Consultancy Project

Sl.No Title Consulting Agencies PI of Project School  Value of Project
Rs. in Lakhs 
 Duration of the project  Start Date End Date Code Status
578Peer review of structural design for trident vasa project at Kalinga Nagar, BhubaneswarTRIDENT PROPERTIES PRIVATE LIMITEDDr. B Hanumantha RaoSIF12.61One Year3-Jan-242-Jan-25CP578On-going
577Vetting of structural design and drawings of BFP related reinforced concrete buildings located at BerhampurShiv Construction Co.Dr. Jothi Saravanan ThiyagarajanSIF1.30One Months6-Jan-245-Feb-24CP577On-going
576Vetting of Hydraulic and structural design for execution of rural piped water supply project pertaining to 149 villages of Tangi-Chowdar block of Cuttack district.BHUGAN INFRACON PRIVATE LIMITEDDr. Arindam SarkarSIF7.01One Year4-Jan-243-Jan-25CP576On-going
575Vetting of civil structural documents, electrical process, mechanical and instrumentation design and drawing of 3 Nos Individual Rural Piped water supply projects pertaining to Koraput and Navarangapur DistrictsLarsen and Toubro - Infrastructure VerticalDr. Srinivas Bhaskar KarankiSES27.44Six Months6-Jan-245-Jul-24CP575On-going
574Vetting of traffic density study for Environmental clearance of proposed Enhancement in iron ore production from Sandspur Iron & Manganese Mines of M/s National Enterprises At: Village-Sanindpur, Tehsil-Koida, Dist Sundargarh, OdishaCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITEDProf. Rajesh Roshan DashSIF0.77Ten Days23-Nov-233-Dec-23CP574On-going
573Vetting of traffic density study for Environmental clearance of proposed M/s Utkal Health Care Private Limited Plot No.C/3 Niladri Vihar, Chandrasekharpur, Bhubaneswar OdishaCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITEDProf. Rajesh Roshan DashSIF0.77Ten Days21-Dec-2331-Dec-23CP573On-going
572Vetting of Nallah Diversion Plan for Kuraloi-A North Coal Mines of M/s Vedanta Ltd (Volume-1) prepared by CEMC Pvt Ltd, BhubaneswarCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED,Prof. Rajesh Roshan DashSIF0.94One Month19-Dec-2318-Jan-24CP572On-going
571Vetting of project report for amendment of Environmental clearance of M/s XIM UniversityCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITEDProf. Rajesh Roshan DashSIF0.77Two Weeks9-Nov-2323-Nov-23CP571On-going
570Vetting of Design of Automatic Wheel WashGLOBALTECH ENVIRO EXPERTS PRIVATE LIMITEDProf. Rajesh Roshan DashSIF1.00One Month28-Dec-2327-Jan-24CP570On-going
569Mix design verification for construction of statue at VaranasiM/s MATU RAM ART CENTRES PRIVATE LIMITEDProf. Dinakar PaslaSIF2.36One Month29-Dec-2328-Jan-24CP569On-going
568Proof checking of one minor bridge at Kusmunda open cast of Kusmunda area, Korba (CG)RITES LTDProf. S K PandaSIF0.94One Month4-Oct-233-Nov-23CP568On-going
567Testing of concrete core samples for two major bridges at NaupadaEXECUTIVE ENGINEER R&B DIVISION KHARIARProf. Dinakar PaslaSIF1.18One Months11-Dec-2310-Jan-24CP567On-going
566Fragility of different types of offshore wind turbines in seismic conditionsRenew RiskProf. Sumanta HaldarSIF3.68One Month22-Dec-2321-Jan-23CP566On-going
565Vetting & proof checking of Structural Drawings & design of 1 00 seater Boys Hostel at six locations in the district of Angul, Staff quarters for REB Sub Division Rairakhol, Sambalpur and Pabitra mohan Smrutipitha at Palhara, AngulM/S NBSP CONSULTANTS PRIVATE LIMITEDProf. Sarat Kumar PandaSIF3.54Six Months26-Dec-2325-Jun-24CP565On-going
564Power factor improvement studyPARADEEP PHOSPHATES LTD.Prof. C.N.BhendeSES7.67Four Months15-Dec-2314-Apr-24CP564On-going
563Vetting of electrical and E&M designs and drawings pertaining to the Jajpur DistrictKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. Srinivas Bhaskar KarankiSES3.39Six Months18-Dec-2317-Jun-24CP563On-going
562Vetting of electrical and E&M designs and drawings pertaining to the Angul DistrictKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. Srinivas Bhaskar KarankiSES3.69Six Months1-Nov-2330-Apr-24CP562On-going
561Vetting of electrical and E&M designs and drawings pertaining to the Nayagarh DistrictKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. Srinivas Bhaskar KarankiSES3.54Six Months10-Nov-239-May-24CP561On-going
560Vetting of structural design and drawings for sliding gate for 40 mtrs lengthPrasur Electricals and Engineering Co.Prof. S K PandaSIF1.18Three Months14-Dec-2313-Mar-24CP560On-going
559Vetting of Structural design and drawing of construction for LCSS Building of MSP Plant at IREI, Matikhalo, Chatarapur, Ganjam, OdishaINSTRUMENT & CONTROLProf. S K PandaSIF1.00Three Months15-Dec-2314-Mar-23CP559On-going
558Establishment off Chair Professor in Cyber SecurityWHIZHACK TECHNOLOGIES PRIVATE LIMITEDHoS SESSES23.36Three Years18-Nov-2317-Nov-26CP558On-going
557Audit of ash disposal and utilization of NAVA LimitedM/S.NAVA LIMITEDDr. B Hanumantha RaoSIF1.11Two Weeks12-Dec-2326-Dec-23CP557On-going
556Audit of ash disposal and utilization of IMFA LimitedM/S. INDIAN METALS & FERRO ALLOYS LIMITEDDr. B Hanumantha RaoSIF1.11Three Months4-Dec-233-Mar-24CP556On-going
555Testing of filter bed sand materialKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. B Hanumantha RaoSIF1.59Six Months9-Oct-238-Apr-23CP555On-going
554Mix design for ovehead tankSJK Engineering ServicesProf. Dinakar PaslaSIF0.80Two Months7-Nov-236-Jan-24CP554On-going
553Design check of VUP for four laning of NH6 in Odisha, SambalpurALAM CONSTRUCTIONSProf. Sumanta HaldarSIF4.72One Month5-Dec-231-Apr-24CP553On-going
552Proof checking of stuructural design of DDM (Deputy Director of Mines) office and laboratory at 04 sites for Odisha Mining Corporation (OMC)CREATIVE ARCHITECTS COMBINE PRIVATE LIMITEDProf. S K PandaSIF2.36Six Months5-Dec-234-May-23CP552On-going
551Mix design and Bridge design vetting for Vedanta Ltd LanjigarhMAHAVIR ENGINEERINGProf. Dinakar PaslaSIF1.77One Month23-Nov-2323-Dec-23CP551Completed
550Proof checking design and drawings of minor bridges, box culverts and hume pipe culvertsM/S KEC INTERNATIONAL LTD.Dr. Jothi Saravanan ThiyagarajanSIF6.58Two Months12-Dec-2311-Feb-24CP550On-going
549Checking of design of process tower and boiler chimney at Somnathpur Industrial area, BalasoreIFB AGRO INDUSTRIES LIMITEDProf. Sumanta HaldarSIF5.90One Month1-Dec-2331-Dec-23CP549On-going
548Structural Audit of minor bridges and LVUP for development of six lane Badakumari-Karki section from km 204+000 to km 226+500MEHROTRA BUILDCON PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF2.66One Months1-Dec-2331-Dec-23CP548On-going
547Audit of ash disposal and utilization of Jindal Steel & Power LimitedJINDAL STEEL & POWER LTDDr. B Hanumantha RaoSIF1.11Six Months1-Dec-2331-May-24CP547On-going
546Structural health assessment of existing 4 Lane Panikoili-Rimuli section of NH-215 (New NH-20) in OdishaPROJECT DIRECTOR PROJECT IMPLEMENTATION UNIT KEONJHARDr. Jothi Saravanan ThiyagarajanSIF7.38One Months29-Nov-2328-Dec-23CP546Completed
545Proof checking of structural design and drawings for Factory Building at Greater Noida, Science Centre at Kota and Karbi Bhawan, at Dwarka, New Delhi M/S SURYA FRESH FOODS LTD.Prof. S K PandaSIF3.54Three Months24-Nov-2323-Feb-24CP545On-going
544Proof checkingg of structural design and drawings for BDL JhansiVASTUNIDHI (PROP. ANIL BANSAL)Prof. S K PandaSIF2.95Three Months28-Nov-2327-Feb-24CP544On-going
543Groundwater and soil sample analysisFINANCE & ACCOUNTS DEPT A M U ALIGARHDr. Syed Hilal FarooqSIF2.99Three Months29-Nov-2329-Feb-24CP543On-going
542Rut Test for BC-2 Grade HMA with CRMB 60 DCC INFRA PROJECTS LIMITEDDr. Anush K ChandrappaSIF1.18One Months29-Nov-2328-Dec-23CP542On-going
541Proof checking of design and drawings of Multi Story office building for Chennai Customs Audit & Chennai Import CommissionerateSRI BALAJI CONSTRUCTIONSDr. Jothi Saravanan ThiyagarajanSIF5.50Two Months30-Nov-2331-Jan-24CP541On-going
540Proof checking of Design and Drawings of Box culverts, Minor bridges, Flyovers and Light vehicular underpassess for NH-57, OdishaMS INFRA ENGINEERS PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF12.98Two Months29-Nov-2328-Jan-24CP540On-going
539Vetting of structural design and drawings for construction of Bypass to Nayagarh town from km 235.469 to km 252.48 of NH-57 in the State of Odisha on EPC mode.ROTRANS INFRA PROJECTS PRIVATE LIMITEDProf. S K PandaSBS1.48One Month20-Nov-2319-Dec-23CP539On-going
538Assessing the degradable matter from polypropylene and evaluating cylo toxicity of degradable matter.RAREAN FLUID-TECH PRIVATE LIMITEDProf. Umaprasana OjhaSBS4.78One Year23-Nov-2322-Nov-24CP538On-going
537Assessment of quality of some Indian coalsEASTERN COALFIELDS LTDDr. Remya NeelancherrySIF2.42Two Weeks21-Nov-235-Dec-23CP537On-going
536Determination of physical characterstics of filter media for water supply projects in OdishaM/s GVPR ENGINEERS LIMITEDProf. Sumanta HaldarSIF1.65Two Weeks7-Nov-2321-Nov-23CP536On-going
535Proof checking of strengthening of PSC girders between CTC-BRAG upRAIL VIKAS NIGAM LIMITEDProf. Dinakar PaslaSIF2.95Three Months3-Nov-232-Feb-24CP535On-going
534Vetting of report on Traffic analysis and pavement design report (R1)M/S BEKEM INFRA PROJECTS PVT LTDDr. B Hanumantha RaoSIF1.77Four Months14-Nov-2313-Feb-24CP534On-going
533Proof checking of Design and Drawings of Sub structure and Foundations of rail bridge having span of 6x45.7m Steel Girder over Bheden RiverRITES Ltd (Bhubaneswar)Dr. Jothi Saravanan ThiyagarajanSIF7.38One Months17-Nov-2316-Dec-23CP533On-going
532Proof checking of general arrangement drawings and structural design of solar water pump structuresM/S S. PallaviDr. Jothi Saravanan ThiyagarajanSIF1.15One Month18-Nov-2317-Dec-23CP532Completed
531Proof checking of Design and Drawing of pier and Pile foundation for pier P8 and P9 for ROB (1x 24.0m) over existing railway lines near Kirandul yard for NMDC Ltd.RITES Ltd (Bhubaneswar)Dr. Suresh R DashSIF2.95Four Months8-Nov-237-Mar-24CP531On-going
530Geotechnical testing of soil samplesM/S KUMAR CREATIONS PVT LTDDr. B Hanumantha RaoSIF0.18One Year5-Apr-234-Apr-24CP530On-going
529Geotechnical testing of soil samplesM.S.ENTERPRISEDr. B Hanumantha RaoSIF0.22One Year1-Aug-2331-Jul-24CP529On-going
528Geotechnical testing of 5 numbers of soil samplesANS CONSTRUCTIONS PRIVATE LIMITEDDr. B Hanumantha RaoSIF0.44One Year20-Apr-2319-Apr-24CP528On-going
527Proof checking of General Arrangement Drawings of Pre-Engineered Building for Amabale Industrial and Logistics ParksM/S INTERARCH BUILDING PROD.PVT.LTD.Dr. Jothi Saravanan ThiyagarajanSIF1.46Three Weeks30-Oct-2320-Nov-23CP527Completed
526Proof checking of General Arrangement Drawings of Pre-Engineered building for Maval Industrial and Logistic ParkM/S INTERARCH BUILDING PROD.PVT.LTD.Dr. Jothi Saravanan ThiyagarajanSIF1.42Three Weeks30-Oct-2320-Nov-23CP526Completed
525Proof checking of General Arrangement Drawings of Pre-engineered Building for RAR Infra & Retail LLPM/S INTERARCH BUILDING PROD.PVT.LTD.Dr. Jothi Saravanan ThiyagarajanSIF1.45Three Weeks30-Oct-2320-Nov-23CP525Completed
524Materials for improvement of minig operations (Hqdroqels and nano composites)INNOCULE MATERIALS AND ADDITIVES PRIVATE LIMITEDDr. Umaprasana OjhaSBS7.17One Year28-Oct-2327-Oct-24CP524On-going
523Peer review of Plant/non-plant buildingsTRACTEBEL ENGINEERING PVT LTDDr. Shantanu PatraSIF3.78Two Months25-Oct-2324-Dec-23CP523On-going
522Audit on compliance to ash generation and utilizationJINDAL INDIA THERMAL POWER LIMITEDDr. B Hanumantha RaoSIF1.11Four Months25-Oct-2324-Feb-24CP522On-going
521Feasibility of EOT crane for hangar at BhubaneswarGE (N&CG) BhubaneshwarProf. Sumanta HaldarSIF14.16Five Months10-Oct-239-Mar-24CP521On-going
520Inspection and testing of welding of steel plate girders at site (Patna, Bihar) and fabrication yard (Rewari, Haryana)SENIOR PROJECT ENGINEER, WORKS DIVISION PATNA-1, BIHAR RAJYA PUL NIRMAN NIGAM LTD.Prof. M M MahapatraSMS5.16Six Months25-Oct-2324-Apr-24CP520On-going
519Strutural audit of civil works for development of six lane Badakumari-Karki section of NH-130-CD road under Raipur-Viskhapatnam Economic CorridorUMSL LTDDr. Jothi Saravanan ThiyagarajanSIF2.66One Months25-Oct-2324-Nov-23CP519Completed
518Vetting of detailed basic engineering package, drawing including P&ID, layout of packaged plants.GRACE GREEN INFRA PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF1.36Three Weeks17-Oct-237-Nov-23CP518Completed
517Vetting of structural design and drawings for Construction of Bypass Road to Balangir town from Km 72.400 (Design Km 0.000) to Km 79.800 (Design Km 11.670) of NH-26 in the State of Odisha on EPC modeROTRANS INFRA PROJECTS PRIVATE LIMITEDProf. S K PandaSIF12.98One Month Three Weeks16-Oct-235-Dec-23CP517On-going
516Conducting a feasibility study on utilization of OB material of Kulda OCP for various Civil constuction purposesMAHANADI COALFIELDS LIMITED.Prof. Sumanta HaldarSIF35.55Three Month and Two Weeks6-Oct-2319-Jan-24CP516On-going
515Vetting of DPRs for Road Projects developed under BDAM/S SHREE JAGANNATH CONSULTANCYDr. U C SahooSIF1.77One Month5-Oct-234-Nov-23CP515Completed
514Proof checking of general arrangement drawings and structural design of ROB bearing chainage 87+482R&C INFRAENGINEERS PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF1.31One Month30-Sep-2330-Oct-23CP514Completed
513Design/quality analysis of constructed 04 nos double storied building at different places of subarnapur districtVIGILANCE DIRECTORATE ORISSA CUTTACKDr. Suresh R DashSIF4.47Two Weeks5-Oct-2319-Oct-23CP513On-going
512Vetting of distribution network pertaining to scheme to 30 GP of Kuchinda and Bamra block of Sambalpur districtM/S LASER POWER & INFRA PRIVATE LIMITEDDr. Arindam SarkarSIF5.50One Month29-Sep-2328-Oct-23CP512Completed
511Biostratigraphic and Sedimentological evaluation of Mahanadi basin using drilling recordsOIL INDIA LTDDr. Raj Kumar SinghSEOCS11.20Six Months11-Oct-2310-Apr-24CP511On-going
510Assessment of quality of some Indian coalsEASTERN COALFIELDS LTDDr. Remya NeelancherrySIF3.66Two Weeks28-Sep-2312-Oct-23CP510On-going
509Proof checking of general arrangement drawings of Pre-engineered building (Mahindra & Mahindra)M/S INTERARCH BUILDING PROD.PVT.LTD.Dr. Jothi Saravanan ThiyagarajanSIF3.69One Month20-Sep-2319-Oct-23CP509Completed
508Structure vetting for Mahadev Greens at Trisulia Cuttack the total built-up area 46,129 sqm (496350 sqft)MAHADEV GRIHA NIRMAN PRIVATE LIMITEDProf. S K PandaSIF11.81Two Months27-Sep-2326-Nov-23CP508On-going
507Proof checking of design and drawings of four lane ROB and its approaches in lieu of existing level crossing at kesinga in the state of OdishaRAJLAXMI CONSTRUCTIONS LIMITEDProf. S K PandaSIF5.90Two Months14-Sep-2313-Nov-23CP507On-going
506Proof checking of structural design and drawings of high-rise buildingSTALWART PROJECTS PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF7.08One Month27-Sep-2326-Oct-23CP506Completed
505Integration and analysis of advanced machine learning algorithms with LACOS codebaseINDO-KOREA SCIENCE AND TECHNOLOGY CENTERDr.Debi Prasad DograSES25.77One Year26-Sep-2325-Sep-24CP505On-going
504Mix design for construction of Technical buildings at Vizag for MESGOPAL TEKNOCON PRIVATE LIMITEDProf. Dinakar PaslaSIF1.18Two Months29-Aug-2328-Oct-23CP504Completed
503Structural vetting for Acreplex BhubaneswarACREPLEX REALTY PRIVATE LIMITEDProf. Dinakar PaslaSIF14.16Two Months29-Aug-2328-Oct-23CP503Completed
502Proof checking of new auction hall and commercial building for Paradip fishing harborINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh PuneraSIF5.90One Month1-Sep-2330-Sep-23CP502On-going
501Vetting of the technical report on carrying out hill protection work near type-VE quarters at Mandala, Anushaktinagar, MumbaiGABION TECHNOLOGIES INDIA PRIVATE LIMITEDDr. B Hanumantha RaoSIF1.11Six Months15-Sep-2314-Mar-24CP501On-going
500Verification of elevated service reservoir on precast basis for execution of 2 nos of individual rural pipe water suply projectM/S KEC INTERNATIONAL LTD.Prof. Sumanta HaldarSIF1.18Three Weeks7-Sep-2330-Sep-23CP500On-going
499Bituminous Mix Designs for Resurfacing of Runway at Biju Patnaik Int. Airport, BhubaneswarJKG INFRATECH PRIVATE LIMITEDDr. U C SahooSIF4.78Two Months12-Sep-2311-Nov-23CP499On-going
498Development of foundation design and drawings for 220kv & 440kv towers in wind zone VIM/s ODISHA POWER TRANSMISSION CORPORATION LTDProf. Sumanta HaldarSIF10.00Five Months13-Sep-2312-Feb-24CP498On-going
497Traffic Studies on PWD Roads in OdishaEXECUTIVE ENGINEER PROJECT IMPLEMENTATION UNIT OSRPDr. Umesh C SahooSIF230.10Seven Months5-Sep-234-Apr-24CP497On-going
496Job Mix Formula (JMF) for Full Depth Reclamation (FDR) of PMGSY Roads in Jharkhand Misc PIUsChief Engineer, JSRRDA, Jharkhand, RanchiDr U C SahooSIF11.80Six Months11-Aug-2310-Feb-24CP496On-going
495Proof checking of structural design and drawings for 'Construction of new Campus for Indian Institute of Foreign Trade (IIFT) at Kakinada, Andhra PrasdeshD.K. & ASSOCIATESProf. S K PandaSIF3.54Two Months2-Sep-231-Nov-23CP495Completed
494Proof check of bridge works at LajkuraINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh PuneraSIF1.77One Month31-Aug-2330-Sep-23CP494On-going
493Proof check of bridge works of SECLINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh PuneraSIF2.36Seven Weeks31-Aug-2319-Oct-23CP493On-going
492Site visit and suggestion for bank slope failure at 147 km to 149 km of TGRL-TKMA doubling projectRAIL VIKAS NIGAM LIMITEDDr. Santoshkumar GSIF0.71Two Weeks14-Aug-2328-Aug-23CP492Completed
491Vetting and proof checking of structural drawings and design of District Audit Office at AngulM/S NBSP CONSULTANTS PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF0.94Three Weeks31-Aug-2321-Sep-23CP491Completed
490Vetting of propoed pipeline alignment and placement of valves with regards to water hammer effect, surge protection analysisM/S ORISSA INDUSTRIAL INFRACTURE DEVELOPMENT CORPORATIONDr. Arindam SarkarSIF4.85One Month30-Aug-2329-Sep-23CP490Completed
489Vetting and proof checking of structural drawings and design of HFL bridgesM/S SHIV SHAKTI ENGINEERING WORKS.Dr. Jothi Saravanan ThiyagarajanSIF4.01One Month25-Aug-2324-Sep-23CP489Completed
488Proof checking of structural design and drawings of structure with built area 7504 sqmM/S VICTOR COMPONENT SYSTEMS PLTDProf. S K PandaSIF1.23Two Months18-Aug-2317-Oct-23CP488Completed
487Proof checking of desing and drawings of civil structures pertaining to Bari & Korei Block of Jajpur DistrictKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. Jothi Saravanan ThiyagarajanSIF17.26Six Months22-Aug-2321-Nov-23CP487On-going
486Proof checking of desing and drawings of civil structures pertaining to Gania, Dasapala and Nuagaon Block in Nayagarh DistrictKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. Jothi Saravanan ThiyagarajanSIF18.14Six Months22-Aug-2321-Nov-23CP486On-going
485Proof checking of design and drawings of civil structures pertaining to Banarpal and Angul Blocks in Angul DistrictKALPATARU PROJECTS INTERNATIONAL LIMITEDDr. Jothi Saravanan ThiyagarajanSIF20.21Six Months22-Aug-2321-Nov-23CP485On-going
484Proof checking of Hanumanji statue at NathdwaraSMB CORPORATION OF INDIAProf. Dinakar PaslaSIF3.00Two Months4-Aug-233-Oct-23CP484Completed
483Proof checking of structural design and drawings of hostel buildingVASTUKAR (PROP-SOUMYENDU SHANKAR RAY)Dr. Jothi Saravanan ThiyagarajanSIF1.12Three Weeks8-Aug-231-Sep-23CP483Completed
482Structural stability check for the project building of G+1 at Khariar, Nuapada DistrictRG CIVIL CONSULTANTSDr. Jothi Saravanan ThiyagarajanSIF1.48Two Weeks11-Aug-2325-Aug-23CP482Completed
481Proof check of major bridge no.10 and 28 for the work "Development of railway infrastructure upto 4 MTPA plant expansion" of Vedanta Ltd. LanjigarhINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh Punera, Assistant ProfessorSIF7.08One Month2-Aug-231-Sep-23CP481Completed
480Mix design for construction of Technical building at BinnaguriCHHABINDRA KUMAR PRADHAN C/o GE(S) BinnaguriProf. Dinakar PaslaSIF1.18Two Months2-Aug-231-Oct-23CP480Completed
479Mix design for construction of substructure at Chandipur for MESM/s LIRA CONSTRUCTIONS PRIVATE LIMITED, C/o MES Chandipur, OdishaProf. Dinakar PaslaSIF1.18Two Months13-Jul-2312-Sep-23CP479Completed
478Design of cement concrete pavements for six FCI Depot in OdishaFOOD CORPORATION OF INDIADr U C SahooSIF11.80Six Months21-Jul-2320-Jan-24CP478Completed
477Request for proposal (RFP) for road work for Deendayal Port Authority (DPA)GLOBAL ARCHER CONSTRUCTION AND ENGINEERING LLPProf. Dinakar PaslaSIF5.90One Month25-Jul-2324-Aug-23CP477On-going
476Proof checking of structural design and drawings for Institutional Building on Plot No: 1-15, Wish Town, Sector 128, Jaypee Greens, Noida.M/s Wish Town Towers LLPProf. S K PandaSIF1.23Three Weeks24-Jul-2314-Aug-23CP476Completed
475Environmental Assessment Study for issue of No Increase in pollution load certificate for proposed Bitumen Unit of 832 TMTPA Capacity at Paradip RefineryM/s Indian Oil Corporation LimitedDr. Rama Krushna Sabat, Assistant ProfessorSMMME5.43Three Months24-Jul-2323-Oct-23CP475On-going
474Vetting of the technical report of engineering solution of slope stablization work at project-Bengaluru-Salem sectionGABION TECHNOLOGIES INDIA PRIVATE LIMITEDDr. B Hanumantha RaoSIF1.11Three Weeks16-Jul-238-Aug-23CP474On-going
473Fitness monitoring system & pro dignostics of LURO BURNERPARADEEP PHOSPHATES LTD.Dr. Venugopal ArumuruSMS14.57Six Months18-Jul-2317-Jan-24CP473On-going
472Proof checking of structural design and drawings for Factory Building on Plot No:-A-119/1,Sector-29,Yamuna Expressway,Distt. Gautam Buddh Nagar,UpSURYA GLOBAL FLEXIFILMS PRIVATE LIMITEDProf. S K PandaSIF4.91Three Weeks19-Jul-239-Aug-23CP472Completed
471Carrying out the Third Party Quality Assurance Consultancy (TPQAC) for the Construction and Development of Kendriya Vidyalaya School at Siddipet, TelanganaVADDI BOINA PRASADA REDDYProf. Dinakar PaslaSIF8.00One Year22-Jul-2321-Jul-24CP471On-going
470Proof checking of structural design and drawing of a multi-storeyed building proposed at Bhubaneswar, OdishaFORTUNE INFRAPROPERTIES PRIVATE LIMITEDProf. S K PandaSIF4.30One Month18-Jul-2317-Aug-23CP470Completed
469Proof checking of desing and drawings of civil structures in PuriM/S SPACE CUBEDr. Jothi Saravanan ThiyagarajanSIF1.59Three Weeks3-Jul-2324-Jul-23CP469Completed
468Proof checking of design of structural Glazing for AIIMS Bhubaneswar project.ARCHIFABSDr. Jothi Saravanan ThiyagarajanSIF2.21Three Weeks12-Jul-232-Aug-23CP468Completed
467Proof checking of structural design and drawing for project " Proposed Lachit Moidam Memorial complex a Lahdoigarh, Jorhat" AssamDesign Associates IncProf. S K PandaSIF2.36Three Weeks10-Jul-2331-Jul-23CP467Completed
466Proof checking of 02 nos of major bridges In connection with construction of railway siding at Mahespur, Dhanbad, JharkhandRITES LTDProf. S K PandaSIF2.36One Month3-Jul-232-Aug-23CP466Completed
465Mix design for construction of officers married accomodation for NAVY at VisakhapatnamRAGHUSONS INFRA ENGINEERING PRIVATE LIMITED,Prof. Dinakar PaslaSIF1.18Two Months12-Jun-2311-Aug-23CP465Completed
464Mix design for shotcrete for slope protection works at JODAKADTECH GEOINFRA PRIVATE LIMITEDProf. Dinakar PaslaSIF1.18Three Months9-Jun-238-Sep-23CP464Completed
463Structural healtth assessment for the up-gradation project-Duburi-Chandikhole (Pkg-III) sectionNATIONAL HIGHWAYS AUTHORITY OF INDIA PIU DHENKANALDr. Jothi Saravanan ThiyagarajanSIF14.99One Month23-Jun-2323-Jul-23CP463On-going
462Proof check of new signal buildingg at ParadipINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh PuneraSIF4.72One Month23-Jun-2323-Jul-23CP462On-going
461Proof checking of design and drawing of POT & PTFE bearing of major bridge No.2, Bridge No.4INDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh Punera,SIF3.54Three Weeks16-Jun-237-Jul-23CP461Completed
460Structural health assessment for the up-gradation project-Cuttack-Angul (Pkg-I) sectionNATIONAL HIGHWAYS AUTHORITY OF INDIA PIU DHENKANALDr. Jothi Saravanan ThiyagarajanSIF14.99One Month19-Jun-2318-Jul-23CP460On-going
459Structural health assessment for the up-gradation project-Cuttack-Angul (Pkg-II) sectionNATIONAL HIGHWAYS AUTHORITY OF INDIA PIU DHENKANALDr. Jothi Saravanan ThiyagarajanSIF14.99One Month19-Jun-2318-Jul-23CP459On-going
458Proof checking of Bridges in connection with construction of railway siding at load out system near Laxman project at Gevra area, KorbaRITES LTDProf. S K PandaSIF2.91One Month9-Jun-238-Jul-23CP458Completed
457Proof checking of six RCC Box Bridges of Rungta Mines LimitedRUNGTA MINES LTDDr. Suresh R DashSIF5.52One Month8-Jun-237-Jul-23CP457Completed
456Structural Vetting of Engineering, procurement and construction of Precision Engineering building and facilities for precision Engineering complex at Bhubaneswar (Odisha)SHREEJI INFRASTRUCTURE INDIA PRIVATE LIMITEDProf. Sarat Kumar PandaSIF5.90One Month3-Jun-232-Jul-23CP456Completed
455Mix design for AIIMS Bhubaneswar Critical care blockURC CONSTRUCTION PRIVATE LIMITEDProf. Dinakar PaslaSIF1.18Two Months26-May-2325-Jul-23CP455Completed
454Carrying out the Third Party Quality Assurance Consultancy (TPQAC) for the Construction and Development of Kendriya Viadyalaya School at Angul, OdishaNARAYAN KUMAR INFRASTRUCTURE PVT LTD C/o NPCC LtdProf. Dinakar PaslaSIF8.00One Year15-May-2314-May-24CP454On-going
453Design of SCC for IISER BerhampurM/s DALMIA CEMENT (BHARAT) LIMITEDProf. Dinakar PaslaSIF1.18One Month11-May-2310-Jun-23CP453Completed
452Utilization of red mud in concrete compositesM/S VEDANTA LIMITED ALUMINIUM & POWERProf. Dinakar PaslaSIF17.70Seven Months18-May-2317-Dec-23CP452Completed
451Proof check to the desing drawings for a short span RCC T-beam structure under 19BRTF projectLamnekha Construction Pvt. LtdDr. Jothi Saravanan ThiyagarajanSIF1.99Two Weeks15-May-2331-May-23CP451Completed
450Mix design for Construction of Technical Building at ChandipurCHHABINDRA KUMAR PRADHANProf. Dinakar PaslaSIF1.18Two Month6-May-235-Jul-23CP450Completed
449Mix design for construction of MES Building at ChandipurM/s LIRA CONSTRUCTIONS PRIVATE LIMITED,Prof. Dinakar PaslaSIF1.18One Month1-May-2331-May-23CP449Completed
448Proof checking of Bridges in connection with construction of railway siding at Jhanjra OCP near UKHRA stationRITES LIMITEDProf. S K PandaSIF5.37Two Months10-May-239-Jul-23CP448Completed
447Proof checking of minor steel girder bridge proposed across GAIL pipeline of Naini Coal Mines,OdishaThe Singareni Collieries Company LimitedProf. S K PandaSIF0.83One Month6-May-235-Jun-23CP447Completed
446Proof checking of minor bridges for proposed railway siding at Sogra Railway Station under Chakradharpur divisionSHIVA CEMENT LIMITEDProf. S K PandaSIF4.60One Month9-May-238-Jun-23CP446Completed
445Checking of design for soil improvement using PVD for East Coast RailwayRKIPL-KVRECPL-SKC JVProf.Sumanta Haldar, ProfessorSIF1.77One Month26-Apr-2325-May-23CP445Completed
444Detailed technical opinion on mobile manugacturing parts " Display assempbly, fullfit scren and connectors"OPPO MOBILES INDIA PVT. LTD.Dr. Barathram RamkumarSES0.75Two Weeks9-May-2323-May-23CP444On-going
443Mix design for construction of critical care hospital block AIIMS BhubaneswarURC CONSTRUCTION PRIVATE LIMITEDProf. Dinakar PaslaSIF1.18Two Months27-Apr-2326-Jun-23CP443Completed
442Structural vetting of superstructure of 18m span ROB for additional load due to proposed pipelineM/s PIR Projects and Consultancy Private LimitedDr. Suresh R DashSIF2.43One Month24-Apr-2323-May-23CP442Completed
441Proof checking of structural design and drawing of the worker's hostel at Rourkela, Chodwar and Chhatabar under SCDFInfrastructure Development Corporation Of Odisha Ltd.Dr. Suresh R DashSIF13.95Two Months27-Apr-2326-Jun-23CP441On-going
440Proof checking of launching schemes for ROB at 245+923 (Bimalgarh)- 60m Bow string GirderRKD CONSTRUCTION PVT LTD.Dr. Suresh R DashSIF2.07Three Weeks17-Apr-238-May-23CP440Completed
439Design and development of specialised BLDC MotorsAlphasine Technologies Private LimitedDr. Ankit DalalSES1.50One Year20-Apr-2319-Apr-24CP439Completed
438Designing of Algorithms for pedestrian attribute learning and recognitionKorean Institute of Science and TechnologyDr. Debi Prosad DograSES24.75Ten Months & Fifteen Days19-Apr-2318-Feb-24CP438Completed
437Vetting of structural design and drawing of T-beam bridge with pile foundation at Koah Nala at Kahalgaon, BiharCUBE ENGITECH CONSULTANT PVT LTDProf. S K PandaSIF3.53One Month15-Apr-2314-May-23CP437Completed
436Stabilization of Soil using Cement & Novocrete at JSW Utkal Steel Ltd, ParadeepNOVOCRETE INDIA PRIVATE LIMITEDDr. U C SahooSIF2.39Three Months13-Apr-2312-Jul-23CP436On-going
435Proof checking of 2RCC Box culvert and RCC Apron for ballast less track at private siding of M/s HPCL on Raipur-Titlagarh SectionRITES LTDDr. Suresh R DashSIF2.07Two Weeks11-Apr-2325-Apr-23CP435Completed
434Technical proof checking of Design & drawing of various component of RWSS-projectsNCC LimitedDr. Puspendu BhuniaSIF29.50Six Months11-Apr-2310-Oct-23CP434On-going
433Carrying out Environmental Audit of Smelter Plant, NALCO and issue of no increase in pollution load certificateNATIONAL ALUMINIUM CO. LTD.Dr. Manaswini BeheraSIF4.13Two Months30-Mar-2329-May-23CP433Completed
432Design of Cement Concrete Pavement for FCI depot at Khurda RoadFOOD CORPORATION OF INDIADr. Umesh C SahooSIF2.36Three Months30-Mar-2329-Jun-23CP432Completed
431Vetting of Project Report for amendment of environmental clerance of Shyam Metalics & Engergy LimitedCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED, Dr. Rajesh Roshan DashSIF0.77Ten Days30-Mar-239-Apr-23CP431On-going
430Remedial measures to be taken for repairing PSC Girder No-17 of Railway Bridge over the IOCL Pipeline AT MMLP-Paradip (Odisha)AMULYA KUMAR DASHDr. Goutam MondalSIF3.69Three Months31-Mar-2330-Jun-23CP430Completed
429Mix designs for BHEL TalcherRDC CONCRETE INDIA PRIVATE LIMITEDProf. Dinakar PaslaSIF2.50Two Months14-Mar-2313-May-23CP429Completed
428Carrying out the Third Party Quality Assurance Consultancy (TPQAC) for the construction and development of Kendriya Vidyalaya School at Kakinada Andhra PradeshM/s Saroj ConstructionProf. Dinakar PaslaSIF8.00One Year10-Mar-239-Mar-24CP428On-going
427Proof checking of structural design and drawing of the bridge across simuli nallah, KeonjharEXECUTIVE ENGINEER, N.H. DIVISION, KEONJHARDr. Suresh R DashSIF5.02One Month21-Mar-2320-Apr-23CP427Completed
426Residual stress measurement in welded pipes and platesM/S TATA STEEL LIMITEDProf. M M MahapatraSMS11.55Seven Months27-Mar-2326-Oct-23CP426On-going
425Structural adequacy of the existing plants (1,2,3) and dam administrative buildingGLOBAL LAB MATERIAL TESTING PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF1.48Two Weeks23-Mar-236-Apr-23CP425Completed
424Structural Design Suggestion for restoration of P8 and strengthening of P9 and P11 of Belabahali Major Bridge LHS at Km 35+341 of New NH-20, OdishaBloom Companies, LLCDr. Suresh R DashSIF6.64Two Months6-Mar-235-May-23CP424Completed
423Rut Test for DBM-2 Grade HMADCC INFRA PROJECTS LIMITEDDr. Anush K ChandrappaSIF1.18One Month3-Mar-232-Apr-23CP423On-going
422Vetting of structural design and drawing of G+7 storied (Block-A) and B+G+4 (Block-B) Hotel and Convention centre of MAYFAIR SanctuaryM/S MAYFAIR HOTELS & RESORTS LTD.Prof. S K PandaSIF14.99Two Months10-Mar-239-May-23CP422Completed
421Carrying out The Third Party Quality Assurance Consultancy (TPQAC) for the Construction and Development of Kendriya Vidyalaya School at Balasore district, OdishaSinghal Enterprises C/o NPCC LtdDr. Dinakar PaslaSIF8.00One Year23-Feb-2322-Feb-24CP421On-going
420Proof checking of Elevated service Reservoir on precast basis at Dharmasala, Rasulpur & DanagadiM/S KEC INTERNATIONAL LTD.Prof. Sumanta HaldarSIF1.50One Month27-Feb-2330-Mar-23CP420Completed
419Stabilization of Soil using Etonis 1400S for application in Road PavementsWacker Chemie India Private LimitedDr. U C SahooSIF2.95Two Months17-Feb-2316-Apr-23CP419Completed
418Proof checking of design and drawings for the three lane bridge over railway track between Mancheswar-VaniviharM/s RAIL VIKAS NIGAM LIMITEDDr. Dinakar PaslaSIF2.50Three Months4-Feb-233-May-23CP418Completed
417Proof checking of Design and Drawing of POT PTFE Bearings for ROB at MCL TalcherRKD INFRA C/o RITES Ltd BhubaneswarDr. Suresh R DashSIF3.54One Month14-Feb-2313-Mar-23CP417On-going
416Testing of steel samples collected from various stel plantsCHIEF ENGINEER RD & QP (R&B) BBSRDr. Soobhankar PatiSMMME4.78Two Weeks4-Feb-2318-Feb-23CP416Completed
415Scrutiny of Chimney design calculations & Drawings (For WHRB & CFBC Chimneys)MGM MINERALS LIMITEDDr. B Hanumantha RaoSIF0.81Three Weeks1-Feb-2321-Feb-23CP415On-going
414Durability Testing of Soil Stabilised with Soil Tech MK III as per IRC: SP 89 (PART-II)-2018Polymer Pavements India LLPDr. U C SahooSIF1.59Two and Half Month2-Feb-2317-Apr-23CP414Completed
413Mix design for SCC for SCB Medical College CuttackLarsen and Toubro - Infrastructure VerticalDr. Dinakar Pasla, Associate ProfessorSIF3.54Three Months30-Jan-2329-Apr-23CP413Completed
412Proof checking of desing and drawing of 1 x 11.65m RCC Slab BridgeISC PROJECTS PVT LTDDr. Suresh R DashSIF2.95Three Weeks24-Jan-2314-Feb-23CP412On-going
411Development of Drone System for Cleaning High Rise Buildings & for spraying PesticidesSUN FIBO TECHNOLOGY PRIVATE LIMITEDDr. Yogesh Ganpat BhumkarSMS1.07One Year22-Jan-2321-Jan-24CP411On-going
410Proof checking of Design and Drawing of substructure for elevated double track viaduct at GUA Railway station JharkhandRITES Ltd (Bhubaneswar)Dr. Suresh R DashSIF23.05Eight Months18-Jan-2317-Sep-23CP410On-going
409Structural adequacy of existing water tank for 1.5m and 3m steel pole on topJHAMUNA TOWER TECH PRIVATE LIMITEDDr. Jothi Saravanan ThiyagarajanSIF1.48Two Weeks13-Jan-2327-Jan-23CP409Completed
408Proof checking of structural design of Lube Hub (34x75m) in size for foundation and superstructureM/s CREATIVE STUDIODr. Devesh PuneraSIF1.18One Month9-Jan-239-Feb-23CP408Completed
407Structural vetting of RCC culvert bridges, and station buildingsM/s PIR Projects and Consultancy Private LimitedDr. Goutam MondalSIF6.93Fourteen Months7-Jan-236-Mar-24CP407On-going
406Vetting of Ardent GHG Emission ReportCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED, Dr. Rajesh Roshan DashSIF0.77Two Weeks27-Dec-2210-Jan-23CP406Completed
405Carrying out The Third Party Quality Assurance Consultancy (TPQAC) for the construction and development of Kendriya Vidyalaya School at Vyasnagar, Jajpur District, OdishaNARAYAN KUMAR INFRASTRUCTURE PVT LTD C/o NPCC LtdDr. Dinakar PaslaSIF8.00One Year26-Dec-2225-Dec-23CP405On-going
404Mix design of DBM and DAC of Hirasar Airport, RajkotYASHNAND ENGINEERS AND CONTRACTORS PRIVATE LIMITEDDr. Anush K ChandrappaSIF1.18One Month31-Dec-2230-Jan-23CP404On-going
403Design of SCC for the Construction of Parshuramji Statue at Arunanchal PradeshM/s Vipra FoundationDr. Dinakar PaslaSIF3.00Two Months21-Dec-2220-Feb-23CP403Completed
402Mix design for Bridge work of East Coast Railway, JajpurTRENZET INFRA PRIVATE LIMITED C/o East Coast Railway, JajpurDr. Dinakar Pasla, ProfessorSIF2.95Three Months29-Oct-2228-Jan-23CP402Completed
401Carrying out The Third Party Quality Assurance Consultancy (TPQAC) for the construction and development of Kendriya Vidyalaya School at Dharmagard, Kalahandi, OdishaM/S- BAISHNAB CHARAN NAYAK C/o NPCC LtdDr. Dinakar PaslaSIF8.00One Year15-Dec-2214-Dec-23CP401Completed
400Mix Design of BSM using RAP and BitChem Tailor Made Cold Binder/Emulsion for NH-2, Bardhaman, WBBITCHEM ASPHALT TECHNOLOGIES LTD.Dr. U C SahooSIF1.18Five Weeks16-Dec-2220-Jan-23CP400On-going
399Characterization of Polymer and Crumb Rubber Modified BitumenBITCHEM ASPHALT TECHNOLOGIES LTD.Dr. Anush K ChandrappaSIF3.19Two Months15-Dec-2214-Feb-23CP399Completed
398FOS measurement of tailings dams-2021 of Vedanta Limited, LanjigarhM/S VEDANTA LIMITED ALUMINIUM & POWERDr. B Hanumantha Rao, Associate ProfessorSIF6.05One Year8-Dec-227-Dec-23CP398On-going
397Design of ground improvement work in connection with RoB in MCHP area of Paradip Port Authority, OdishaINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. B Hanumantha Rao, Associate ProfessorSIF2.21One Month9-Dec-228-Jan-23CP397On-going
396Analog CMOS circuit designMARQUEESEMI INDIA PRIVATE LIMITEDDr. Nijwm Wary, Assistant ProfessorSES4.80One Year7-Dec-226-Dec-23CP396Completed
395Review of the Road Structure Design of the Perimeter Road at Rambilli near VisakhapatnaDirector General Naval ProjectsDr. U C Sahoo, Assistant ProfessorSIF3.07Two Months21-Nov-2220-Jan-23CP395On-going
394Mix designs for Township at ChhattisgarhJMC PROJECTS (INDIA) LIMITEDDr. Dinakar PaslaSIF7.38Six Months30-Nov-2231-May-23CP394Completed
393Mix design for construction of deparmtnetal building for Postal department at CuttackA B INFRA PROJECTS, C/o Depatment of Post, CuttackDr. Dinakar PaslaSIF1.18Two Months5-Nov-224-Jan-23CP393Completed
392Construction of Plant roads, drains, culverts and truck parkingTALCHER FERTILIZERS LIMITED C/o RCF LimitedDr. B Hanumantha RaoSIF2.36Two Months24-Nov-2223-Jan-23CP392On-going
391Design of internal road witthin RMP for mud transportM/S. UTKAL ALUMINA INTERNATIONAL LTD.Dr. B Hanumantha Rao, Assistant ProfessorSIF5.32Two Months29-Nov-2228-Jan-23CP391On-going
390Vetting of Electrical and E&M Designs and Drawings of Nayagarh ProjectM/s GVPR ENGINEERS LIMITEDDr. Srinivas Bhaskar Karanki, SESSES4.43Nine Months23-Nov-2222-Aug-23CP390On-going
389Proof checking of a single storey buildingM/S GODGRACE INFRASTRUCTURE AND CODr. B Hanumantha Rao, Assistant ProfessorSIF1.03Three Weeks15-Nov-224-Dec-22CP389On-going
388Geotechnical investigation and Foundation Design System at DRI, SMS 1&2 and CPP Project siteMGM MINERALS LIMITEDDr. B Hanumantha Rao, Associate ProfessorSIF1.25One Month15-Nov-2214-Dec-22CP388On-going
387Design verifications of security wallM/s LIRA CONSTRUCTIONS PRIVATE LIMITED, C/o MES Chandipur, OdishaDr. Dinakar Pasla, ProfessorSIF1.18Two Months10-Nov-2210-Jan-23CP387Completed
386Design of PQC for MES ChandipurM/s LIRA CONSTRUCTIONS PRIVATE LIMITED, C/o MES Chandipur, OdishaDr. Dinakar Pasla, ProfessorSIF1.18Two Months9-Nov-229-Jan-23CP386Completed
385Proof checking of 2 Nos. of Bridges at MCL SardegaM/s RITES LimitedDr. Suresh R DashSIF3.98One Month29-Oct-2228-Nov-22CP385Completed
384Repair/Re-erection Decision of 50m SS Tower at AIR, PuriPRASAR BHARATI BROADCASTING CORPORATION OF INDIADr. Goutam MondalSIF4.43Four Months27-Oct-2226-Feb-23CP384On-going
383Technical report on new SW RMF: Pollution load to the first level aquifer and site location of the new RMF unitM/S VEDANTA LIMITED ALUMINIUM & POWERDr. B Hanumantha Rao, Assistant ProfessorSIF4.97One and Half Month14-Oct-2228-Nov-22CP383On-going
382Proof Checking for the construction of 132 Nos Type II Quarters at Old Kalyan Mandap in Unit VIII and 84 nos Type IV Quarter near old AG Colony, in Unit IV, BhubaneswarSHREEJIKRUPA PROJECT LIMITEDDr. Goutam MondalSIF16.23Three Months20-Oct-2219-Jan-23CP382On-going
381Carrying out the vetting of warehouse of Coca Cola Beverages Pvt Ltd KhordaRATNA INFRASTRUCTURESDr. Dinakar Pasla, Associate ProfessorSIF2.36Three Months12-Oct-2211-Jan-23CP381Completed
380TPQA Services for Five Tribal Schools of OdishaWAPCOS LIMITEDDr.Dinakar PaslaSIF25.95Two Years18-Oct-2217-Oct-24CP380On-going
379Proof checking of ROB of NH-16, Bhadrak-Balasore road project for SE RailwayBRIJ GOPAL CONSTRUCTION COMPANY PRIVATE LIMITEDDr. Sumanta Haldar, Associate PropessorSIF2.50One Month3-Oct-222-Nov-22CP379Completed
378Vetting of Electrical and E&M Designs and Drawings of Nawarngpur ProjectM/s GVPR ENGINEERS LIMITEDDr. Srinvas Bhaskar Karanki, Assistant Professor, SESSES7.38Nine Months13-Oct-2212-May-23CP378On-going
377The microstructural characterization of advanced high strength steel and suggestions to improve the propertiesM/S. JINDAL STAINLESS LIMITEDDr. Rama Krushna Sabat, Assistant ProfessorSMMME6.16Ten Months11-Oct-2210-Aug-23CP377Completed
376Surface run-off management study for kurmitar iron ore mines of OMCM/s OMC LtdDr. Arindam SarkarSIF22.13Six Months10-Oct-229-Apr-23CP376Completed
375Vetting of structural stability of railway bridgesBECQUEREL INDUSTRIES PRIVATE LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF2.94One and Half Month29-Sep-2213-Nov-22CP375On-going
374Vetting the desing and drawing report of gabion wall as a part of WMumbai Coastal Road Project (South) package IIGABION TECHNOLOGIES INDIA PRIVATE LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF1.03One and Half Month29-Sep-2213-Nov-22CP374On-going
373Proof checking of FOB at Ranchi Coast RailwayRAIL VIKAS NIGAM LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF1.18Two Months2-Sep-221-Nov-22CP373Completed
372Vetting of Retaining Wall Design, Drawing and Methodology for Repairing of RE wall at km. 349+580 LHS Singhara-Binjhabahal section of NH-6M/S MONTECARLO LIMITEDDr. U C SahooSIF2.36One Month29-Sep-2228-Oct-22CP372Completed
371Rut Test for BC Grade MixtureDILIP BUILDCON LIMITEDDr. Anush K ChandrappaSIF1.18One Month23-Sep-2222-Oct-22CP371On-going
370Assesment of soil strength using MASW test at CuttackAIMIL LTDDr. Sumanta Haldar, Associate PropessorSIF3.00One Week22-Sep-2229-Sep-22CP370Completed
369Vetting of desing of embankment for rail track in Ananta CHP TalcherMAHANADI COALFIELDS LIMITED.Dr. Sumanta Haldar, Associate PropessorSIF1.18Two Weeks26-Sep-2210-Oct-22CP369Completed
368Testing of FlyAsh as per IRC SP 58-2001 to use as an Embankment Fill MaterialRKD CONSTRUCTION PVT LTD.Dr. U C SahooSIF1.30One Month7-Sep-226-Sep-22CP368Completed
367Proof checking of Hanger door for AAI, BBSRTECHNOCRATS SECURITY SYSTEMS PRIVATE LIMITEDDr. Sumanta Haldar, Associate PropessorSIF1.18Two Weeks1-Sep-2214-Sep-22CP367Completed
366Investigation of RE wall Failure at km. 349+580 LHS Singhara-Binjhabahal section of NH-6PROJECT DIRECTOR PROJECT IMPLEMENTATION UNIT KEONJHARDr. U C SahooSIF2.95One Month31-Aug-2230-Sep-23CP366Completed
365Analyzing Co-Occurring Road and Traffic Anomalies using deep learningKorean Institute of Science and TechnologyDr. Devi Prasad DograSES17.79One Year30-Aug-2229-Aug-23CP365Completed
364Third Party Construction Quality Testing of Jamujhadi-Basudevpur Dhamar RoadUMSL LTDDr. U C SahooSIF3.54One Month29-Aug-2228-Aug-22CP364Completed
363Proof checking of 3 different height retaining walls at CRWC-MancheswarM/s RITES LimitedDr. Suresh R. DashSIF1.77Three Weeks25-Aug-2215-Sep-22CP363Completed
362Stabilization of Steel Slag usingg NovocreteNISCO BUILDERS AND DEVELOPERS PRIVATE LIMITEDDr. U C SahooSIF3.98Four Months17-Aug-2216-Dec-22CP362Completed
361Scrutiny of Structural design and drawings for Portal at Adityapur and Tata Nagar Railway StationM/S KEC INTERNATIONAL LTD.Dr. Suresh R. DashSIF6.64One Month10-Aug-229-Sep-22CP361Completed
360Mix design for Self Compacting Concrete for SCB Medical College CuttackNCC LimitedDr. Dinakar Pasla, Associate ProfessorSIF3.04Two Months22-Jul-2221-Sep-22CP360Completed
359Water Quality Analysis and Interpretation to check its suitability for construction purposeNCC LimitedDr. Manaswini BeheraSIF0.40Fifteen Days18-Jul-2225-Jul-22CP359Completed
358Design Review for Multi variable Industrial SensorHONEYWELL TECHNOLOGY SOLUTIONS LAB PVT. LTD.Dr. Venugopal ArumuruSMS5.1610 Weeks8-Jul-227-May-23CP358On-going
357Submission of the analysis of the project specific tariff of Lower Baitarani SHEPM/s GRIDCO LtdDr. Subhransu Ranjan Samantaray, Associate ProfessorSES3.32One Month11-Jul-2210-Aug-22CP357Completed
356Vetting of Traffic Assessment Report for Shree Ram Construction housing and commercial building project for Environmental ClearanceCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED, Dr. Partha Pratim DeySIF0.77One Week8-Jul-2216-Jul-22CP356Completed
355Mix designs for Koraput districtJMC PROJECTS (INDIA) LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF2.60Two Months9-May-228-Jul-22CP355Completed
354Proof checking of Road Mix Design for Hirasar Inteernational Airport, RajkotYASHNAND ENGINEERS AND CONTRACTORS PRIVATE LIMITEDDr. Anush K ChandrappaSIF0.77One Month18-Jun-2217-Jun-22CP354Completed
353Vetting of the technical report on slope stabilzation at P4-P5 Noney, ManipurGABION TECHNOLOGIES INDIA PRIVATE LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF1.03Two Weeks7-Jun-2222-Jun-22CP353On-going
352Soil Core Sample TestingRE SUSTAINABILITY LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF1.41Eight Weeks2-Jun-2228-Jul-22CP352On-going
351Consultancy services for Structural Peer Review at Ariana ProjectM/S KRIDAY REALTY PVT LTDDr. Dinakar Pasla, Associate ProfessorSIF11.80Three Months3-Jun-222-Sep-22CP351Completed
350Conducting detailed design consultancy service for ground improvementt with PVD (prefabricated vertical drains) at high bank locationsINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF5.90Two Months6-Jun-225-Aug-22CP350On-going
349Mix design for Construction of Infrastructure Augmentaion under GE ChilkaSHRI GURMUKHDAS CONTRACTORS PRIVATE LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF2.12Three Months27-Apr-2226-Jul-22CP349Completed
348Mix Design for structural grade concretes for MGM PlantGANNON DUNKERLEY & COMPANY LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF1.30Two Months30-Apr-2229-Jun-22CP348Completed
347Hydrological studies under basement area at TaTa Ariana BhubaneswarM/S KRIDAY REALTY PVT LTDDr. Arindam Sarkar, Assistant ProfessorSIF5.24Sixteen Months30-May-2229-Sep-23CP347Completed
346Review of design drawings for construction of ground improvement project at red mud stack at Vedanta lanjigarh, OdishaGARWARE TECHNICAL FIBRES LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF2.66One Month18-May-2217-Jun-22CP346On-going
345Dyke & stack stability study of Part-A and red mud storage plan for plan-BM/S. UTKAL ALUMINA INTERNATIONAL LTD.Dr. B Hanumantha Rao, Assistant ProfessorSIF8.02One Year Two Months16-May-2215-Jul-23CP345On-going
344Proof Checking of Design and Drawing of Substructure and Foundation for ROB on NH143 at ChampajharanRKD CONSTRUCTION PVT LTD.Dr. Suresh Ranjan DashSIF2.66Twenty Days7-May-2227-May-22CP344Completed
343Geotechnical strength of the earthen embankment and Soil Thickness measurement" for Ash Dyke area of Vedanta Limited at JharsugudaCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED, Dr. B Hanumantha Rao, Assistant ProfessorSIF1.62One Month21-Apr-2220-May-22CP343On-going
342Proof Checking of Design and Drawing of one ROB and two Non-RDSO standard Minor Bridges for Railway siding at GUA Railway Station, JharkhandRITES Ltd (Bhubaneswar)Dr. Suresh Ranjan DashSIF6.20Two Months30-Apr-2229-Jun-22CP342Completed
341Mix Design for redevelopment and expansion of SCB Medical College, Cuttack under Phase-ILARSEN & TOUBRO LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF8.85Three Months20-Apr-2224-Jul-22CP341Completed
340Determination and Analysis of Residual Stress in Aero Engine Compressor RotorIndian Air ForceDr. Manas Mohan MahapatraSMS17.58One Year21-Apr-2220-Apr-23CP340On-going
339Vetting of Traffic Assessment Report for Grand Riviera residential building project for Environmental clearanceGRAND BAZAAR DEVELOPERS LLPDr. Rajesh Roshan DashSIF0.77One Week2-Apr-228-Apr-22CP339Completed
338Execution of Rural Piped water supply project, pertaining to Ranipada Cluster of Banpur Block of Khurda District I/C five year of Operation and MaintenanceUMSL LTDDr. Srinvas Bhaskar Karanki, Assistant Professor, SESSES1.48Four Months3-Apr-222-Jul-22CP338On-going
337Mix design and testing of construction materials for SCB Medical College CuttackNCC LimitedDr. Dinakar Pasla, Associate ProfessorSIF4.30Three Months7-Apr-226-Jul-22CP337Completed
336Technical Support to PMGSY Projects through Laboratory TestingARYA CONSTRUCTION C/o Rural Works Department, GoODr. U C Sahoo, Assistant ProfessorSIF0.30One Month19-Apr-2218-May-22CP336On-going
335Proof checking of Design and drawing of Superstructure, Substructure and bearing for the Proposed bridge crossing IOCL Pipelines in connection with proposed Multi-Model Logistic Park/Container Terminal at Paradeep (Odisha)CONTAINER CORPORATION OF INDIA LIMITEDDr. Goutam MondalSIF15.93Three Months9-Mar-228-Jun-22CP335Completed
334Engineering operations philosophy for long term mud management of pond BM/S. UTKAL ALUMINA INTERNATIONAL LTD.Dr. B Hanumantha Rao, Assistant ProfessorSIF4.14One Year One Month16-Mar-2215-Apr-23CP334Completed
333Accretion control in kins to enhance campaign life from 60 days to 90 daysSHRI MAHAVIR FERRO ALLOYS (P) LTDProf. Brahma Deo, MGM Chair Professor, SMMMESMMME12.98Nine Months15-Mar-2214-Dec-22CP333On-going
332Design vetting of the technical report for the proposed gabion wall reinforced by the anchorM/s Gateway Office Parks Private LimitedDr B Hanumantha Rao, Assistant ProfessorSIF1.75Two Weeks29-Jun-2113-Jul-22CP332On-going
331Vetting of Traffic Assessment Report for M/s Tirumala Infrastructure and Development (P) Ltd., residential building project at Subudhipur and Shankarpur, for Environmental ClearanceTIRUMALA INFRASTRUCTURE AND DEVELOPMENT PRIVATE LIMITEDDr. Rajesh Roshan DashSIF0.77One Week17-Mar-2225-Mar-22CP331Completed
330Vetting of Traffic Assessment Report for M/s Shuvam Construction (P) Ltd., building project at Ghatikia for Environmental ClearanceCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED, Dr. Rajesh Roshan DashSIF0.77One Week2-Mar-2210-Mar-22CP330Completed
329Proof checking of Design and Drawings for a Two Lane bridge at Km 432/25-27 over Rly track between Mancheswar-VaniviharM/s RAIL VIKAS NIGAM LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF2.50Three Months16-Mar-2216-Jun-22CP329Completed
328Technical viability of use of Raw Petroleum coke in Manufacturing of ECP/Soderberg PasteNOC FOUNDATION NEW OPPORTUNITY FOR CHILDRENSDr. V Pandu RangaSMS0.38Four Days8-Mar-2212-Mar-22CP328Completed
327Carrying out Proof Checking Overhead Structural Utility Gallery for Tata Steel KalinganagarTATA STEEL LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF5.90Four Months18-Feb-2217-Jun-22CP327Completed
326SS310 Testing by IIT BBSR for SAP HRS TOWER and TFR PIPINGM/s PARADEEP PHOSPHATES LTD.Dr. Srikant Golapudi, Assistant Professor, SMMMESIF2.35Seven Months25-Feb-2224-Sep-22CP326On-going
325Water Quality Analysis and Interpretation to check its suitability for construction purposeM/s NCC LimitedDr. Manaswini BeheraSIF0.40Eighteen Days28-Feb-2217-Mar-22CP325Completed
324Vetting of Traffic Assessment Study for Environmental Clearance of Residential Project of Utkal Builders Limited located at PatiaM/s UTKAL BUILDERS LTD.Dr. Rajesh Roshan DashSIF0.77Eighteen Days8-Feb-2226-Feb-22CP324Completed
323Vetting of Traffic Assessment Study for Environmental Clearance of Residential Project of Utkal Realtor Pvt Ltd located at PahalCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITEDDr. Rajesh Roshan DashSIF0.77Eighteen Days15-Feb-225-Mar-22CP323Completed
322Vetting of the technical report on slope stabilization at slope protection at Noney, ManipurGABION TECHNOLOGIES INDIA PRIVATE LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF0.89Three Weeks8-Feb-2228-Feb-22CP322On-going
321Proof checking of Design and drawing of foundation (pile and pile cap) for one pier at location of ROB at MCL, TalcherRITES Ltd (Bhubaneswar)Dr. Suresh Ranjan DashSIF1.18Two Weeks19-Feb-2223-Feb-22CP321Completed
320Proof checking of flexible pavement design of Duburi-Chandikhol Section of NH-53MS INFRA ENGINEERS PRIVATE LIMITEDDr. Anush K ChandrappaSIF1.76One Month19-Feb-2218-Mar-22CP320On-going
319Proof check of bridge no. 4 (ROB) and 5 (Over creek) for IPRCL BhubaneswarINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh Punera, Assistant ProfessorSIF5.37One Month17-Feb-2216-Mar-22CP319Completed
318Manufacturing of Building BlocksM/S TATA STEEL LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF16.99Twelve Monhts18-Feb-2217-Feb-23CP318Completed
317Carrying out the vetting of PEB at Hindustan Coca Cola Beverages Pvt Ltd (Building structure design vetting under NBC- for building > 15meters)AEDBM Consultants Private Limited C/o Hindustan Coca-Cola Beverages Pvt Limited, BBSRDr. Dinakar Pasla, Associate ProfessorSIF2.36Three Months14-Feb-2213-May-22CP317Completed
316Vetting of Comprehensive Traffic Density Report for M/s Alishan Realcon Pvt Ltd at Nuahata, Dist Cuttack, Odisha for Environmental ClearanceCENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITEDDr. Rajesh Roshan DashSIF0.77One Week14-Feb-2221-Feb-22CP316Completed
315Proof checking of 3.0m wide foot over bridge (steel structure) across at Singapur Road station as part of execution of 3rd Railway Line project from TIG-VZM in East Coast RailwayRAIL VIKAS NIGAM LIMITEDDr. Dinakar PaslaSIF1.18Two Months31.1.20224-Feb-22CP315Completed
314Proof check for major bridge no. 12,13 and 35 for the work "Development for railway infrastructure up to 4 MTPA plant expansion" of Vedanta Limited, JharsugudaINDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh PuneraSIF6.64Two Months10.01.20223-Sep-22CP314Completed
313Proof Checking of Bridge No.02 (1 X 6 m RCC Slab + 1 X 48.0 m Bow String Girder + 1 X 6 m RCC Slab)INDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. Devesh PuneraSIF2.95One Month10.01.20222-Sep-22CP313Completed
312Soil Sample Analysis (Landfill PH-III-B)RAMKY ENVIRO ENGINEERS LIMITEDDr. B Hanumantha Rao, Assistant ProfessorSIF1.41One Month21-Jan-2220-Feb-22CP312Completed
311Vetting of Geotechnical Investigation Report Conducted at Kenjaru Village in Mangaluru, KarnatakaM/s SWAYIN & ASSOCIATESDr. B Hanumantha Rao, Assistant ProfessorSIF1.71One Month18-Jan-2217-Feb-22CP311Completed
310Proof checking of slopestability and settlement analysis of formation between Ballia Bansdin section of North Eastern RailwaySUTRA CONSULTANCY AND CONSTRUCTIONSDr.Sumanta Haldar, Associate ProfessorSIF1.00Two Months14-Jan-2213-Mar-22CP310On-going
309Mix designs for Cuttack Water Supply ProjectJMC PROJECTS (INDIA) LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF2.73Four Months19-Jan-2218-May-22CP309Completed
308Vetting of 2x300 MSV tanks for BPCL at Kondapally, VijayawadaM/s CREATIVE STUDIODr. Devesh PuneraSIF1.69Three Weeks7-Jan-2231-Jan-22CP308Completed
307Structural vetting of 5 nos. of bridges of ESL Steel LtdM/s PIR Projects and Consultancy Private LimitedDr. Goutam MondalSIF4.72Three Months28-Dec-2127-Mar-22CP307Completed
306Establishment of Chair Position at IIT Bhubaneswar by OPTCLM/s ODISHA POWER TRANSMISSION CORPORATION LTDN.A.SES29.21Three Years14-Dec-2113-Dec-24CP306On-going
305Vetting/Consultancy for - "Execution of Rural Piped Water Supply Project pertaining to Ranipada cluster of Banpur Block of Khorda district including five years Operation & MaintenanceM/s UMSL LtdDr. Arindam SarkarSIF6.75Six months10-Dec-219-Jun-22CP305On-going
304Vetting of Electrical and E&I Designs and Drawings for Bramhagiri & Krushnaprasad block of Puri district of Odisha ProjectVoltas LimitedDr. Srinvas Bhaskar Karanki, Assistant Professor, SESSES4.13Nine Months7-Dec-216-Sep-22CP304Completed
303Vetting of Electrical and E&I Designs and Drawings for Rairakhol block of Sambalpur district of Odisha ProjectVoltas LimitedDr. Srinvas Bhaskar Karanki, Assistant Professor, SESSES4.13Nine Months7-Dec-216-Sep-22CP303Completed
302Concrete Mix Design for the construction of 3km long three lane flyover near jodaM/s RANJIT-CHEVROX (JV) C/o Odisha Bridge & Construction Coporation LimitedDr. Dinakar Pasla, Associate ProfessorSIF2.30Three Months3-Dec-212-Mar-22CP302Completed
301Testing of Construction Materials for proposed Rail connectivity of Spur No 3 & 4, Jagannath Washery under Jagannath Area, TalcherM/s Shanti Construction Sambalpur Pvt Ltd, C/o RITES LTDDr. U C Sahoo, Assistant ProfessorSIF3.72Six Weeks18-Nov-2129-Dec-21CP301Completed
300Vetting of Comprehensive Traffic Density Report for M/s Assotech Sun Growth Adobe LLP at Rudrapur, Bhubaneswar, Odisha for Environmental Clearance.CENTRE FOR ENVOTECH AND MANAGEMENT CONSULTANCY PRIVATE LIMITED, C/o M/s Assotech Sun Growth Adobe LLP at Rudrapur, Bhubaneswar, OdishaDr. Rajesh Roshan DashSIF0.89Two Months15-Nov-2115-Jan-22CP300On-going
299Study of failure of beams of Track Hopper & proposal for rectification.M/s ODISHA POWER GENERATION CORPORATION LIMITEDDr. Dinakar Pasla, Associate ProfessorSIF7.00Four Months11-Oct-2110-Feb-22CP299Completed
298Monitoring and remedial measures for controlling settlement on the embankment for Kolkata MetroM/s RAIL VIKAS NIGAM LIMITEDDr. Sumanta Haldar, Associate PropessorSIF7.08Six Months30-Oct-2130-Apr-22CP298Completed
297Proof check for design and detailed engineering and execution of piping, civil & structural jobs related to NG firing facility in GTs at PDRM/s MCE CONSULTING ENGINEERS PRIVATE LIMITEDDr. Devesh Punera, Assistant ProfessorSIF3.50Four Months4-Oct-213-Feb-22CP297On-going
296Proof Checking for Shiv Statue at Jajpur, OdishaM/s MATU RAM ART CENTRES PRIVATE LIMITEDDr. Dinakar PaslaSIF2.36Two Months18-Oct-2118-Dec-21CP296Completed
295Mix design for construction of Lord Shiva Statue at Jajpur TownM/s MATU RAM ART CENTRES PRIVATE LIMITEDDr. Dinakar PaslaSIF1.42Two Months22-Jul-2122-Sep-21CP295Completed
294No increase in pollution load certificate for additional products of Portland composite cement (PCC), Masonry cement (MC), Sulfate resisting Portland cement (SRPC).M/s THE RAMCO CEMENTS LIMITEDDr. Rama Krushna SabatSMMME4.72One month20-Sep-2119-Oct-21CP294On-going
293Scrutiny of structural design of Sudarshan VatikaM/s SUDARSHAN ESTCON PRIVATE LIMITEDDr. Devesh PuneraSIF2.66One Month20-Sep-2119-Oct-21CP293Completed
292Surface Run-Off Management Study at Gandhamardan Iron Ore Mine Block-A & Block B, M/s OMC Ltd located in Telkoi Tahasil of Keonjhar District OdishaM/s OMC LtdProf. R K PandaSIF17.70One Year2-Sep-211-Sep-22CP292Completed
291Structural vetting of the Swosti Premium Beach Resorts, a B+G+13 storied resort project situated at Sipasurubuli, Puri.M/s SWOSTI PREMIUM LIMITEDDr. Goutam MondalSIF8.11Three Months13-Sep-2112-Dec-21CP291Completed
290Composite roll feasibility study of M/s Deem Rool Technology Pvt LtdM/s DEEM ROLL-TECH LIMITEDDr. Partha Sarathi DeSMMME3.82Six Months17-Aug-2116-Feb-22CP290On-going
289Consultancy Services for proof checking of the Design Calculations and Working drawings of the bridges and culverts on Non-Government Railway line of The Dhamra Port Company Limited at Dhamra, OdishaM/s The Dhamra Port Company LtdDr. S R DashSIF9.96Four Months2-Sep-211-Jan-22CP289Completed
288Carrying out vetting of projects developed by Utkal Developers for Patrapada2, BhubaneswarM/s UTKAL BUILDERS LTDDr. Dinakar PaslaSIF3.00Four Months13-Aug-2112-Dec-21CP288Completed
287Water management at MGM Minerals Limited, DhenkanalM/S. MGM MINERALS LIMITEDDr. Arindam SarkarSIF26.55EIght Months12-Aug-2111-Apr-22CP287On-going
286Construction & upgradation to 2-lane with paved shoulder from Design Km. 67+805(End of 83rd km Tunnel) to Km 80+675 (Start of Kistwar Bypass) of 12.870 Km length on Khellani-Kishtwar-Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir onM/s A.E.C. INFRASTRUCTURE SERVICESDr. Partha Pratim DeySIF6.20Four and Half months20-Aug-214-Jan-22CP286Completed
285Technical vetting of CAPEX Plan of TPCODLM/s GRIDCO LtdDr. S R SamantaraySES1.59Two Weeks17-Aug-2131-Aug-21CP285Completed
284Product performance study of Dalmia CementsM/s DALMIA CEMENT (BHARAT) LIMITEDDr. Dinakar PaslaSIF14.16Six Months23-Jul-2122-Jan-21CP284Completed
283Understanding Road Traffic and Pedestrian AnomaliesM/s Korean Institute of Science and Technology (KIST)Dr. Debi Prosad DograSES19.38Seven Months2-Aug-211-Feb-22CP283On-going
282Environmental Audit of secured landfill facility at Paradip Refinery, Paradip, OdishaM/s Indian Oil Corporation LimitedDr. Rama Krushna SabatSMMME2.92One Month28-Jul-2126-Aug-21CP282On-going
281No increase in pollution load certificate for constructing 2nd red mud pondM/s NATIONAL ALUMINIUM CO. LTDDr. B Hanumantha RaoSIF1.62Nine Weeks20-Jul-2122-Sep-21CP281On-going
280Vetting of Electrical and E&M Designs and Drawings of Puri-Ganjam ProjectM/s GVPR ENGINEERS LIMITEDDr. S B KarankiSES6.20Nine Months10-Jul-219-Apr-22CP280Completed
279Proof checking the Designs and Drawings of Minor Bridges in connection with Jaroll-Jakhpura railway doubling projectM/s RAIL VIKAS NIGAM LIMITEDDr. S R DashSIF8.11Two Months22-Jul-2121-Sep-21CP279Completed
278Analog Design for Serial CommunicationM/s Ceremorphic IncDr. Nijwm WarySES23.56Four Years29-Jun-2128-Jun-25CP278On-going
277Design of non-shrink concrete for Tata Steel Kalinganagar projectM/s TATA STEEL LIMITEDDr. Dinakar PaslaSIF2.76Four Months25-Jun-2124-Oct-21CP277Completed
276Audit on geotechnical investigation, calculations of pile capacity, piling practices, pile test procedures, and suggesting measures for improvement in pile drilling processM/s INDIAN PORT RAIL & ROPEWAY CORPORATION LIMITEDDr. B Hanumantha RaoSIF1.90FIve Weeks31-May-215-Jul-21CP276On-going
275Mix designs for M30 grade of concrete using PPC, PSC and SRPC at ChandipurM/s CMRGS INFRASTRUCTURE PROJECTS LTD.Dr. Dinakar PaslaSIF1.53Two Months3-Jun-212-Aug-21CP275Completed
274Proof checking of the design of Railway Foot Over Bridge (Steel Structure) at AMB station yardM/s RAIL VIKAS NIGAM LIMITEDDr. Dinakar PaslaSIF1.18Two months25-May-2124-Jul-21CP274Completed
273Development of Concrete Mix Designs for IIM SambalpurM/s DEE VEE PROJECTS LIMITEDDr. Dinakar PaslaSIF3.68Four Months1-Jun-2130-Sep-21CP273Completed
272Vetting of new South-west red mud pond and PWL (Process Water Lake) designsM/S VEDANTA LIMITED ALUMINIUM & POWERDr. B Hanumantha RaoSIF27.86SIx Months27-May-2126-Nov-21CP272On-going
271Mix design for Construction of Substructure and Superstructure at ChandipurM/s LIRA CONSTRUCTIONS PRIVATE LIMITEDDr. Dinakar PaslaSIF1.18Two Months3-May-212-Jul-21CP271Completed
270Proof checking of foot over bridge and overhead piping crossing railway track for Tata SteelM/s Tata Steel LimitedDr. Dinakar PaslaSIF8.56SIx Months20-May-2119-Nov-21CP270Completed
269Testing of TMT RebarM/s Rungta Mines Limited C/o R&D & Q.P (R&B), Govt. of OdishaDr. Soobhankar PatiSMMME4.7815 days30-Mar-2114-Apr-21CP269Completed
268Soil core lab testingM/s Ramky Enviro Engineers LimitedDr. B Hanumantha RaoSIF1.41One Month5-Mar-214-Apr-21CP268Completed
267Environmental Audit of CHWTSDFM/s Ramky Enviro Engineers LimitedDr. B Hanumantha RaoSIF5.06Three Months5-Mar-214-Jun-21CP267Completed
266Development of Hydrophobic Concrete for Seabird ProjectM/s Master Builders Solutions India Private LimitedDr. Dinakar PaslaSIF5.37Four Months30-Mar-2129-Jul-21CP266Completed
265Vetting of GTI rock fall protection netting specifications "D-WR"GABION TECHNOLOGIES INDIA PRIVATE LIMITEDDr. B Hanumantha RaoSIF1.3049 days8-Mar-2125-Apr-21CP265On-going
264Measurement of factor of safety for tailings dams of RMP & ash pond at Vedanta LimitedVEDANTA LIMITED ALUMINIUM & POWERDr. B Hanumantha RaoSIF6.1439 days17-Mar-2124-Apr-21CP264On-going
263Vetting of box culvert design of Jeypore airport under RCS-UDAN (Long Term)DIRECTORATE OF AVIATION BHUBANESWAR C/o M/s Nirman SoudhaDr. Goutam MondalSIF2.21Three Months26-Mar-2125-Jun-21CP263Completed
262Proof checking of the structural design & drawing of PEB Hangar at Biju Patnaik international Airport, BhubaneswarM/s Yazdani International Pvt.Ltd/ C/o Capt Zaheed ParvezDr. Goutam MondalSIF5.61Three Months30-Mar-2129-Jun-21CP262Completed
261Structural Scrutiny of Railway BuildingsM/s PIR Projects and Consultancy Private LimitedDr. Goutam MondalSIF1.48Two Months17-Mar-2116-May-21CP261Completed
260Consultancy for corrective action for cracks developed during launching of pre-cast rcc box segment (span 2 x 6.0 x 6.0 m)M/s RITES LimitedDr. S R DashSIF1.9921 days26-Mar-2115-Apr-21CP260Completed
259Environmental Audit of secured landfill in smelter plant NALCO at AngulNALCODr. R R DashSIF3.45Two Months20-Mar-2119-May-21CP259Completed
258Dike & Stability study of red mud storage pond-AM/S. UTKAL ALUMINA INTERNATIONAL LTDDr. B Hanumantha RaoSIF9.56One Month26-Feb-2125-Mar-21CP258On-going
257Design of CGBM using Provence 907, a ready mix groutM/s Avijeet Agencies Pvt.LtdDr. U C SahooSIF2.36Three Months16-Mar-2115-Jun-21CP257Completed
256Vetting of soil investigation report for the work: Soil Investigation For Provision of Deficient Integrated Security Watch Towers Under GE (P) Ezhimala at INA Ezhimala.M/s IDAX Consultanting and Research Pvt. LtdDr. Sumanta Haldar, Associate PropessorSIF0.5915 Days5-Mar-2120-Mar-21CP256Completed
255Rehabilitation and Up-gradation of Road from Km 0.000 to Km 16.290 (Lenggth- 16.290 km) of Manu-Lalcherra section of NH 44A to two lane with Paved shoulder in the state of Triupra on EPC basis (pkg-1)- safety consultant service reg.M/s SSK InfrastructuresDr Partha Pratim DeySIF2.66Eighteen Months9-Mar-218-Sep-22CP255Completed
254Proof check of Major Bridge No. 8b of PEQCTPL siding at ParadeepM/s Indian Port Rail & Ropeway Corporation Ltd. (IPRCL) BhubaneswarDr Devesh PuneraSIF2.43One Month23-Feb-2122-Mar-21CP254Completed
253Carrying out Mix-designs of concrete for the Widening & Strengthening of Sankara Bypass RoadM/s Altima Infrastructure Private Limited, C/O NBCC (India) LimitedDr. Dinakar PaslaSIF1.84Two Months10-Feb-219-Apr-21CP253Completed
252Proof check and scrutiny of designs and drawings of substructure for 3 nos of major bridges in connection with NTPC-LARA projectM/s RITES LimitedDr. Suresh R DashSIF11.34Two Months5-Feb-214-Apr-21CP252On-going
251Carrying out vetting of projects developed by Utkal Developers Bhubaneswar for PatrapadaM/s Utkal BuildersDr. Dinakar PaslaSIF2.78Four Months19-Nov-2018-Mar-21CP251Completed
250Testing of spray concrete panels with PP fibersM/s Master Builders Solutions India Private Limited, C/0 M/s BASF India LtdDr. Dinakar PaslaSIF3.59Three Months8-Jan-217-Apr-21CP250Completed
249Stability test of ash dikesM/s Jindal India Thermal Power LimitedDr. B Hanumantha RaoSIF6.49One Month14-Jan-2113-Feb-21CP249On-going
248Proof checking of design and drawing of six Nos of minor bridges (Non-RDSO standard RCC Box) at Brajrajnagar, JharsugudaM/s RITES LimitedDr. Suresh R DashSIF7.18Two Months25-Jan-2124-Mar-21CP248Completed
247Surface Run-Off Management studies at Daitari Iron Ore Mine, South Kaliapani Chromite Mine and Sukrangi Chromite Mines, M/s OMC LtdThe Odisha Mining Corporation LtdProf. R K PandaSIF25.08One Year29-Jan-2128-Jan-22CP247Completed
246Suggesting measures for road failure at a hill section of NH-57M/s SCIW-YFC Joint VentureDr. Umesh Chandra SahooSIF3.54Two Months30-Jan-2130-Mar-21CP246Completed
245Vetting of design note on slope stabilityM/s Sai Gr Impex Pvt.LtdDr. B Hanumantha RaoSIF1.01One Month17-Dec-2016-Jan-21CP245On-going
244Vetting of Design of Wastewater Treatment plant equipment units for STPs, ETPs, and SRTsM/s SJ Environmental SolutionsDr. Rajesh roshan DashSIF1.24One Month18-Jan-2117-Feb-21CP244Completed
243Proof checking of Design and drawing of substructure for bridge in connection with Angul-Sukinda new BG Rail link ProjectM/s Rail Vikas Nigam LimitedDr. Suresh R DashSIF9.88Two Months5-Jan-214-Mar-21CP243Completed
242Regional and Sub-regional Analyses of Macroeconomic Policy Strategies for Growth and Equality in Southern AfricaUnited Nations University World Institute for Development Economics ResearchDr. Dukhabandu SahooSHSSM7.29230 Days15-Apr-2031-Dec-20CP242Completed
241Impact Assessment of WHO's framework convention on Tobacco control (FCTC) in India-A call to action report 2021M/s AF Development Care (AFDC)Dr. Dukhabandu SahooSHSSM12.644 Months12-Jan-2111-May-21CP241Cancelled
240Design and formulation of coating using molecular modelling and simulationM/s Tata Steel LtdProf. S K NayakSBS26.901 Year8-Jan-217-Jan-22CP240On-going
239Development of static model for Tata steel BOFTata Steel LtdProf. Brahma DeoSMMME31.861 Year18-Dec-2017-Dec-21CP239Completed
238Product development and technical support for cold mix Asphalt Application in Eastern IndiaBitchem Asphalt Technologies LtdDr. U C sahooSIF35.403 years24-Dec-2023-Dec-23CP238On-going
237Assessment study for issue of “no increase in pollution load” certificate to Paradip Refinery cum Petrochemical complex for processing crude oil above name plate capacity of 15 MMTPA = 10% maxIndian Oil Corporation LtdDr. Rama Krushna SabatSMMME4.223 months20-Nov-2019-Jan-21CP237Completed
236Vetting of traffic density study traffic density study for environmental clearance for TATA-Bhusan township at AngulCentre for Envotech and managementDr. R R DashSIF1.773 months19-Nov-2018-Feb-21CP236Completed
235Design and drawing of building of SSRM and HRO, RMS 'N' Division, Cuttack, OdishaPostal Civil DivisionDr. Sumanta HalderSIF5.001 month30-Sep-2030-Oct-20CP235Completed
234Carrying out vetting of projects developed by Utkal developers BhubaneswarUtkal Builders Pvt. LtdDr. Dinakar PaslaSIF2.784 months6-Oct-205-Feb-21CP234Completed
233Vetting of Traffic Density Study for Environmental Clearance for Housing project at Pahala, BhubaneswarCentre for Envotech and managementDr. P P DeySIF0.833 months13-Oct-2012-Jan-21CP233Completed
232Study the cause of defect on the wing walls of Br. 5 over Angul-Balaram Section of MCRL corridor and suggestion on remedial measures for the structureIRCON International LtdDr. S R DashSIF4.133 months29-Sep-2028-Dec-20CP232Completed
231Evaluation of PPC, PSC and Composite cements of Dalmia CementsDalmia Cements BharatDr. Dinakar PaslaSIF2.106 months10-Aug-209-Feb-21CP231Completed
230Carrying out the third party quality assurance consultancy (TPQAC) for the construction and development of Kendriya Vidyalaya Schoolat Jagatsinghpur, OdishaNational Projects Construction Cooperation LtdDr. Dinakar PaslaSIF7.5718 months16-Sep-2015-Mar-22CP230Completed
229Proof checking of design and drawing of substructure and foundation of 5 major bridge at Brajrajnagar, JharsugudaRITES LtdDr. S R DashSIF21.541 year7-Sep-206-Sep-21CP229Completed
228Residual Stress Measurement on Rotor Surface at various Locations (Base Metal & Weld) & Modelling of Rotor Weldment-For AUSC ProjectsBharat Heavy Electricals LimitedDr. M M MahapatraSMS9.203 months24-Aug-2023-Nov-20CP228Completed
227Testing of TMT Bars as per IS:1786:2008Office of Chief Engineer, Research Development & quality Promotion, OdishaDr. Soobhankar PatiSMMME1.782 Weeks11-Aug-2025-Aug-20CP227Completed
226Carrying out concrete mix designs for new greenfield airport at Hirasaar, Rajkot (Gujarat)Dillip Buildcon LtdDr. Dinakar PaslaSIF12.046 months12-Aug-2010-Feb-21CP226Completed
225Proof check and scrutiny of design and drawings of bridge substructure and foundation (Br.3 and Br.79) in connection with NTPC-LARA projectRITES LtdDr. S R DashSIF6.934 months5-Aug-205-Dec-20CP225Completed
224Carrying out concrete mix design for AIIMS Bhubaneswar second phase of constructionCPWDDr. Dinakar PaslaSIF1.002 months28-Jul-2028-Sep-20CP224Completed
223Proof checking of design and drawing of substructure for Bridge No. 180(ROB)Rail Vikas Nigam LimitedDr. S R DashSIF2.141 month24-Jul-2023-Aug-20CP223Completed
222Proof checking of detailed design and drawing for construction of New Greenfield Airport at Rajkot, GujaratDillip Buildcon LtdDr. Anush K CSIF23.601 year18-Jul-2017-Jul-21CP222Completed
221Preparation of catchment area treatment plan for the Dubuna Sakradihi iron and manganese ore mines of OMC Ltd.OMCProf. R K PandaSIF22.133 months2-Jul-202-Oct-20CP221On-going
220Anomaly Detection in VideosKISTDr. D P DograSES23.791 year26-Jun-2024-Feb-21CP220Completed
219Soil core lab testingRamkyDr. B hanumatha RaoSIF2.871 month23-Jun-2022-Jul-20CP219On-going
218Mathematical modelling for parameter estimation and vibration analysisITR, DRDODr. S R KannanSMS8.306 months16-Jun-2015-Dec-20CP218Completed
217ovPIR Projects and Consultancy Private LimitedDr. Goutam MondalSIF3.542 months24-Jun-2024-Aug-20CP217Completed
216Design and development of gaseous Oxygen heat exchanger for semi-cryogenic stageLiquid Propulsion Systems CentreDr. Prasenjit RathSMS5.0011 months3-May-2029-Mar-21CP216On-going
215Structural vetting of residential towers as per the BDA, OdishaMani TirumalaDr. Devesh PuneraSIF5.001 month5-Jun-204-Jul-20CP215Completed
214Technological interventions to reduce humananimal conflictState wildlifeProf. N C Sahoo Dr. S N Panigrahi Dr. Vijaykrishna kari Dr. Mithipati sivabhaskar IIT50.001 year3-Jun-2030-Sep-23CP214On-going
213Proof checking of the design and drawing of ROBs for KMC-RKDRKD Construction (P) Ltd.Dr. S R DashSIF10.842 months19-May-2019-Jul-20CP213Completed
212Proof checking of design and drawing of one of the revised substructure (Pier-P1) of Br. 172 in connection with Angul-Sukinda New B.G Rail link ProjectRail Vikas Nigam LimitedDr. S R DashSIF1.533 weeks18-May-208-Jun-20CP212On-going
211Vetting of 3.0m height retaining wall sheet at VSS airport, JharsugudaAirport Authority of India PR ConstructionDr. Dinakar PaslaSIF1.003 months15-May-2015-Aug-20CP211Completed
210Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and OdishaNRRDADr. U C SahooSIF82.581-Apr-2031-Mar-24CP210On-going
209Testing of samples for integrated Infrastructure Complex at Dhamnagar, BhadrakBridge and Roof Co, (India) Ltd.Dr. Dinakar PaslaSIF1.042 months12-Mar-2012-May-20CP209Completed
208Vetting of construction of civil works for installation of ILS at VSS airport JharsugudaAirport Authority of India PR ConstructionDr. Dinakar PaslaSIF1.003 months2-Jan-202-Apr-20CP208Completed
207Proof checking of design and drawing of road under bridge (RUB) at MCL, Talcher (span 2x6.0x6.0m RCC PRECAST SEGMENTAL BOX)RITES LtdDr. S R DashSIF2.021 month21-Mar-2020-Apr-20CP207Completed
206Vetting of new South-west red mud pond and PWL (process Water Lake) designsVedanta LtdDr. B hanumatha RaoSIF27.866 months25-Feb-20CP206Cancelled
205Study of ground water table and surface water discharge at Tata Steel KalinganagarTata Steel LtdDr. Arindam SarkarSIF14.753 months5-Feb-205-May-20CP205Completed
204Proof check and scrutiny of design and drawings of 1 major bridge substructure and foundation in connection to NTPC-LARA projectRITES LtdDr. S R DashSIF5.756 weeks27-Jan-209-Mar-20CP204Completed
203“Design of Cell filled concrete pavements for rural roads carrying heavy trafficM/s Kohinoor Plastech, KolkataDr. Anush K CSIF3.984 months8-Jan-208-May-20CP203On-going
202Checking of the stability of foundation and superstructure of pipe conveyor for MCLM/s L&T Ltd.Dr. Sumanta HalderSIF3.982 months4-Jan-204-Mar-20CP202Completed
201Site study at Barang for Construction of Cancer HospitalAlamelu Charitable Foundation (Tata Trusts)Dr. Dinakar PaslaSIF1.481 months3-Jan-202-Feb-20CP201Completed
200Mix Design for NTPC-BHEL Project at BARHRDC Concrete India LtdDr. Dinakar PaslaSIF1.533 months8-Jan-208-Apr-20CP200Completed
199Vetting of Traffic Density Study for Environmental Clearance for Multiplex Building at BhubaneswarM/s CEMC Pvt. LtdDr. R R DashSIF0.8915 days30-Dec-1914-Jan-20CP199Completed
198Verification of Hydraulic & structural design and drawings of RWSS Mega Water Project of Puri DistrictM/s Voltas LimitedDr. Puspendu BhuniaSIF29.506 months27-Dec-1926-Jun-20CP198Completed
197Technical support for rehabilitation of defunct NH-5, Balugaon from 0/0 km to 8/0 kmChief Engineer (DPI & Roads) Odisha, Govt. of OdishaDr. U C SahooSIF3.983 months6-Dec-196-Mar-20CP197Completed
196Structural vetting of bridges and retaining walls of 2x25MW Maithan Right Bank Thermal Power Project for M/s L&T LtdL&T LtdDr. S R DashSIF29.503 months4-Dec-194-Mar-20CP196Completed
195Design verification of Boudh WSPLarsen & Toubro (L&T) ConstructionDr. Dinakar PaslaSIF5.904 months3-Dec-193-Apr-20CP195Completed
194Stability analysis and method of improving the bearing capacity from KM 56.00 to KM 57.10 - Package 2A (Construction of road bed, station buildings, passenger amenities, minor bridges, general electrical works in connection with new BG rail line from Kendrapara (Incl) KM 42.040 to Dumuku Km 57.000 on Khurdha road division of East Coast Railway in the State of Odisha, IndiaRail Vikas Nigam LimitedDr. B hanumatha RaoSIF4.062 month1-Dec-191-Feb-20CP194Completed
193Technical Scrutiny of structural drawing and design calculations of 3x300 MSV and 1x600 MSV tankCreative StudioDr. Devesh PuneraSIF1.771 month18-Nov-1918-Dec-19CP193Completed
192Verification of basic and detailed engineering design of RWSS mega water project of RairakholVoltas LimitedDr. Arindam SarkarSIF29.506 months19-Nov-1919-May-20CP192Completed
191Stability study in tailings dams and scrutiny of dry stacking procedure of red mudVedanta LimitedDr. B Hanumatha RaoSIF16.926 months24-Oct-1923-Apr-20CP191Completed
190Mix Design for married Accommodation at ChandipurMilitary Engineer Services through M/s Komal Buildcon Pvt. Ltd, Jaipur, RajasthanDr. Dinakar PaslaSIF1.152 months1-Nov-191-Jan-20CP190Completed
189Testing of Bituminous core samples of Paga-Gopinathpur-Kuanpal RoadExecutive Engineer, QC(R&B) Div. Govt. of OdishaDr. U C SahooSIF1.1915 days30-Oct-1914-Nov-19CP189Completed
188Structural vetting of 17 bridges for M/s Adani Infra (India) Ltd. At Hansdiha Godda Section under Eastern RailwayPIR Projects and Consultancy Private LimitedDr. Goutam MondalSIF23.606 months1-Oct-1931-Mar-20CP188Completed
187Proof checking of design/drawings of bearings with reference to the grade separator structure at Khandagiri Chowk (Km. 412) on NH-5 (New NH-16), BhubaneswarRKD Construction Pvt. LtdDr. S R DashSIF3.543 months26-Sep-1926-Dec-19CP187Completed
186Coriolis flowmeter studyHoneywell Technology Solutions Lab Pvt. LtdDr. Venugopal ArumuruSMS13.001 Year18-Sep-1916-Sep-20CP186Completed
185Design and development of Flow measurement SolutionHoneywell Technology Solutions Lab Pvt. LtdDr. Venugopal ArumuruSMS21.501 Year18-Sep-1916-Sep-20CP185Completed
184Checking Structural strength of pier of east coast railway constructed over luna riverRail Vikas NigamDr. Dinakar PaslaSIF1.061 month20-Sep-1920-Oct-19CP184Completed
183Design of M25 Grade RCC for Structural ElementsM/s Airports Authority of India, JharsugudaDr. Dinakar PaslaSIF1.012 months31-Aug-1931-Oct-19CP183Completed
1822nd phase monitoring settlements and effectiveness of the PVD-Package 2B - Construction of road bed, station buildings, passenger amenities, minor bridges, general electrical works in connection with new BG rail line from Dumuku KM 57.000 to Nuagaon KM 68.300 on Khurdha roda division of East Coast Railway in the state of Odisha, IndiaM/s RVNL, BhubaneswarDr. B hanumatha RaoSIF2.0015 days31-Aug-1915-Sep-19CP182Completed
181Product quality improvement program at Deem Roll Tech. LtdM/s Deem Roll Tech. Ltd., AhmedabadDr. P P DeySMMME0.612 months8-Aug-198-Oct-19CP181Completed
180Re-identification guided video synopsisKorea Institute of Science and Technology (KIST)Dr. Debi Prosad DograSES18.349 months9-Aug-199-May-20CP180Completed
179Request to assess the structural integrity of sports climbing wallDept. of Sports & Youth ServicesDr. Dinakar PaslaSIF5.613 months9-Aug-199-Nov-19CP179Completed
178Testing suitability of dredged sand for use in Road embankment & subgradeExecutive Engineer, R&D Division, BhadrakDr. U C sahooSIF2.392 months17-Jul-1917-Sep-19CP178Completed
177Structural vetting of proposed bridge for Private Railway siding near Barbil Station of Chakradharpur division in South Eastern Railway to serve M/s Rungta Mines LtdM/s PIR Projects and Consultancy Private LimitedDr. Goutam MondalSIF2.956 months14-Jun-1913-Dec-19CP177Completed
176Core sample analysis of composite clay lining of secured engineering landfill for disposal of hazardous wasteM/s RAMKY Enviro Engineers LtdDr. B hanumatha RaoSIF1.2615 days21-May-195-Jun-19CP176Completed
175Engineering operation philosophy for long term mud managementUtkal Alumina International LimitedDr. B hanumatha RaoSIF21.489 months16-Apr-1916-Jan-20CP175Completed
174Checking of bearing capacity of pile for LPG bottling plant IOCLM/s Kosan SFPL projects (P) Ltd.Dr. Dinakar PaslaSIF1.501 month20-May-1919-Jun-19CP174Completed
173Structural vetting of proposed bridge for Private Railway Siding at Mahalimarup Station to serve M/s Shree Cement Ltd, and at Lathikata of Chakradharpur division in South Eastern Railway to serve M/s Orissa Industries LtdM/s Picasona Rail Engineers & Project Private LimitedDr. Goutam MondalSIF5.162 months10-May-1910-Jul-19CP173Completed
172Technical scrutiny of Drawing and Design of Thrust Bed for Box Pushing Section Below Railway TrackM/s Tata Steel LimitedDr. Devesh PuneraSIF2.211 month29-Apr-1929-May-19CP172Completed
171Vetting of structure design/drawing for the project of KV for 6 locations at Jharkhand & Odisha StateM/s CP & DS Associates, GhaziabadDr. Sumanta HalderSIF5.0710 months11-Mar-195-Jan-20CP171Completed
170Residual stress measurement by Deep-hole drilling techniqueNMRL, DRDODr. M M MahapatraSMS39.801 year20-Mar-1931-Mar-21CP170On-going
169Development of FEM model for Design Improvement of multi layered BaffleNPOL, DRDODr. S N PanigrahiSMS18.751 year12-Mar-1910-Mar-20CP169Completed
168Testing of ferroalloy slag granulesM/s Nava Bharat Ventures LimitedDr. B hanumatha RaoSIF1.2720 days22-Mar-1919-Jul-19CP168Completed
167Mix design for M30 and M35 grade of ConcretesM/s Ultratech Cement LtdDr. Dinakar PaslaSIF1.0345 days19-Mar-1931-Aug-19CP167Completed
166Construction of new road at the missing link portion of NH81 along the approved alighment between Harischandrapur & Eastern approach of Kalindri - Bridge from Km 46.550 to Km 59.697 in the district of Malda West Bengal on EPC mM/s Dynamic Projects Pvt. Ltd.Dr. P P DeySIF1.181 year4-Feb-193-Feb-20CP166Completed
165Analysis of side slope failure and base failure and suggestion of corrective measures in connection with Angul-Sukinda New Railway Line projectRail Vikas Nigam LimitedDr. S R DashSIF11.803 months14-Mar-1914-Jun-19CP165Completed
164Proof checking of design and drawing of superstructure and substructure of a ROB at Tata Steel Plant, Kalinganagar (Span 2X36m Composite Girder)RITES LtdDr. S R DashSIF6.642 months15-Mar-1915-May-19CP164Completed
163Safety Analysis of Steel Pipeline Crossing Railroad between Surat and VadodaraM/s Dedicated Freight Corridor Corporation of India LtdDr. S R DashSIF4.131 month6-Mar-195-Apr-19CP163Completed
162Technical vetting of foundations F1 type, F2 type and F3 type and pedestals of ETP shed at IOCL GuwahatiM/s Minakshi Sarkar Engineering and ValuersDr. Goutam MondalSIF1.372 months1-Mar-191-May-19CP162Completed
161Proof checking of detailed design / drawing and calculation of foot over bridge for TSKM/s Tata Steel Limited, KalinganagarDr. Dinakar PaslaSIF11.803 months28-Jan-1928-Apr-19CP161Completed
160Process related improvements at PPLM/s Paradeep Phosphates LtdProf. Brahma DeoSMMME35.7115 months21-Jan-1920-Apr-20CP160Completed
159Upgradation of NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in State of West Bengal under Annual Plan 2017-18M/s Millenium Road Construction Pvt. LtdDr. P P DeySIF1.181 year15-Jan-1914-Jan-20CP159Completed
158Concrete Mix Design for MMLP ParadipM/s Ircon Infrastructure Services LtdDr. Dinakar PaslaSIF4.302 months20-Dec-1820-Feb-19CP158Completed
157Construction of widening to 2-lane with paved shoulder including geometric improvement Ch.318.650 km to 339.940 km (Length 21.949 km) on Churaibari to Agartala section of NH8 (Old NH44) in the state of Tripura on EPC mode (Length 21.9 km)M/s Ram Kripal Singh Construction Pvt. LtdDr. P P DeySIF1.771.5 year24-Dec-1823-Jun-20CP157Completed
156Implementation of Advanced Machine Learning Algorithms for Cluster ExpansionM/s Indo Korea Science and Technology Center, BangaloreDr. Debi Prosad DograSES28.834 years24-Dec-1823-Dec-21CP156Completed
155Technical Scrutiny of Launching Scheme of 2 Nos. Steel girder of RUB No. 46 at NH-49 at NH-49 between Belpahar and Brajrajnagar for OPGC LimitedM/s Larsen & Tubro LtdDr. Goutam MondalSIF4.432 months6-Dec-186-Feb-19CP155Completed
154Stability Analysis of Core formation with sand and local earth for new BG Rail line from Nuagaon to ParadeepM/s Rail Vikas Nigam Limited, BhubaneswarDr. Sumanta HalderSIF1.651 month12-Dec-1811-Jan-19CP154Completed
153A Model Based Decision Support & Control System for Accretion Control to increase the sponge iron production to the target annual capacity of 4,25,000 Mt through a R&D ProjectM/s Tata Sponge LimitedProf. Brahma DeoSMMME34.981 year15-Nov-1814-Nov-19CP153Completed
152Proof Checking of the design and drawings of 4 Nos. of RCC box culvert and suggestion of suitable soil stabilization for culvert No.4, at Biju Patnaik International Airport, BhubaneswarM/s Airports Authority of India, BhubaneswarDr. S R DashSIF3.542 months29-Nov-1829-Jan-19CP152Completed
151Technicqal Scrutiny of 60m Box oushing section of underpassTata Steel LtdDr. S R DashSIF2.211 month15-Nov-1815-Dec-18CP151Completed
150Evaluation of composite cements of Konark and DalmiaDalmia Cement LtdDr. Dinakar PaslaSIF1.381& 1/2 month13-Aug-1827-Sep-18CP150Completed
149Design and testing smart audio processing and communication systmes for voice processing and surveillance applicationsTrijatta technologies (P) LtdDr. M S ManikandanSES2.876 months5-Nov-186-May-19CP149Completed
148Monitor Settlements and effectiveness of the PVD-Package 2B construction of roadbed, station building, passenger amenities, Minor bridge, general electrical works in connection with new BR rail line from dumuka Km 57.00 to nuagaon km 68.300 on khurda road division of East coast railway in the State of OdishaRail Vikas Nigam LimitedDr. B hanumatha RaoSIF2.001 month8-Oct-187-Nov-18CP148Completed
147Proof Checking of Designof Foundation and superstructure of video board at Kalinga Hockey Stadium at BhubaneswarSM ConsultantsDr. Sumanta HalderSIF1.501 month28-Sep-1828-Oct-18CP147Completed
146Third party audit on fly ash generation and utilization of TTPs in Odisha for the year 2016-17SPCBDr. B Hanumatha RaoSIF3.133 months20-Sep-1820-Dec-18CP146Completed
145Technical scrutiny of structural designs for the grade separator structure at Khandagiri Chowk on NH-16, Bhubaneswar, OdishaNational Highways Authority of IndiaDr. S R DashSIF21.244 months15-Sep-1815-Jan-19CP145Completed
144Technical Scrutiny of launching scheme of six nos 30.50m open web girder of ROR bridge no. 37 of OPGC Ltd.L&T LtdDr. S R DashSIF2.661 month30-Aug-1829-Sep-18CP144Completed
143Third party quality assurance consultancy services for Kendriya Vidyalaya No.2, SambalpurBraithwaite Burn and Jessop Construction Company LtdDr. Dinakar PaslaSIF9.346 months4-Jul-182-Jan-19CP143Completed
142Design Engineering service for the retrofitting worksITC LtdDr. Dinakar PaslaSIF4.061 month25-Jul-1824-Aug-18CP142Completed
141Process control and optimization at Jindal Stainless Ltd, Jajpur,OdishaJindal Stainless LtdProf. Brahma DeoSMMME44.181 Year23-Jul-1822-Jul-19CP141Completed
140Design proof checking of five no of railway bridges of RITES Ltd in connection with construction of railway siding of NTPC Lara STTPRITES LtdDr. S R DashSIF10.475 months5-Nov-184-Apr-19CP140Completed
139Vetting / proof checking of modification of boiler registration No-OR-1537 and OR-1539Directorate of factories and boilers, OdishaProf. S K MahapatraSMS5.226 weeks10-Jul-1821-Aug-18CP139Completed
138Distributed SDN controller with end to end securityCentral Research Laboratory, Bharat Electronics LtdDr. P L BeraSES42.062 years 9 months29-Jun-1827-Mar-21CP138Completed
137Checking of design and drawing for the work construction of 7.5 MLD water treatment plant with ancillary structure at Ranibagicha, SundargarhOffice of the Executive Engineer PH Dept., RourkelaDr. R R DashSIF1.031 month25-Jun-1825-Jul-18CP137Completed
136Design of compact/ miniature ultrasonic transducerGE Oil & Gas (P) LtdDr. Venugopal ArumuruSMS2.952 months13-Jun-1813-Aug-18CP136Completed
135Person re-identification for video synopsisKorea Institute of Science and Technology (KIST)Dr. D P DograSES18.549 months11-Jun-1811-Mar-19CP135Completed
134Proof checking of the design and drawings of substructure of railway road over bridge of RITES ROB 1Y, 1x2x24m composite girderRITES LtdDr. S R DashSIF2.072 months22-May-1822-Jul-18CP134Completed
133Proof checking of the design and drawings of substructure for 2 nos of major bridges (13 revised) and 113) in connection with Angul-Sukinda Railway New BG Link ProjectRail Vikas Nigam LtdDr. S R DashSIF2.212 months23-May-1823-Jul-18CP133Completed
132UPV Test for primary sludge digestion at STP VI BhubaneswarVatech Wabag LtdDr. Dinakar PaslaSIF1.843 months5-May-185-Aug-18CP132Completed
131Electrical conductivity test in bricksJindal Steel and Power LimitedDr. Dinakar PaslaSIF2.352 months16-Feb-1816-Apr-18CP131Completed
130Inspection of defective works and submission of compliance report for construction of school building, staff quarters etc. at Kendriya Vidyalaya No. 2, Sambalpur, OdishaBraithwaite Burn and Jessop Construction Company LimitedDr. Dinakar PaslaSIF3.221 day19-Feb-1820-Feb-18CP130Completed
129Vetting of Structural Design, drawing (Pre-Engineered Building), A/c The Samaja, Mancheswar, BhubaneswarLLOYD Insulations LtdDr. Goutam MondalSIF3.781 month13-Mar-1812-Apr-18CP129Completed
128Reconstruction with geometric improvement of existing single/intermediate lane to 2 -lane with paved shoulders configuration from existing KM 92.880 to KM 121.550 of NH-125 in the state of Uttarkakhand on EPC mode, through engineering, procurement and construction (EPC) basis contract.Shivalaya constructionDr. P P DeySIF1.181 year2-Feb-181-Feb-19CP128Completed
127Rehabilitation and upgradation to two-lane with paved shoulders from KM 531/250 to KM 597/946 (Kunkuri to CG/JH border section) of NH-78 in the state of Chhattisgarh under NHDP - IV through engineers, procurement & construction (EPC) basis.Gawar-S.C.C. (JV), Rahtak, HaryanaDr. P P DeySIF2.951 year2-Feb-181-Feb-19CP127Completed
126Slope stability analysis for new BG Line from Nuagaon to ParadeepARSS InfrastructureDr. Sumanta HalderSIF3.981 year28-Feb-1827-Feb-19CP126Completed
125Consultancy services for design of structural elements of MIG 29K and HAWK-AJT infrastructure at INS DEGA, VisakhapatnamSubhadra ConsultantsDr. Goutam MondalSIF21.595 months3-Jan-182-Jun-18CP125Completed
124Checking of safe bearing capacity of pile and suitable remedial measures for ROB at Ghantapada, TalcherRITES LtdDr. Sumanta HalderSIF1.993 months3-Jan-183-Apr-18CP124Completed
123Concrete cube testing for "Cyclone alert Communication System” in EWDS-Odisha Project for the Village situated in 6 districts viz., Kendrapara, Balasore, Bhadrak, Jagatsinghpur, Puri & Ganjam along coastal line of Odisha stateRG2SK Business SolutionDr. Goutam MondalSIF0.735 months6-Apr-173-Sep-17CP123Completed
122Improvement of Tara Tarini Temple Ring Road (Regarding with protection works- Hill top portion) in the district of GanjamRural Works Dept., Govt. of OdishaDr. U C SahooSIF3.542 months20-Dec-1720-Feb-18CP122Completed
121Development of Structural Grade Concretes for TG Deck FoundationsJK Papers Mills LimitedDr. Dinakar PaslaSIF1.773 weeks21-Nov-1712-Dec-17CP121Completed
120Proof checking of guided and fixed POT PTFE bearingRail Vikas Nigam Ltd, Rail ViharDr. S R DashSIF1.483 weeks15-Dec-175-Jan-18CP120Completed
119Vetting of bearing capacity calculations of mission shakti bhawan at pokhariputIDCODr. B hanumatha RaoSIF1.843 weeks4-Oct-1725-Oct-17CP119Completed
118Design proff checking of six-buildings of RVNL work at Haridaspur-Paradeep New BG lineD K ConstructionDr. Goutam MondalSIF1.641 month20-Sep-1720-Oct-17CP118Cancelled
117Service as proof consultant for structural design components of proposed HL bridge over river biluakhaiEastrn India Construction (P) LtdDr. S R DashSIF7.382 months20-Sep-1720-Nov-17CP117Completed
116Proof Checking of 19m RCC T Beam ROB for railway siding Project of M/s Emami Cement Ltd.M/s Emami Cement LtdDr. S R DashSIF1.112 weeks1-Sep-1715-Sep-17CP116Completed
115Proof Checking of launching scheme of composite girders for ROB No. 438 of RVNL Sambalpur – Titlagarh ProjectRahee Infratech Ltd., West BengalDr. S R DashSIF1.841 month31-Aug-1730-Sep-17CP115Cancelled
114Residual stress measurement in unrestrained and restrained double "V" jointsNMRL, DRDODr. M M MahapatraSMS1.803 month31-Aug-1730-Nov-17CP114Completed
113Proof Checking of Design and Drawing of 14.2m steel semi through rail bridge girderSparsh Engineering Company (P) ltdDr. S R DashSIF0.592 weeks23-Aug-176-Sep-17CP113Completed
112Mix Design for construction of ATC tower, Biju Patnaik International Airport, BhubaneswarAirport Authority of IndiaDr. Dinakar PaslaSIF1.882 month10-Jul-1710-Sep-17CP112Completed
111Mix Design for M25 and M30 Grade concretesM/s Rathee, NBCC, BhubaneswarDr. Dinakar PaslaSIF2.392 month10-Jul-1710-Sep-17CP111Completed
110Geotechnical investigations on soil/rock samplesVedanta Limited, LanjigarhDr. B hanumatha RaoSIF14.0012-Jun-17CP110Completed
109Evaluation of Terrazyme (A bioenzyme) stabilized roads constructed under PMGSYAvijeet AgenciesDr. U C sahooSIF25.002 years12-Jun-1711-Jun-19CP109Completed
108Examination of soundness of the intake well at Pankapal on the bank of river Bramhani, Dist: JajpurIDCODr. Arindam SarkarSIF16.172 month30-May-1730-Jul-17CP108Completed
107Technical Support for application of cold mix Bitumen in Rural RoadsSAPCO Bitumen Company LtdDr. U C sahooSIF30.003 years25-Apr-1724-Apr-20CP107Completed
106Designing of video synopsys algorithms for visual surveillanceKorea Institute of Science and TechnologyDr. Debi Prosad DograSES40.392 years26-Apr-1725-Apr-19CP106Completed
105Design and drawing of minor bridges of RVNL proof checkingRail Vikas Nigam Ltd.Dr. S R DashSIF8.634 month12-Apr-1712-Aug-17CP105Completed
104Mix Design of cement treated base/ sub-base for PMGSY road in OdishaRural Works Dept., Govt of OdishaDr. U C sahooSIF94.852 month20-Mar-1720-May-17CP104Completed
103Proof checking of launching scheme of composite girders for ROB no 439 A and 423A of RVNL Sambalpur Titlagarh ProjectRahee Infratech Ltd, West BengalDr. S R DashSIF1.152 week5-Apr-1719-Apr-17CP103Completed
102Vetting/ Proof checking of refrigeration for 3000 MT and 5000 MTEngeering Projects (India) LtdProf. S K MahapatraSMS3.593 week6-Apr-1727-Apr-17CP102Completed
101Strategies to counter energy imbalances in an aluminium reduction cell with an insert in the cathode collector barTata International LtdDr. Randhir SinghSMMME1.276 month22-Mar-1720-Sep-17CP101Completed
100Proof checking of structural items of Rambili ProjectM/s Suvadra ConsultantDr. S R DashSIF14.954 month18-Mar-1718-Jul-17CP100Completed
99Vetting of second floor structure of CESU building for additional loadIDCO, BBSRDr. B hanumatha RaoSIF1.872 month6-Mar-176-May-17CP099Completed
98Dyke height raising of fly ash pondVedanta Limited, LanjigarhDr. B hanumatha RaoSIF6.742 month1-Mar-171-May-17CP098Completed
97Characterization of soils treated with Zydex products for its use in PMGSY RoadsZydex Industries (P) LtdDr. U C sahooSIF2.302 month1-Mar-171-May-17CP097Completed
96Mix Design for WMM & GSB with optimum utilisation of granulated slagTata Steel Ltd., Kalinga nagarDr. U C SahooSIF1.151 week9-Feb-1716-Feb-17CP096Completed
95Accretion control to increase the sponge iron production to the target annual capacity of 390000Mt.Tata Sponge Iron LtdProf. Brahma DeoSMMME13.111.5year15-Mar-1713-Sep-18CP095Completed
94Proof checking of major bridge @Ch 1+445 of NH-149 pallahara to pitiri section, OdishaRKD Construction Pvt. LtdDr. S R DashSIF2.881 month26-Jan-1725-Feb-17CP094Completed
93Review of science hopper lab in the class program - PhysicsScience Hopper Education (P) Ltd., BangaloreDr. S ChatterjeeSBS0.673 month20-Jan-1720-Apr-17CP093Completed
92Vetting of design and drawings of aranya bhavan 6th floor conference roomIDCODr. B Hanumatha RaoSIF1.502 week2-Jan-1716-Jan-17CP092Completed
91Structural stability for the building with revised loading conditions of 2nd floor level with its retrofitting actionsNBCC (I) Ltd.Dr. Sumanta HalderSIF8.003 month9-Jan-179-Apr-17CP091Completed
90Vetting of the AFS Hanger at Bagdogra, super structure drawing (Steel Structure)M/s MES Engineering, KolkataDr. Goutam MondalSIF1.751 month30-Jan-1629-Feb-16CP090Completed
89Third party audit on the fly ash generation & utilization by TPPs in Odisha for the year 2015-16M/s State Pollution control Board, OdishaDr. B hanumatha RaoSIF2.592 week17-Feb-173-Mar-17CP089Completed
88Proof Checking of Design Splice & its adequacy by M/s S M Consultancy for 30m FOB girderRail Vihar Nigam Ltd. WaltairDr. S R DashSIF0.412 week9-Jan-1723-Jan-17CP088Completed
87Monitoring and quality assurance of construction of international standard sport climbing wall at kalinga stadium, BBSROutdoor SchoolDr. Sumanta HalderSIF7.103 months9-Jan-179-Apr-17CP087Completed
86Proof checking of design and drawing of substructure in connection with Angul-Sukinda for 16 nos of major bridges of RVNLRail Vihar Nigam Ltd. BBSRDr. S R DashSIF11.006 months9-Jan-1710-Jul-17CP086Completed
85Testing pf CC cores of RE Facia PanelNHAI, PIU-BBSRDr. U C SahooSIF1.731 week2-Jan-179-Jan-17CP085Completed
84Construction of new road at the missing link portion of NH81 along the approved alignment between Harischandrapur and eastern approach of kalindri - bridge from Km 46.550 to km59.697 in the district of Malda, West Bengal on EPC modeDynamic Projects (P) LtdDr. P P DeySIF2.301 year21-Dec-1620-Dec-17CP084Completed
83Proof checking of design and drawings of substructure for 6 nos of major bridges of RVNLRail Vikas Nigam LtdDr. S R DashSIF2.161.5 month15-Nov-1630-Dec-16CP083Completed
82Quality test of Railway track stone (Gudiakateni & Chandikhol)Jyoti ConstructionDr. U C sahooSIF0.301 week22-Nov-1629-Nov-16CP082Completed
81Development of structural grade concretes utilizing Iron slag as sand replacements (Tata Steel, Jaipur, Odisah)Tata Steel, Kalinga NagarDr. Dinakar PaslaSIF5.743 month21-Oct-1621-Jan-17CP081Completed
80Proof checking of design and drawing of substructure and foundation abutment-2 of bridge no -76Rail Vikas Nigam LtdDr. S R DashSIF0.862 weeks17-Oct-1631-Oct-16CP080Completed
79Vetting of Structural design and drawing of the Dinjan Hanger foundationLLOYD Insulations LtdDr. Goutam MondalSIF0.301 month21-Jun-1621-Jul-16CP079Completed
78Analysis and Implementation of non chronological video synopsis and indexingIndo Korea Science and Technology Center, BangaloreDr. Debi Prosad DograSES15.001 year4-Oct-163-Oct-17CP078Completed
77Technical support on pile design in L iquefiable soils for the building at the Sewage Treatment Plant (Tunasan STP)Vatech Wabag LtdDr. S R DashSIF2.882 weeks26-Sep-1610-Oct-16CP077Completed
76Proof checking of structural calculation/ drawing for proposed construction of JNV/ Nayagarh (Phase-B) works at OdishaBuildsol, Architectural & Engineering ConsultantsDr. S R DashSIF0.652 weeks17-Sep-161-Oct-16CP076Completed
75Widening and strengthening of Khunti-Torpa-Kolebira Road (from 0.00 km to 82.055 km) to 2-lane with paved shoulderGawar-S.C.C. (JV), Rahtak, HaryanaDr. P P DeySIF3.521.6 year9-Sep-1616-Apr-18CP075Completed
74Mix design for glass fibre reinforced concrete for IMDC Mancheswar, BhubaneswarNBCC, BhubaneswarDr. Dinakar PaslaSIF1.643 month17-Aug-1617-Nov-16CP074Completed
73Vetting of feasibility study of pre-treatment of coke oven and by-product plant effluent in coal gasification process units for recovery of Phenol and AmmoniaJindal Steel and Power LimitedDr. P BhuniaSIF5.751.5 month11-Aug-1625-Sep-16CP073Completed
72Proof checking of design and drawing of road under bridge (RUB) No-68 of RVNLRail Vikas Nigam Ltd, Rail ViharDr. S R DashSIF0.361 month9-Aug-168-Sep-16CP072Completed
71Widening and strengthening from km 94.000 to 131.000 of NH-133 in the state of Jharkhand through EPC Basis contractGawar-S.C.C. (JV), Rahtak, HaryanaDr. P P DeySIF1.591 year1-May-1630-Apr-17CP071Completed
70Mix Design for M25 for Mahanadi Institute of medical sciences and research at Talcher , Angul, OdishaNBCC, TalcherDr. Dinakar PaslaSIF3.113 month27-Jul-1627-Oct-16CP070Completed
69Study of Probabilities and changes in frequencies and intensities of tropical cyclones and associated wind and rainfall over Puri district of Odisha in climate change projection [Period: 1891-2015]Institute for Social and Environmental Transition-International (ISET-I)Prof. U C MohantySEOCS4.023 month28-Jul-1628-Oct-16CP069Completed
68Mix Design of M30 Grade Concrete for ITC HotelPrime Techno Engineers (P) Ltd.Dr. Dinakar PaslaSIF0.451 month2-Jul-161-Aug-16CP068Completed
67Endorsement of the estimation of production quantities of sponge iron and steel billets of Maa Mahamaya Industries Ltd, R.G. Peta in the years 2006-07, 2007-08 and 2008-09 from the charge mix usedMaa Mahamaya Industries LtdDr. V Pandu RangaSMS1.201 Week7-Jul-1614-Jul-16CP067Completed
66Proof checking of design and drawing for 2 nos of S&T Cabin building for M/S NTPC at KanihaRITES LtdDr. S R DashSIF0.722 week17-Jun-161-Jul-16CP066Completed
65Proof checking of design and drawing of substructure for major bridges no 115 and 131Rail Vikas Nigam Ltd, Rail ViharDr. S R DashSIF1.151 month21-Jun-1621-Jul-16CP065Completed
64Technical and function test of Gagan enabled GPS PDAsConservator for Forest, GIS, Aranya BhawanDr. P R SahuSES1.951.5 month10-May-1524-Jun-15CP064Completed
63Video analysis algorithms to detect unusual behaviour in crowd and trafficoutdu Media Tech Pvt. Ltd.Dr. Debi Prosad DograSES6.523 months15-Jun-1615-Sep-16CP063Completed
62Design and developing a portable wireless noise level and vibration monitorsPentagon Rugged Systems India (P) LtdDr. M S ManikandanSES1.043 months15-May-1615-Aug-16CP062Completed
61Design and developing a portable wireless air quality monitorPentagon Rugged Systems India (P) LtdDr. M S ManikandanSES2.443 month15-May-1615-Aug-16CP061Completed
60Testing of Panels for energy absoption testILFS SIFDr. Dinakar PaslaSIF2.861 month23-May-1622-Jun-16CP060Completed
59Inspection of quality control laboratoryMaa Mahamaya Industries LtdDr. V Pandu RangaSMS1.191 week6-May-1613-May-16CP059Completed
58Implementation of water quality monitoring and management systemPentagon Rugged Systems India (P) LtdDr. M S ManikandanSES1.492 months15-Apr-1615-Jun-16CP058Completed
57Testing of light weight aggregates (LWAs) in various concrete grades and the physical and chemical testing of the aggregates and also the structural load behaviour of the LWA concretesJindal Steel and Power LimitedDr. Dinakar PaslaSIF5.643 months12-May-1612-Aug-16CP057Completed
56Proof Checking of Design and Drawing of Substructure of Railway Bridge of RVNLRail Vikas Nigam Ltd, Rail ViharDr. S R DashSIF0.861 week8-Apr-1615-Apr-16CP056Completed
55Vetting of structure and superstructure of sports climbing facility at Kalinga Stadium confirming to IFSC standardOutdoor SchoolDr. Sumanta HalderSIF4.093 months10-Mar-1610-Jun-16CP055Completed
54Stability study of the ash filled areaVedanta LimitedDr. B hanumatha RaoSIF3.141 year10-Feb-168-Feb-17CP054Completed
53C/C++ implementation with adequate GUI for sparsity based abnormal event detectionIndo Korea Science and Technology Center, BangaloreDr. Debi Prosad DograSES7.006 months10-Feb-1610-Aug-16CP053Completed
52C/C++ implementation with adequate GUI for temporal analysis of motif mixtures using Dirichlet processIndo Korea Science and Technology Center, BangaloreDr. Debi Prosad DograSES8.006 months10-Feb-1610-Aug-16CP052Completed
51Design and Drawing for Katekela Lagoon-2 ash pondVedanta LimitedDr. B hanumatha RaoSIF8.191 Year30-Oct-1528-Oct-16CP051Completed
50Strenghthening and Widening/ Reconstruction of Dumka Masalia-Nala upto West Bengal Border Road lane with paved shoulder under EPC Mode (55 km)Barbrik_RCPL(JV)Dr. P P DeySIF2.361year30-Oct-1529-Oct-16CP050On-going
49Design of experimental road using fly ashSesa Sterlite LimitedDr. B hanumatha RaoSIF3.082 months30-Oct-1530-Dec-15CP049Completed
48Technical Evaluation of cement concrete roads in OdishaPlanning & Coordination Dept., Govt. of OdishaDr. U C sahooSIF28.168 months30-Oct-1530-Jun-16CP048Completed
47Technical Scrutiny of irrigation road proposal under IRC & ISWater Reseources Dept., Govt. of OdishaDr. U C sahooSIF4.263 month13-Nov-1513-Feb-16CP047Completed
46Vetting of schematic drawing along with transmission loss calculation for 6.6KV/ 415V OHDC lineMegha Engineering & SIF Ltd.Dr. S B KarankiSES0.332 weeks30-Sep-1514-Oct-15CP046Completed
45Modelling of the Cathode assembly in Aluminium reduction cellTata International LtdDr. Randhir SinghSMMME0.743 month16-Sep-1516-Dec-15CP045Completed
44Preparation of DPR for the proposed National Institute for New Energy & Innovation at BhubaneswarMinistry of New Renewable Energy, Govt. of IndiaProf. N C SahooSES5.0014-Oct-15CP044Completed
43Improvement and upgradation of two lane with paved shoulder configurationof Koderma-Domchanch-Khorimahua-Jamua Road (SH-13) under EPC mode in JharkhandOn behalf of NIT Durgapur as external expert RKS Constuction (P) Ltd. RanchiDr. P P DeySIF4.002 year27-Jul-1526-Jul-17CP043Completed
42Conducting Mix Design for M50 for NBCC BhubaneswarNBCC LtdDr. Dinakar PaslaSIF1.333 month11-Jul-1511-Oct-15CP042Completed
41Geotechnical investigations on soil/rock samplesNBCC LtdDr. B hanumatha RaoSIF1.201 week24-Jun-151-Jul-15CP041Completed
40Process optimization studies on leaching of high ash coal to produce low ash coalTata Steel LtdProf. N P H PadmanabhanSMMME6.757 month15-May-1511-Dec-15CP040Completed
39Survey on process study of CPC and EPC of Amritesh Industries Pvt. Ltd, AngulAmritesh Industries Pvt. Ltd.Dr. Akhilesh BarveSMS0.401 Week24-Jun-151-Jul-15CP039Completed
38Testing of Ballast from Baghua QuerryMaa Chandi Stone CrushingDr. S R DashSIF0.171 week5-Jun-1512-Jun-15CP038Completed
37Surge analysis for 1000mm Dia water rising main at JajpurIDCODr. Arindam SarkarSIF1.901 month27-May-1526-Jun-15CP037Completed
36Proof checking of srtructural design nad drawingHindustan steel works construction Ltd.Dr. S R DashSIF0.432 weeks12-May-1526-May-15CP036Completed
35Survey of capacity assessment of Amritesh Industries Pvt. Ltd.Amritesh Industries Pvt. Ltd.Dr. V Pandu RangaSMS0.271 week6-May-1513-May-15CP035Completed
34Design and analysis for making rural road about 1 km by using JK Paper Mills fly ashJK Papers Mills LimitedDr. B Hanumatha RaoSIF2.851.5 month20-Apr-154-Jun-15CP034Completed
33Assessment of structural safety of construction of balance six floor of the IDCOL corporate office building, BBSRIDCODr. Sumanta HalderSIF12.643 month9-Apr-159-Jul-15CP033Completed
32Testing of materials and conducting design mix M-25,M-30 & M-40 in connection with construction of commercial cum residential complexNational Building construction corporation Ltd.Dr. P BhuniaSIF4.389-Apr-15CP032Completed
31Report on Dolomite and its usage in sponge Iron productionGanesh Sponge (P) Ltd.Dr. Soobhankar PatiSMMME0.301 day17-Mar-1518-Mar-15CP031Completed
30Opinion regarding the dri reduction furnace at JSPL plant AngulKazstroy Services SIF Pvt. LtdDr. Dinakar PaslaSIF2.813 month18-Mar-1518-Jun-15CP030Completed
29Assessing the soil for earth work constructionIVRCL LimitedDr. B hanumatha RaoSIF0.531 Week12-Mar-1519-Mar-15CP029Completed
28Testing of AAC BlocksOvertop marketing (P) Ltd.Dr. Dinakar PaslaSIF3.072 month12-Mar-1512-May-15CP028Completed
27Testing of AAC BlocksFast Build Blocks Pvt. LtdDr. Dinakar PaslaSIF0.772 month13-Mar-1513-May-15CP027Completed
26Vetting/checking of the project report prepared by CEMCPL for Ordnance Factory, Ambajhari, NagpurCentre for Envotech and Management Consultancy (P) LtdDr. R R DashSIF1.401 month30-Jan-151-Mar-15CP026Completed
25Robotic application in boiler NDT assessmentOMS Power Training and research InstituteDr. V Pandu RangaSMS3.292 months7-Jan-157-Mar-15CP025Completed
24Testing of Fibre shorcrete panels for energy absorption testLeighton India Contractors (P) LtdDr. Dinakar PaslaSIF4.683 months4-Dec-144-Mar-15CP024Completed
23Design and stability analysis of an embankment for new BG rail line from Haridaspur to Paradeep in the Khurda district OdishaTracks & Tower Infratech (P) LtdDr. B Hanumatha RaoSIF3.651 month2-Dec-141-Jan-15CP023Completed
22Testing of Fibre shorcrete panels for energy absorption testLeighton India Contractors (P) LtdDr. Dinakar PaslaSIF5.263 months6-Nov-146-Feb-15CP022Completed
21Issue of Check Proof Certificate and Procedure for the rectification of FOB along with necessary drawing regardingMcML-ECI(JV)Dr. S R DashSIF1.262 Weeks16-Sep-1430-Sep-14CP021Completed
20Assessment of High Compressibility of cut spoilTracks & Tower Infratech (P) LtdDr. B hanumatha RaoSIF1.261 month16-Sep-1416-Oct-14CP020Completed
19Widening & Strengthening of Bhawanipatna-Gunupur-Kasipur Road (SH-44) to 2 Lane without paved shoulder from Km 0/000 to 13/000 & Km 42/940 to Km 48/840 on EPC mode in the district of KalahandiOffice of the Executive Engineer Koraput (R&B) DivisionDr. B hanumatha RaoSIF0.501 month12-Sep-1412-Oct-14CP019Completed
18Vetting of structural Design and Drawing for the Construction of L.I.G and L.M.I.G housing Complex along with Commercial Complex at Kalinga Nagar Zone- K4BDADr. S R DashSIF--13-Aug-14CP018Cancelled
17Impact Assessment study of city bus services operational under JnNURMHousing and Urban Development Department, Govt of OdishaDr. Debasis BasuSIF6.984 month13-Aug-1413-Dec-14CP017Completed
16Proof Checking of POT cum PTFE BearingBhubaneswar Expressways Pvt. LtdDr. Dinakar PaslaSIF1.011 month30-Jul-1429-Aug-14CP016Completed
15Co-operation and expert advice for improvement of short and extended range (monthly scale) prediction of rainfall in the tropicsRIMESProf. U C MohantySEOCS10.001 Year18-Jun-1417-Jun-15CP015Completed
14Design and testing aerated autoclaved fly concrete blocks (AAC)Fast Build Blocks Pvt. LtdDr. Dinakar PaslaSIF1.181 month10-May-149-Jun-14CP014Completed
13Consultancy for investigation in ARC, CharbatiaAirports Authority of India, Biju Pattanaik AirportDr. Dinakar PaslaSIF13.493 month16-May-1316-Aug-13CP013Completed
12Proof checking of design and drawing of three no. box bridges under Railway loading in connection with construction of railway siding to serve Koderma Thermal Power Plant (2x500MW) of DVCRITES LtdProf. S.C. DuttaSIF3.793 month14-Nov-1214-Feb-13CP012Completed
11Database for Principal Technical Agency & State Technical Agency for states of Jharkhand and OdishaNRIDADr U C SahooSIF42.7230-Aug-12CP011Completed
10Design of weighbridge & moveable floor craneDS SystemsDr. S N PanigrahiSMS1.1610 months14-Jun-1210-Apr-13CP010Completed
9Design of two number of 220KV transmission line tower foundations between Kantapalli to Hindalco in the mahanadi riverHindalco Industries Ltd.Dr. Arindam SarkarSIF7.188 months11-Apr-1211-Dec-12CP009Completed
8House hold energy consumption survey-2012WMGDr. S R SamantaraySES1.201 Year24-Mar-1223-Mar-13CP008Completed
7Proof Checking of design of pile foundations for location no. 16A and 24 of 220 KV transmission line tower from Bidanasi ( Cuttack) near the bank of Kathajodi to Nuapada (Cuttack) in the spill zoneOrissa Power Transmission Corporation LimitedDr. Sumanta HalderSIF2.271 month19-Oct-1118-Nov-11CP007Completed
6Vetting of structural analysis of design and drawing for the new residential complex at HAL KoraputHALProf. S.C. DuttaSIF5.001 month18-Oct-1117-Nov-11CP006Completed
5Proof Checking of design of river bed pile foundation for location no. 10,12 & 15 of 220KV transmission line from Bidanasi to Cuttack grid substationOrissa Power Transmission Corporation LimitedDr. Sumanta HalderSIF3.311 month31-May-1130-Jun-11CP005Completed
4Preparation of special Foundation for 220KV Tower for Two locations(158-c & 159)Hindalco Industries Ltd.Dr. Arindam SarkarSIF4.841 month6-May-115-Jun-11CP004Completed
3Proof Checking od 3 Nos panel cabin building and 1 no. gate lodge/IBS Building for M/s. Nalco AngulRITES LtdDr. Dinakar PaslaSIF0.603 months11-Oct-1011-Jan-11CP003Completed
2Remedial Measures for Horizontal and vertical Cracks Developed in the walls, floors, roof etc of ESI Hospital, JaykaypurESI CorporationDr. Dinakar PaslaSIF3.953 months6-Sep-106-Dec-10CP002Completed
1Vetting of the design of lighting masts and their foundations in connections with commissioning of lighting systems of wankahade stadiumBajaj Electricals Ltd.Prof. S.C. DuttaSIF1.101 month17-Sep-0917-Oct-09CP001Completed