IIT Bhubaneswar

Supply, installation, Testing & Commissioning of 40W Post top lights along with 3.5m(0.5m) hot dip Galvanized iron two section Tubular pole with laying of required electrical cables at Residential & Academic area of IIT Bhubaneswar

Start Date
04/11/2025
End Date
18/11/2025
Skip to content