Consultancy Project

Sl.No Title Consulting Agencies PI of Project School  Value of Project
Rs. in Lakhs 
 Duration of the project  Start Date Code Status
197 Technical support for rehabilitation of defunct NH-5, Balugaon from 0/0 Km to 8/0 Km Chief Engineer (DPI & Roads) Odisha Dr. U C Sahoo SIF 3.98 3 Months 06.12.2019 CP197 On-going
196 Structural vetting of bridges and retaining walls of 2x25MW Maithan Right Bank Thermal Power Project for M/s L&T Ltd L&T Ltd Dr.Suresh R Dash SIF 29.50 3 Months 04.12.2019 CP196 On-going
195 Design Verification of Boudh WSP L&T Construction Dr. Dinakar Pasla SIF 5.90 4 Months 03.12.2019 CP195 On-going
194 Stability analysis and method of improving the bearing capacity from KM 56.00 to KM 57.10 - Package 2A (Construction of road bed, station buildings, passenger amenities, minor bridges, general electrical works in connection with new BG rail line from Kendrapara (Incl) KM 42.040 to Dumuku Km 57.000 on Khurdha road division of East Coast Railway in the State of Odisha, India M/s RVNL Dr. B Hanumantha Rao SIF 4.06 2 Months 27.11.2019 CP194 On-going
193 Technical Scrutiny of structural drawing and design calculations of 3x300 MSV and 1x600 MSV tank M/s Creative Studio Dr. Devesh Punera SIF 1.77 1 month 18.11.2019 CP193 On-going
192 Verification of basic and detailed engineering design of RWSS mega water project of Rairakhol M/s Voltas Limited Dr. Arindam Sarkar SIF 29.50 6 Months 19.11.2019 CP192 On-going
191 Stability study in tailings dams and scrutiny of dry stacking procedure of red mud M/s Vedanta Limited Dr. B Hanumantha Rao SIF 16.92 6 Months 24.10.2019 CP191 On-going
190 Mix Design for married Accommodation at Chandipur M/s Komal Buildcon Pvt. Ltd Dr. Dinakar Pasla SIF 1.15 2 Months 01.11.2019 CP190 On-going
189 Testing of Bituminous core samples of Paga-Gopinathpur-Kuanpal Road Executive Engineer, QC(R&B) Div. Govt. of Odisha Dr. U C Sahoo SIF 1.19 15 Days 30.10.2019 CP189 On-going
188 Structural vetting of 17 bridges for M/s Adani Infra (India) Ltd. At Hansdiha Godda Section under Eastern Railway PIR Projects and Consultancy Private Limited Dr. Goutam Mondal SIF 23.60 6 Months 01.10.2019 CP188 On-going
187 Proof checking of design/drawings of bearings with reference to the grade separator structure at Khandagiri Chowk (Km. 412) on NH-5 (New NH-16), Bhubaneswar M/s RKD Constructions Ltd Dr. Suresh R Dash SIF 3.54 6 Months 26.09.2019 CP187 On-going
186 Coriolis flowmeter study M/s Honeywell Technology Dr. Venugopal Arumuru SMS 13.00 1 Year 18.09.2019 CP186 On-going
185 Design and development of Flow measurement Solution M/s Honeywell Technology Dr. Venugopal Arumuru SMS 21.50 1 Year 18.09.2019 CP185 On-going
184 Checking Structural strength of pier of East Coast Railway Constructed over Luna River M/s RVNL Dr. Dinakar Pasla SIF 1.06 1 month 20.09.2019 CP184 On-going
183 Design of M25 Grade RCC for Structural Elements Airport Authority of India Dr. Dinakar Pasla SIF 1.01 2 Months 01.09.2019 CP183 On-going
182 2nd phase monitoring settlements and effectiveness of the PVD-Package 2B - Construction of road bed, station buildings, passenger amenities, minor bridges, general electrical works in connection with new BG rail line from Dumuku KM 57.000 to Nuagaon KM 68.300 on Khurdha roda division of East Coast Railway in the state of Odisha, India M/s RVNL Dr. B Hanumantha Rao SIF 2.00 15 Days 31.08.2019 CP182 Completed
181 Product quality improvement program at Deem Roll Tech. Ltd. M/s Deem Roll Tech. Ltd Dr. Partha Sarathi De SMMME 0.61 2 Months 08.08.2019 CP181 On-going
180 Re-identification guided video synopsis Korea Institute of Science and Technology Dr. Debi Prosad Dogra SES 18.34 9 Months 09.08.2019 CP180 On-going
179 Request to assess the structural integrity of sports climbing wall Dept. of Sports & Youth Services, Govt. of Odisha Dr. Dinakar Pasla SIF 5.60 3 Months 09.08.2019 CP179 On-going
178 Testing suitability of dredged sand for use in Road embankment & subgrade Office of the Executive Engineer Bhadrak Dr. U C Sahoo SIF 2.39 2 Months 17.07.2019 CP178 Completed
177 Structural vetting of proposed bridge for Private Railway siding near Barbil Station of Chakradharpur division in South Eastern Railway to serve M/s Rungta Mines Ltd M/s PIR Projects and Consultancy Private Limited Dr. Goutam Mondal SIF 2.95 6 Months 17.06.2019 CP177 Completed
176 Core sample analysis of composite clay lining of secured engineering landfill for disposal of hazardous waste M/s RAMKY Enviro Engineers Ltd Dr. B Hanumantha Rao SIF 1.15 15 Days 21.05.2019 CP176 Completed
175 Engineering operation philosophy for Long-term Mud Management M/s Utkal Alumina International Limited Dr. B Hanumantha Rao SIF 21.48 9 Months 16.04.2019 CP175 On-going
174 Checking of bearing capacity of pile for LPG Bottling Plant IOCL M/s Kosan SFPL Projects Pvt. Ltd Dr. Sumanta Haldar SIF 1.50 1 Month 20.05.2019 CP174 On-going
173 Structural vetting of proposed bridge for Private Railway Siding at Mahalimarup Station to serve M/s Shree Cement Ltd, and at Lathikata of Chakradharpur division in South Eastern Railway to serve M/s Orissa Industries Ltd. M/s PREPPL Dr. Goutam Mondal SIF 5.16 2 Months 10.05.2019 CP173 Completed
172 Technical scrutiny of Drawing and Design of Thrust Bed for Box Pushing Section Below Railway Track M/s Tata Steel Limited Dr. Devesh Punera SIF 2.21 1 Month 29.04.2019 CP172 On-going
171 Vetting of structure design/drawing for the project of KV for 6 locations at Jharkhand & Odisha State M/s CP & DS Associates Dr. Sumanta Haldar SIF 5.07 10 months 11.03.2019 CP171 Completed
170 Residual stress measurement by Deep-hole drilling technique NMRL, DRDO Dr. M M Mahapatra SMS 39.80 1 Year 20.03.2019 CP170 On-going
169 Development of FEM model for Design Improvement of multi layered Baffle NPOL, DRDO Dr. S N Panigrahi SMS 4.61 1 Year 12.03.2019 CP169 On-going
168 Testing of ferro alloy slag granule M/s Nava Bharat Ventures Limited Dr. B Hanumantha Rao SIF 1.27 20 Days 22.03.2019 CP168 Completed
167 Mix design for M30 and M35 grade of Concretes M/s Ultratech Cement Ltd Dr. Dinakar Pasla SIF 1.03 45 Days 19.02.2019 CP167 Completed
166 Construction of new road at the missing link portion of NH81 along the approved alighment between Harischandrapur & Eastern approach of Kalindri - Bridge from Km 46.550 to Km 59.697 in the district of Malda West Bengal on EPC m M/s Dynamic Projects Pvt. Ltd Dr. Partha Pratim Dey SIF 1.18 1 Year 04.02.2019 CP166 On-going
165 Analysis of side slope failure and base failure and suggestion of corrective measures in connection with Angul - Sukinda New Railway Line Project M/s RVNL Dr. S R Dash SIF 11.80 3 Months 14.03.2019 CP165 On-going
164 Proof Checking of Design and Drawing of Superstructure and Substructure of a ROB at Tata Steel Plant, Kalinganagar (Span 2x36m Composite Girder) M/s RITES Limited Dr. S R Dash SIF 6.63 2 Months 18.03.2019 CP164 On-going
163 Safety Analysis of Steel Pipeline Crossing Railroad between Surat and Vadodara M/s DFCCIL Dr. S R Dash SIF 4.13 1 Month 06.03.2019 CP163 On-going
162 Technical vetting of foundations F1 type, F2 type and F3 type and pedestals of ETP shed at IOCL Guwahati M/s Minakshi Sarkar Engineering and Valuers Dr. Goutam Mondal SIF 1.37 2 Months 01.03.2019 CP162 Completed
161 Proof checking of detailed design / drawing and calculation of foot over bridge for TSK M/s Tata Steel Limited, Kalinganagar Dr. Dinakar Pasla SIF 11.80 3 Months 28.01.2019 CP161 Completed
160 Process related improvements at PPL M/s Paradeep Phosphates Ltd Prof. Brahma Deo SMMME 35.71 15 Months 21.01.2019 CP160 On-going
159 Upgradation of NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in State of West Bengal under Annual Plan 2017-18 M/s Millenium Road Construction Pvt. Ltd Dr. Partha Pratim Dey SIF 1.18 1 Year 15.01.2019 CP159 On-going
158 Concrete Mix Design for MMLP Paradip M/s Ircon Infrastructure Services Ltd. Dr. Dinakar Pasla SIF 4.29 2 Months 20.12.2018 CP158 Completed
157 Construction of widening to 2-lane with paved shoulder including geometric improvement Ch.318.650 km to 339.940 km (Length 21.949 km) on Churaibari to Agartala section of NH8 (Old NH44) in the state of Tripura on EPC mode (Length 21.9 km) M/s Ram Kripal Singh Construction Pvt. Ltd Dr. Partha Pratim Dey SIF 1.77 1.5 Year 24.12.2018 CP157 On-going
156 Implementation of Advanced Machine Learning Algorithms for Cluster Expansion Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES 12.27 1 Year 24.12.2018 CP156 On-going
155 Technical Scrutiny of Launching Scheme of 2 Nos. Steel girder of RUB No. 46 at NH-49 at NH-49 between Belpahar and Brajrajnagar for OPGC Limited M/s L&T Limited Dr. Goutam Mondal SIF 4.43 2 Months 06.12.2018 CP155 Completed
154 Stability Analysis of Core formation with sand and local earth for new BG Rail line from Nuagaon to Paradeep M/s Rail Vikas Nigam Ltd Dr. Sumanta Haldar SIF 1.65 1 Month 12.12.2018 CP154 Completed
153 A Model Based Decision Support & Control System for Accretion Control to increase the sponge iron production to the target annual capacity of 4,25,000 Mt through a R&D Project M/s Tata Sponge Iron Ltd Prof. Brahma Deo SIF 34.97 1 Year 15.11.2018 CP153 On-going
152 Proof Checking of the design and drawings of 4 Nos. of RCC box culvert and suggestion of suitable soil stabilization for culvert No.4, at Biju Patnaik International Airport, Bhubaneswar Airports Authority of India, Biju Pattanaik Airport Dr. S R Dash SIF 3.18 2 Months 29.11.2018 CP152 Completed
151 Technical Scrutiny of 60m Box Pushing Section of Underpass M/s Tata Steel Ltd Dr. S R Dash SIF 2.21 1 Month 15.11.2018 CP151 Completed
150 Evaluation of Composite Cements of Konark & Dalmia M/s Dalmia Cements Ltd Dr. Dinakar Pasla SIF 1.38 45 Days 13.08.2018 CP150 Completed
149 Design and Testing of Smart Audio Processing and Communication Systems for Voice Processing and Surveillance Applications M/s Trijatta Technologies Pvt Ltd. Dr. M S Manikandan SES 2.86 6 Months 05.11.2018 CP149 On-going
148 Monitor settlements and effectiveness of the PVD-Package 2B (Construction of Roadbed, station buildings, Passenger amenities, Minor bridges, General electrical works in connection with new BR rail line from Dumuka Km 57.000 to Nuagaon Km 68.300 on Khurda road division of East Coast Railway in the State of Odisha M/s RVNL Dr. B Hanumantha Rao SIF 2.00 1 Month 08.10.2018 CP148 Completed
147 Proof Checking of Design of Foundation and Superstructure of Video Board at Kalinga Hockey Stadium at Bhubaneswar M/s SM Consultants Dr. Sumanta Haldar SIF 1.50 1 Month 28.09.2018 CP147 Completed
146 Third party audit on fly ash generation and utilization of TTPs in Odisha for the year 2016-17 State Pollution Control Board Dr. B Hanumantha Rao SIF 2.86 3 Months 20.09.2018 CP146 Completed
145 Technical scrutiny of structural designs for the grade separator structure at Khandagiri Chowk on NH-16, Bhubaneswar, Odisha NHAI Dr. S R Dash SIF 21.24 4 Months 15.09.2018 CP145 On-going
144 Technical scrutiny of launching scheme of six nos. 30.5m open web gider of ROER Bridge No. 37 of OPGC Ltd M/s L&T Limited Dr. S R Dash SIF 2.66 1 Month 30.08.2018 CP144 Completed
143 Third party quality assurance consultancy services for Kendriya Vidyalaya No.2, Sambalpur M/s Braithwaite Burn and Jessop Construction Company Ltd Dr. Dinakar Pasla SIF 9.34 6 Months 01.07.2018 CP143 Completed
142 Design Engineering service for the retrofitting works M/s ITC Limited Dr. Dinakar Pasla SIF 4.06 1 Month 25.07.2018 CP142 Completed
141 Process control and optimization at Jindal Stainless Ltd, Jajpur,Odisha M/s Jindal Stainless Ltd Prof. Brahma Deo SMMME 44.18 1 Year 23.07.2018 CP141 On-going
140 Design proof checking of five no of railway bridges of RITES Ltd in connection with construction of railway siding of NTPC Lara STTP M/s RITES Limited Dr. S R Dash SIF 10.47 2 Months 05.11.2018 CP140 Completed
139 Vetting / proof checking of modification of boiler registration No-OR-1537 and OR-1539 Directorate of Factories and Boilers, Govt. of Odisha Prof. S K Mahapatra SMS 5.22 6 weeks 10.07.2018 CP139 Completed
138 Distributed SDN controller with end to end security M/s Bharat Electronics Limited Dr. P.L. Bera SES 42.06 2 Years 29.06.2018 CP138 On-going
137 Checking of design and drawing for the work construction of 7.5 MLD water treatment plant with ancillary structure at Ranibagicha, Sundargarh PH Dept., Govt. of Odisha Dr. R R Dash SIF 1.03 1 Month 25.06.2018 CP137 Completed
136 Design of compact/ miniature ultrasonic transducer GE Oil & Gas (P). Ltd Dr. Venugopal Arumuru SMS 2.95 2 Months 13.06.2018 CP136 Completed
135 Person re-identification for video synopsis Korea Institute of Science and Technology Dr. Debi Prosad Dogra SES 18.54 9 Months 11.06.2018 CP135 Completed
134 Proof checking of the design and drawings of substructure of railway road over bridge of RITES ROB 1Y, 1x2x24m composite girder RITES Limited Dr. S R Dash SIF 2.07 2 Months 22.05.2018 CP134 Completed
133 Proof checking of the design and drawings of substructure for 2 nos of major bridges (13 revised) and 113) in connection with Angul-Sukinda Railway New BG Link Project Rail Vikas Nigam Limited Dr. S R Dash SIF 2.21 2 Months 23.05.2018 CP133 Completed
132 UPV Test for primary sludge digestion at STP VI Bhubaneswar Vatech Wabag Ltd Dr. Dinakar Pasla SIF 1.84 3 Months 05.05.2018 CP132 Completed
131 Electrical Conductivity Test in Bricks M/s Jindal Steel and Power Ltd Dr. Dinakar Pasla SIF 2.35 2 Months 16.02.2018 CP131 Completed
130 Inspection of defective works and submission of compliance report for construction of school building, staff quarters etc. at Kendriya Vidyalaya No. 2, Sambalpur, Odisha M/s Braithwaite Burn and Jessop Construction Company Limited Dr. Dinakar Pasla SIF 3.22 1 day 19.02.2018 CP130 Completed
129 Vetting of Structural Design, drawing (Pre-Engineered Building), A/c The Samaja, Mancheswar, Bhubaneswar M/s LLoyd Insulations Dr. Goutam Mondal SIF 3.78 1 Month 13.03.2018 CP129 Completed
128 Reconstruction with geometric improvement of existing single/intermediate lane to 2 -lane with paved shoulders configuration from existing KM 92.880 to KM 121.550 of NH-125 in the state of Uttarkakhand on EPC mode, through engineering, procurement and construction (EPC) basis contract Shivalaya Construction Co. Pvt Ltd. Dr. Partha Pratim Dey SIF 1.18 1 Year 02.02.2018 CP128 On-going
127 Rehabilitation and upgradation to two-lane with paved shoulders from KM 531/250 to KM 597/946 (Kunkuri to CG/JH border section) of NH-78 in the state of Chhattisgarh under NHDP - IV through engineers, procurement & construction (EPC) basis GAWAR-S.C.C.(JV) Dr. Partha Pratim Dey SIF 2.95 1 Year 02.02.2018 CP127 On-going
126 Slope stability analysis for new BG Line from Nuagaon to Paradeep M/s ARSS Infrastructure Project Ltd. Dr. Sumanta Haldar SIF 3.98 1 Year 28.02.2018 CP126 Completed
125 Consultancy services for design of structural element of MIG 29K & HAWK-AJT infrastructure at INS DEGA Visakhapatnam M/s Subhadra Consultants Dr. S R Dash SIF 21.59 5 months     Approved
124 Checking of safe bearing capacity of pile and suitable remedial measures for ROB at Ghantapada, talcher RITES Limited Dr. Sumanta Haldar SIF 1.99 3 months 03.01.2018 CP124 Completed
123 Concrete cube testing for "Cyclone alert Communication System” in EWDS-Odisha Project for the Village situated in 6 districts viz., Kendrapara, Balasore, Bhadrak, Jagatsinghpur, Puri & Ganjam along coastal line of Odisha state RG2SK Business Solution Dr. Goutam Mondal SIF 0.73 5 months 06.04.2017 CP123 Completed
122 Improvement of Tara Tarini Temple Ring Road (Regarding with protection works- Hill top portion) in the district of Ganjam Rural Works Department, Govt. of Odisha Dr. U C Sahoo SIF 3.54 2 months 20.12.2017 CP122 Completed
121 Development of Structural Grade Concretes for TG Deck Foundations M/s JK Paper Mill Dr. Dinakar Pasla SIF 1.77 3 weeks 21.11.2017 CP121 Completed
120 Proof Checking of guided and fixed pot PTFE bearing M/s Rail Vikas Nigam Ltd Dr. S R Dash SIF 1.48 3 weeks 15.12.2017 CP120 Completed
119 Vetting of bearing capacity calculations of mission shakti bhawan at pokhariput IDCO Dr. B Hanumantha Rao SIF 1.84 3 weeks 04.10.2017 CP119 Completed
118 Design proff checking of six-buildings of RVNL work at Haridaspur-Paradeep New BG line D K Construction Dr. Goutam Mondal SIF 1.64 1 month   CP118 Cancelled
117 Service as proof consultant for structural design components of proposed HL bridge over river biluakhai M/s Eastern India Construction (P) Ltd Dr. S R Dash SIF 7.38 2 months 20.09.2017 CP117 Completed
116 Proof Checking of 19m RCC T Beam ROB for railway siding Project of M/s Emami Cement Ltd. M/s Emami Cement Ltd Dr. S R Dash SIF 1.11 2 weeks   CP116 Completed
115 Proof Checking of launching scheme of composite girders for ROB No. 438 of RVNL Sambalpur Titlagarh Project Rahee Infratech Ltd., West Bengal Dr. S R Dash SIF 1.84 1 month   CP115 Cancelled
114 Residual stress measurement in unrestrained and restrained double "V" joints NMRL, DRDO Dr. M M Mahapatra SMS 1.80 3 month 31.08.2017 CP114 Completed
113 Proof Checking of Design and Drawing of 14.2m steel semi through rail bridge girder Sparsh Engineering Company (P) ltd Dr. S R Dash SIF 0.59 2 weeks 23.08.2017 CP113 Completed
112 Mix Design for construction of ATC tower, Biju patnaik International Airport, Bhubaneswar Airport Authority of India Dr. Dinakar Pasla SIF 1.88 2 Months 10.07.2017 CP112 Completed
111 Mix Design for M25 and M30 Grade concretes M/s Rathee, NBCC Dr. Dinakar Pasla SIF 2.39 2 Months 10.07.2017 CP111 Completed
110 Geotechnical investigations on soil/rock samples Vedanta Limited Dr. B Hanumantha Rao SIF 16.52 2 Months 25.05.2017 CP110 Completed
109 Evaluation of Terrazyme (A bioenzyme) stabilized roads constructed under PMGSY Avijeet Agencies Dr. U C Sahoo SIF 25.00 2 Years 12.06.2017 CP109 On-going
108 Examination of soundness of the intake well at Pankapal on the bank of river Bramhani, Dist: Jajpur IDCO Dr. Arindam Sarkar SIF 16.17 2 Months 30.05.2017 CP108 Completed
107 Work on technical support of Cold-Mix technology SAPCO Bitumen Company Ltd Dr. U C Sahoo SIF 30.00 3 Years 25.04.2017 CP107 Completed
106 Designing of video synopsys algorithms for visual surveillance Korea Institute of Science and Technology Dr. Debi Prosad Dogra SES 40.39 2 Years 26.04.2017 CP106 Completed
105 Design and drawing of minor bridges of RVNL proof checking Rail Vikas Nigam Ltd Dr. S R Dash SIF 8.63 4 Months 12.04.2017 CP105 Completed
104 Mix Design of cement treated base/ sub-base for PMGSY road in Odisha Rural Works Department, Govt. of Odisha Dr. U C Sahoo SIF 94.85 22 Months 20.03.2017 CP104 Completed
103 Proof checking of launching scheme of composite girders for ROB no 439 A and 423A of RVNL Sambalpur Titlagarh Project M/s Rahee Infratech Ltd Dr. S R Dash SIF 1.15 2 weeks 05.04.2017 CP103 Completed
102 Vetting/ Proof checking of refrigeration for 3000 MT and 5000 MT Engineering Projects (India) Ltd Prof. S K Mahapatra SMS 3.59 2 weeks 06.04.2017 CP102 Completed
101 Strategies to counter energy imbalances in an aluminium reduction cell with an insert in the cathode collector bar Tata International Ltd Dr. Randhir Singh SMMME 1.27 6 months 22.03.2017 CP101 Completed
100 Proof Checking of Structural Items of Rambili Project Suvadra Consultant Dr. S R Dash SIF 14.95   18.03.2017 CP100 Completed
99 Vetting of second floor structure of CESU building for additional load IDCO Dr. B Hanumantha Rao SIF 1.87 2 Months 06.03.2017 CP099 Completed
98 Dyke hight raising of Fly-Ash pond Vedanta Ltd Dr. B Hanumantha Rao SIF 6.74 2 Months 08.02.2017 CP098 Completed
97 Characterisation of soils treated with Zydex products for its use in PMGSY Roads Zydex Industries (P) Ltd Dr. U C Sahoo SIF 2.30 2 Months 01.03.2017 CP097 On-going
96 Mix Design for WMM & GSB with optimum utilisation of granulated slag Tata Steel Ltd Dr. U C sahoo SIF 1.15 1 Week 09.02.2017 CP096 Completed
95 Accretion control to increase the sponge iron production to the target annual capacity of 390000 Mt Tata Sponge Iron Ltd Prof. Brahma Deo SMMME 26.56 1.5 Year 15.03.2017 CP095 Completed
94 Proof checking of major bridge @ Ch 1+445 of NH-149 pallahara to Pitiri Section, Odisha RKD Construction (P) Ltd Dr. S R Dash SIF 1.73 1 month 26.01.2017 CP094 Completed
93 Review of science hopper lab in the class program - Physics Science Hopper Education (P) Ltd., Bangalore Dr. S Chatterjee SBS 0.67 3 month 20.01.2017 CP093 Completed
92 Vetting of design and drawings of aranya bhavan 6th floor conference room IDCO Dr. B Hanumantha Rao SIF 1.50 2 week 02.01.2017 CP092 Completed
91 Structural stability for the building with revised loading conditions of 2nd floor level with its retrofitting actions NBCC (I) Ltd. Dr. Sumanta Haldar SIF 8.00 3 month 09.01.2017 CP091 Completed
90 Vetting of the AFS Hanger at Bagdogra, super structure drawing (Steel Structure) M/s MES Engineering, Kolkata Dr. Goutam Mondal SIF 1.75 1 month 30.01.2017 CP090 Completed
89 Third party audit on the fly ash generation & utilization by TPPs in Odisha for the year 2015-16 M/s State Pollution control Board Dr. B Hanumantha Rao SIF 2.59 2 week 17.02.2017 CP089 Completed
88 Proof Checking of Design Splice & its adequacy by M/s S M Consultancy for 30m FOB girder Rail Vihar Nigam Ltd. Waltair Dr. S R Dash SIF 0.41 2 week 09.01.2017 CP088 Completed
87 Monitoring and quality assurance of construction of international standard sport climbing wall at kalinga stadium, BBSR Outdoor School Dr. Sumanta Haldar SIF 7.10 3 months 09.01.2017 CP087 Completed
86 Proof checking of design and drawing of substructure for 16 nos of major bridges of RVNL Rail Vihar Nigam Ltd. BBSR Dr. S R Dash SIF 11.00 6 months 09.01.2017 CP086 Completed
85 Testing pf CC cores of RE Facia Panel NHAI, PIU-BBSR Dr. U C Sahoo SIF 1.73 1 week 02.01.2017 CP085 Completed
84 Safety consultancy for construction of new road at the missing link portion of NH81 along the approved alignment between Harischandrapur and eastern approach of kalindri - bridge from Km 46.550 to km59.697 in the district of Malda, West Bengal on EPC mode Dynamic Projects (P) Ltd Dr. P P Dey SIF 2.30 1 year 21.12.2016 CP084 Completed
83 Proof checking of design and drawings of substructure for 6 nos of major bridges of RVNL Rail Vikas Nigam Ltd Dr. S R Dash SIF 2.16 1.5 month 15.11.2016 CP083 Completed
82 Quality test of Railway track stone (Gudiakateni & Chandikhol) Jyoti Construction Dr. U C sahoo SIF 0.30 1 week 22.11.2016 CP082 Completed
81 Development of structural grade concretes utilizing Iron slag as sand replacements (Tata Steel, Jaipur, Odisah) Tata Steel, Kalinga Nagar Dr. Dinaka Pasla SIF 5.74 3 month 21.10.2016 CP081 Completed
80 Proof checking of design and drawing of substructure and foundation abutment-2 of bridge no -76 Rail Vikas Nigam Ltd Dr. S R Dash SIF 0.86 2 weeks 17.10.2016 CP080 Completed
79 Vetting of Structural design and drawing of the Dinjan Hanger foundation LLOYD Insulations Ltd Dr. Goutam Mondal SIF 0.30 1 month 21.06.2016 CP079 Completed
78 Analysis and Implementation of non chronological video synopsis and indexing Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES 15.00 1 year 04.10.2016 CP078 Completed
77 Technical support on pile design in L iquefiable soils for the building at the Sewage Treatment Plant (Tunasan STP) Vatech Wabag Ltd Dr. S R Dash SIF 2.88 2 weeks 26.09.2016 CP077 Completed
76 Proof checking of structural calculation/ drawing for proposed construction of JNV/ Nayagarh (Phase-B) works at Odisha Buildsol, Architectural & Engineering Consultants Dr. S R Dash SIF 0.65 2 weeks 17.09.2016 CP076 Completed
75 Widening and strengthening of Khunti-Torpa-Kolebira Road (from 0.00 km to 82.055 km) to 2-lane with paved shoulder to work as safety consultancy Gawar-S.C.C. (JV), Rahtak, Haryana Dr. Partha Pratim Dey SIF 3.52 1.6 year 09.09.2016 CP075 Completed
74 Mix design for glass fibre reinforced concrete for IMDC Mancheswar, Bhubaneswar NBCC, Bhubaneswar Dr. Dinakar Pasla SIF 1.64 3 month 17.08.2016 CP074 Completed
73 Vetting of feasibility study of pre-treatment of coke oven and by-product plant effluent in coal gasification process units for recovery of Phenol and Ammonia Jindal Steel and Power Limited Dr. P Bhunia SIF 5.75 1.5 month 11.08.2016 CP073 Completed
72 Proof checking of design and drawing of road under bridge (RUB) No-68 of RVNL Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash SIF 0.36 1 month 09.08.2016 CP072 Completed
71 Widening and strengthening from km 94.000 to 131.000 of NH-133 in the state of Jharkhand through EPC Basis contract as safety consultant Gawar-S.C.C. (JV), Rahtak, Haryana Dr. P P Dey SIF 1.59 1 year 01.05.2016 CP071 Completed
70 Mix Design for M25 for Mahanadi Institute of medical sciences and research at Talcher , Angul, Odisha NBCC, Talcher Dr. Dinakar Pasla SIF 3.11 3 month 27.07.2016 CP070 Completed
69 Study of Probabilities and changes in frequencies and intensities of tropical cyclones and associated wind and rainfall over Puri district of Odisha in climate change projection [Period: 1891-2015] Institute for Social and Environmental Transition-International (ISET-I) Prof. U C Mohanty SEOCS 4.02 3 month 28.07.2016 CP069 Completed
68 Mix Design of M30 Grade Concrete for ITC Hotel Prime Techno Engineers (P) Ltd. Dr. Dinakar Pasla SIF 0.45 1 month 02.07.2016 CP068 Completed
67 Endorsement of the estimation of production quantities of sponge iron and steel billets of Maa Mahamaya Industries Ltd, R.G. Peta in the years 2006-07, 2007-08 and 2008-09 from the charge mix used Maa Mahamaya Industries Ltd Dr. V Panduranga SMS 1.20 1 Week 07.07.2016 CP067 Completed
66 Proof checking of design and drawing for 2 nos of S&T Cabin building for M/S NTPC at Kaniha RITES Ltd Dr. S R Dash SIF 0.72 2 week 17.06.2016 CP066 Completed
65 Proof checking of design and drawing of substructure for major bridges no 115 and 131 Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash SIF 1.15 1 month 21.06.2016 CP065 Completed
64 Technical and function test of Gagan enabled GPS PDAs Conservator for Forest, GIS, Aranya Bhawan Dr. P R Sahu SES 1.95 1.5 month 10.05.2015 CP064 Completed
63 Video analysis algorithms to detect unusual behaviour in crowd and traffic outdu Media Tech Pvt. Ltd. Dr. Debi Prosad Dogra SES 6.52 3 months 15.06.2016 CP063 Completed
62 Design and developing a portable wireless noise level and vibration monitors Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan SES 1.04 3 months 15.05.2016 CP062 Completed
61 Design and developing a portable wireless air quality monitor Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan SES 2.44 3 month 15.05.2016 CP061 Completed
60 Testing of Panels for energy absoption test ILFS SIF Dr. Dinakar Pasla SIF 2.86 1 month 23.05.2016 CP060 Completed
59 Inspection of quality control laboratory Maa Mahamaya Industries Ltd Dr. V Panduranga SMS 1.19 1 week 06.05.2016 CP059 Completed
58 Implementation of water quality monitoring and management system Pentagon Rugged Systems India (P) Ltd Dr. Sabarimalai Manikandan SES 1.49 2 months 15.04.2016 CP058 Completed
57 Testing of light weight aggregates (LWAs) in various concrete grades and the physical and chemical testing of the aggregates and also the structural load behaviour of the LWA concretes Jindal Steel and Power Limited Dr. Dinakar Pasla SIF 5.64 3 months 12.05.2016 CP057 Completed
56 Proof Checkin of Design and Drawing of Substructure of Railway Bridge of RVNL Rail Vikas Nigam Ltd, Rail Vihar Dr. S R Dash SIF 0.86 1 week 08.04.2016 CP056 Completed
55 Vetting of structure and superstructure of sports climbing facility at Kalinga Stadium confirming to IFSC standard Outdoor School Dr. Sumanta Haldar SIF 4.09 3 months 10.03.2016 CP055 Completed
54 Stability study of the ash filled area Vedanta Limited Dr. B Hanumantha Rao SIF 3.14 1 year 10.03.16 CP054 Completed
53 C/C++ implementation with adequate GUI for sparsity based abnormal event detection Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES 7.00 6 months 10.02.2016 CP053 Completed
52 C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet process Indo Korea Science and Technology Center, Bangalore Dr. Debi Prosad Dogra SES 8.00 6 months 10.02.2016 CP052 Completed
51 Design and Drawing for Katekela Lagoon-2 ash pond Vedanta Limited Dr. B Hanumantha Rao SIF 8.19 1 Year   CP051 Completed
50 Strenghthening and Widening/ Reconstruction of Dumka Masalia-Nala upto West Bengal Border Road lane with paved shoulder under EPC Mode (55 km) Barbrik_RCPL(JV) Dr. Partha Pratim Dey SIF 2.36 1year   CP050 On-going
49 Design of experimental road using fly ash Sesa Sterlite Limited Dr. B Hanumantha Rao SIF 3.08 2 months   CP049 Completed
48 Technical Evaluation of cement concrete roads in Odisha Planning & Coordination Dept., Govt. of Odisha Dr. U C sahoo SIF 28.16 8 months 30.10.2015 CP048 Completed
47 Technical Scrutiny of irrigation road proposal under IRC & IS Water Reseources Dept., Govt. of Odisha Dr. U C sahoo SIF 4.26 3 month 13.11.2015 CP047 Completed
46 Vetting of schematic drawing along with transmission loss calculation for 6.6KV/ 415V OHDC line Megha Engineering & SIF Ltd. Dr. S B Karanki SES 0.33 2 weeks 30.09.2015 CP046 Completed
45 Modelling of the Cathode assembly in Aluminium reduction cell Tata International Ltd Dr. Randhir Singh SMMME 0.74 3 month 16.09.2015 CP045 Completed
44 Preparation of DPR for the proposed National Institute for New Energy & Innovation at Bhubaneswar Ministry of New Renewable Energy, Govt. of India Dr. N C Sahoo SES 5.00   14.10.2015 CP044 On-going
43 Improvement and upgradation of two lane with paved shoulder configurationof Koderma-Domchanch-Khorimahua-Jamua Road (SH-13) under EPC mode in Jharkhand NIT Durgapur Dr. P P Dey SIF 2.00 2 year 27.07.2015 CP043 Completed
42 Conducting Mix Design for M50 for NBCC Bhubaneswar NBCC Ltd Dr. Dinakar Pasla SIF 1.33 3 month 11.07.2015 CP042 Completed
41 Geotechnical investigations on soil/rock samples NBCC Ltd Dr. B Hanumantha Rao SIF 1.20 1 week 24.06.2015 CP041 Completed
40 Process optimization studies on leaching of high ash coal to produce low ash coal Tata Steel Ltd Prof. N P H Padmanabhan SMMME 6.75 7 month 15.05.2015 CP040 Completed
39 Survey on process study of CPC and EPC of Amritesh Industries Pvt. Ltd, Angul Amritesh Industries Pvt. Ltd. Dr. Akhilesh Barve SMS 0.40 1 Week 24.06.2015 CP039 Completed
38 Testing of Ballast from Baghua Querry Maa Chandi Stone Crushing Dr. S R Dash SIF 0.17 1 week 05.06.2015 CP038 Completed
37 Surge analysis for 1000mm Dia water rising main at Jajpur IDCO Dr. Arindam Sarkar SIF 1.90 1 month 27.05.2015 CP037 Completed
36 Proof checking of srtructural design nad drawing Hindustan steel works construction Ltd. Dr. S R Dash SIF 0.43 2 weeks 12.05.2015 CP036 Completed
35 Survey of capacity assessment of Amritesh Industries Pvt. Ltd. Amritesh Industries Pvt. Ltd. Dr. V Panduranga SMS 0.27 1 week 06.05.2015 CP035 Completed
34 Design and analysis for making rural road about 1 km by using JK Paper Mills fly ash JK Papers Mills Limited Dr. B Hanumantha Rao SIF 2.85 1.5 month 20.04.2015 CP034 Completed
33 Assessment of structural safety of construction of balance six floor of the IDCOL corporate office building, BBSR IDCO Dr. Sumanta Haldar SIF 12.64 3 month 09.04.2015 CP033 Completed
32 Testing of materials and conducting design mix M-25,M-30 & M-40 in connection with construction of commercial cum residential complex National Building construction corporation Ltd. Dr. P Bhunia SIF 4.38   09.04.2015 CP032 Completed
31 Report on Dolomite and its usage in sponge Iron production Ganesh Sponge (P) Ltd. Dr. Soobhankar Pati SMMME 0.30 1 day 17.03.2015 CP031 Completed
30 Opinion regarding the dri reduction furnace at JSPL plant Angul Kazstroy Services SIF Pvt. Ltd Dr. Dinakar Pasla SIF 2.81 3 month 18.03.2015 CP030 Completed
29 Assessing the soil for earth work construction IVRCL Limited Dr. B Hanumantha Rao SIF 0.53 1 Week 12.03.2015 CP029 Completed
28 Testing of AAC Blocks Overtop marketing (P) Ltd. Dr. Dinakar Pasla SIF 3.07 2 month 12.03.2015 CP028 Completed
27 Testing of AAC Blocks Fast Build Blocks Pvt. Ltd Dr. Dinakar Pasla SIF 0.77 2 month 13.03.2015 CP027 Completed
26 Vetting/checking of the project report prepared by CEMCPL for Ordnance Factory, Ambajhari, Nagpur Centre for Envotech and Management Consultancy (P) Ltd Dr. R R Dash SIF 1.40 1 month 30.01.2015 CP026 Completed
25 Robotic application in boiler NDT assessment OMS Power Training and research Institute Dr. V Pandu Ranga SMS 3.29 2 months 07.01.2015 CP025 Completed
24 Testing of Fibre shorcrete panels for energy absorption test Leighton India Contractors (P) Ltd Dr. Dinakar Pasla SIF 4.68 3 months 04.12.2014 CP024 Completed
23 Design and stability analysis of an embankment for new BG rail line from Haridaspur to Paradeep in the Khurda district Odisha Tracks & Tower Infratech (P) Ltd Dr. Hanumatha Rao SIF 3.65 1 month 02.12.2014 CP023 Completed
22 Testing of Fibre shorcrete panels for energy absorption test Leighton India Contractors (P) Ltd Dr. Dinakar Pasla SIF 5.26 3 months 06.11.2014 CP022 Completed
21 Issue of Check Proof Certificate and Procedure for the rectification of FOB along with necessary drawing regarding McML-ECI(JV) Dr. S R Dash SIF 1.26 2 Weeks 16.09.2014 CP021 Completed
20 Assessment of High Compressibility of cut spoil Tracks & Tower Infratech (P) Ltd Dr. B Hanumantha Rao SIF 1.26 1 month 16.09.2014 CP020 Completed
19 Widening & Strengthening of Bhawanipatna-Gunupur-Kasipur Road (SH-44) to 2 Lane without paved shoulder from Km 0/000 to 13/000 & Km 42/940 to Km 48/840 on EPC mode in the district of Kalahandi Office of the Executive Engineer Koraput (R&B) Division Dr. B Hanumantha Rao SIF 0.50 1 month 12.09.2014 CP019 Completed
18 Vetting of structural Design and Drawing for the Construction of L.I.G and L.M.I.G housing Complex along with Commercial Complex at Kalinga Nagar Zone- K4 BDA Dr. S R Dash SIF - -   CP018 Cancelled
17 Impact Assessment study of city bus services operational under JnNURM Housing and Urban Development Department, Govt of Odisha Dr. Debasis Basu SIF 6.98 4 month 13.08.2014 CP017 Completed
16 Proof Checking of POT cum PTFE Bearing Bhubaneswar Expressways Pvt. Ltd Dr. Dinakar Pasla SIF 1.01 1 month 30.07.2014 CP016 Completed
15 Co-operation and expert advice for improvement of short and extended range (monthly scale) prediction of rainfall in the tropics RIMES Prof. U C Mohanty SEOCS 10.00 1 Year 18.06.2014 CP015 Completed
14 Design and testing aerated autoclaved fly concrete blocks (AAC) Fast Build Blocks Pvt. Ltd Dr. Dinakar Pasla SIF 1.18 1 month 10.05.2014 CP014 Completed
13 Consultancy for investigation in ARC, Charbatia Airports Authority of India, Biju Pattanaik Airport Dr. Dinakar Pasla SIF 13.49 3 month 16.05.2013 CP013 Completed
12 Proof checking of design and drawing of three no. box bridges under Railway loading in connection with construction of railway siding to serve Koderma Thermal Power Plant (2x500MW) of DVC RITES Ltd Dr S C Dutta SIF 3.79 3 month 14.11.2012 CP012 Completed
11 Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and odisha NRRDA Dr. U C Sahoo SIF 42.72   30.08.2012 CP011 On-going
10 Design of weighbridge & moveable floor crane DS Systems Dr. S N Panigrahi SMS 1.16 10 months 14.06.2012 CP010 Completed
9 Design of two number of 220KV transmission line tower foundations between Kantapalli to Hindalco in the mahanadi river Hindalco
Industries Ltd.
Dr. Arindam Sarkar SIF 7.18 8 months 11.04.2012 CP009 Completed
8 House hold energy consumption survey-2012 WMG Dr. S R Samantaray SES 1.20 1 Year 24.03.2012 CP008 Completed
7 Proof Checking of design of pile foundations for location no. 16A and 24 of 220 KV transmission line tower from Bidanasi ( Cuttack) near the bank of Kathajodi to Nuapada (Cuttack) in the spill zone Orissa Power
Transmission
Corporation Limited
Dr. Sumanta Haldar SIF 2.27 1 month 19.10.2011 CP007 Completed
6 Vetting of structural analysis of design and drawing for the new residential complex at HAL Koraput HAL Prof. S C Dutta SIF 5.00 1 month 18.10.2011 CP006 Completed
5 Proof Checking of design of river bed pile foundation for location no. 10,12 & 15 of 220KV transmission line from Bidanasi to Cuttack grid substation Orissa Power
Transmission
Corporation Limited
Dr. Sumanta Haldar SIF 3.31 1 month 31.05.2011 CP005 Completed
4 Preparation of special Foundation for 220KV Tower for Two locations(158-c & 159) Hindalco
Industries Ltd.
Dr. Arindam Sarkar SIF 4.84 1 month 06.05.2011 CP004 Completed
3 Proof Checking od 3 Nos panel cabin building and 1 no. gate lodge/IBS Building for M/s. Nalco Angul RITES Ltd Dr. Dinakar Pasla SIF 0.60 3 months 11.10.2010 CP003 Completed
2 Remedial Measures for Horizontal and vertical
Cracks Developed in the walls, floors, roof etc of ESI Hospital, Jaykaypur
ESI Corporation Dr. Dinakar Pasla SIF 3.95 3 months 06.09.2010 CP002 Completed
1 Vetting of the design of lighting masts and their foundations in connections with commissioning of lighting systems of wankahade stadium Bajaj Electricals Ltd. Prof. S.C. Dutta SIF 1.10 1 month 17.09.2009 CP001 Completed