kantapalli to Hindalco in the mahanadi river

Hindalco
Industries Ltd.

Dr. Arindam Sarkar

SIF

7.18

8 months

11.04.2012

 

CP009

Completed

8

House hold energy consumption survey-2012

WMG

Dr. S R Samantaray

SES

1.2

1 Year

24.03.2012

 

CP008

Completed

7

Proof Checking of design of pile foundations for location no. 16A and 24 of 220 KV transmission line tower from Bidanasi ( Cuttack) near the bank of Kathajodi to Nuapada (Cuttack) in the spill zone

Orissa Power
Transmission
Corporation Limited

Dr. Sumanta Halder

SIF

2.27

1 month

19.10.2011

 

CP007

Completed

6

Vetting of structural analysis of design and drawing for the new residential complex at HAL Koraput

HAL

Prof. S.C. Dutta

SIF

5

1 month

18.10.2011

 

CP006

Completed

5

Proof Checking of design of river bed pile foundation for location no. 10,12 & 15 of 220KV transmission line from Bidanasi to Cuttack grid substation

Orissa Power
Transmission
Corporation Limited

Dr. Sumanta Halder

SIF

3.31

1 month

31.05.2011

 

CP005

Completed

4

Preparation of special Foundation for 220KV Tower for Two locations(158-c & 159)

Hindalco
Industries Ltd.

Dr. Arindam Sarkar

SIF

4.84

1 month

06.05.2011

 

CP004

Completed

3

Proof Checking od 3 Nos panel cabin building and 1 no. gate lodge/IBS Building for M/s. Nalco Angul

RITES Ltd

Dr. Dinakar Pasla

SIF

0.6

3 months

11.10.2010

 

CP003

Completed

2

Remedial Measures for Horizontal and vertical
Cracks Developed in the walls, floors, roof etc of ESI Hospital, Jaykaypur

ESI Corporation

Dr. Dinakar Pasla

SIF

3.95

3 months

06.09.2010

 

CP002

Completed

1

Vetting of the design of lighting masts and their foundations in connections with commissioning of lighting systems of wankahade stadium

Bajaj Electricals Ltd.

Prof. S.C. Dutta

SIF

1.1

1 month

17.09.2009

 

CP001

Completed